Western Regional Gas Conference August 25, 2010 Simple, Handy, Risk-based Integrity Management Plan (SHRIMP)

Slides:



Advertisements
Similar presentations
Operator Qualification
Advertisements

Joe Killins & Associates, LLC Pipelines & Risk Based Management How Safe is Safe?
Integrity Management Program Special Permits (IMP-SP) Draft Administrative Plan 12/5/2007.
1 MASSACHUSETTS UNDERGROUND STORAGE TANK (UST) PROGRAM Baseline Compliance Assessment 1 MassDEP 8/2/2011.
Ohio’s One-Stop Utility Resource Gas Pipeline Safety Pipelines - State and Local Issues Pete Chace GPS Program Manager (614)
AGA Perspectives on Current Pipeline Safety Regulations August 2014.
Overview of Key Rule Features
Oscar Flores Accounting I FINANCIAL ANALYST. Financial analysts provide guidance to businesses and individuals making investment decisions. Financial.
Pipeline Corrosion Management NACE Houston Section April 9, 2013 Drew Hevle - Manager, Corrosion Control Kinder Morgan Natural Gas Pipeline.
Session 6: Data Integrity and Inspection of e-Clinical Computerized Systems May 15, 2011 | Beijing, China Kim Nitahara Principal Consultant and CEO META.
Avoiding a Dam Midlife Crisis 2011 NWHA Annual Conference Scott Larrondo—Idaho Power Company Manager, Power Plant Engineering & Construction.
Internal Auditing and Outsourcing
ILLINOIS COMMERCE COMMISSION Darin Burk Pipeline Safety Program Manager.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration San Bruno – Lessons Learned Alan K. Mayberry, P.E. Deputy Associate.
SCC DA Program Stress-corrosion-cracking direct assessment (SCCDA) is a structured process that contributes to pipeline company’s efforts to improve.
1 DHS Bioterrorism Risk Assessment Background, Requirements, and Overview DHS Bioterrorism Risk Assessment Background, Requirements, and Overview Steve.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Harold Winnie, CATS Manager (Central Region) Leak detection for.
BTS730 Communications Management Chapter 10, Information Technology Management, 5ed.
Gerry Lee APGA Security and Integrity Foundation OQ Program Manager APGA Security and Integrity Foundation Interstate Municipal.
1 Distribution Integrity Management Update Tuesday, August 21, 2007 Western Regional Gas Conference Tempe, AZ Glen Armstrong, EN Engineering
SHRIMP: Model Distribution Integrity Management Plan Development Tool John Erickson, PE American Public Gas Association.
Western Regional Gas Conference August 25, 2009 Distribution Integrity Management Programs (DIMP) & SHRIMP.
Technical Advisory Committee December 2012 Fitness for Service.
IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN.
Distribution Integrity Management John Erickson, PE American Public Gas Association.
Physical Building Audit Physical Building Audit By; Engr.Dr.Attaullah Shah PhD ( Civil) Engg, MSc Engg ( Strs), BSc Engg ( Gold Medalist),), MBA, MA (
Western Regional Gas Conference August 24, 2010 Distribution Integrity Management Programs (DIMP) Rule.
1 DIMSA A Distribution Integrity Management SME Approach August – 2009.
RAILROAD COMMISSION OF TEXAS Stephanie Weidman Austin Regional Manager Oversight and Safety Division Pipeline Safety September 2015.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration National Association of Pipeline Safety Representatives US DOT.
2010 Western Regional Gas Conference DIMP- Beyond the Final Rule August 24, 2010 Tempe, AZ Bruce L. Paskett P.E. Principal Compliance Engineer NW Natural.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Regulatory and Compliance Landscape Western Region Gas Conference.
Industry & Research: Issues, needs and conclusions from the US IMPACT Investigation of Extreme Flood Processes & Uncertainty Workshop at HR Wallingford,
Distribution Integrity Management – What To Expect John Erickson, PE American Public Gas Association Western Regional Gas Conference.
Office of Pipeline Safety Integrity Management Inspection Process Louisiana Pipeline Safety Seminar August 2003.
Technology Transfer Execution Framework. 2 © 2007 Electric Power Research Institute, Inc. All rights reserved. Relationship Between Your EPRI Value and.
RAILROAD COMMISSION OF TEXAS Alan C. Mann Oversight and Safety Division September 2015.
Aging Infrastructure Management and Challenges Sue Fleck Vice President Pipeline Safety Trust “Getting to Zero’ Conference 2011.
An Industry Response to the Expected Control Room Management Rule Western Regional Gas Conference Daron Moore – El Paso Pipeline Group August 25, 2009.
ILLINOIS COMMERCE COMMISSION Darin Burk Manager – Pipeline Safety 1.
Pipeline Safety: How the Mayor’s Council On Pipeline Safety Can Help Presentation to: Mayor’s Council on Pipeline Safety Conference Name: Christopher A.
Analysis & Presentation of Integrity Management Audit Results Western Regional Gas Conference August 21, 2007 Gary R. White.
PHMSA Pipeline Safety Programs Update Office of Pipeline Safety 2007 Western Regional Gas Conference Tempe, Arizona August 21, 2007.
A Framework for Your Pipeline Integrity Program. 2 A Few Thoughts Before Beginning l This rule is new to the pipeline industry although many of the concepts.
What’s Wrong with Integrity Management? How Do We Improve Integrity Management? Terry Boss Senior Vice President Safety Environment and Operations PST.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Current Rulemakings.
Pipeline Performance Measures Alan Mayberry New Orleans, Louisiana Pipeline Safety Trust Annual Conference
IS 630 : Accounting Information Systems Auditing Computer-based Information Systems Lecture 10.
How Old is too Old? Who Makes that Decision? Alan Mayberry New Orleans, Louisiana Pipeline Safety Trust Annual Conference
U.S. DOT Pipeline and Hazardous Materials Safety Administration Integrity Management Systems November 18, 2015 Chris McLaren - 1 -
Stress Corrosion Cracking (SCC) Josef Kopec, P.Eng.
NC AWWA-WEA 95th Annual Conference
OPS Observations, Expectations, and Concerns Zach Barrett (OPS) Direct Assessment Workshop November 4, 2003.
Need Information or Assistance? Where to go, what’s available and what’s not.
Distribution Integrity Management Program
Gas Pipeline Safety Federal Regulatory Update Pete Chace Public Utilities Commission of Ohio Gas Pipeline Safety Program Manager.
European Diagnostic Manufacturers Association EQA contribution and industry expectations Dr. Claude GIROUD – Chairman Standardization, Quality & Risk Management.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Current Rulemakings.
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
Integrity Management Continuous Improvement Project Status and Implementation Process Presentation for: PHMSA Advisory Committees July 11, 2012.
Building an Effective Paperless Records Management Governance Structure BADM 559 Enterprise IT Governance Professor Michael Shaw By Moh’d A. Obeidat 12/15/2008.
Project Management PTM721S
Project Quality Management
APGA Security and Integrity Foundation
Update on regulations and SIF programs American Public Gas Association
CIS12-3 IT Project Management
Distribution Integrity
Neopay Practical Guides #2 PSD2 (Should I be worried?)
Awareness and Auditor training kit
Presentation transcript:

Western Regional Gas Conference August 25, 2010 Simple, Handy, Risk-based Integrity Management Plan (SHRIMP)

SHRIMP Software product similar to tax preparation software (TurboTax) SHRIMP asks the user a series of questions about the system and its inspection and maintenance history Questions are based on GPTC guidance Questions change based on answers Output is a complete written DIM Plan

SHRIMP Development Advisory Group made up of state regulators, federal regulators and industry Technical Toolboxes is software developer Heath and Associates, Technical Consultant Viadata, Technical Consultant Funded by a cooperative agreement between PHMSA and the APGA Security and Integrity Foundation (SIF)

The DIM Plan Template 1. SCOPE 2. DEFINITIONS 3. KNOWLEDGE OF THE DISTRIBUTION SYSTEM 4. THREAT EVALUATION 5. RISK EVALUATION AND PRIORITIZATION 6. ADDITIONAL/ACCELERATED MEASURES TO ADDRESS RISKS

Plan Template continued 7. MEASURE PERFORMANCE, MONITOR RESULTS AND EVALUATE EFFECTIVENESS 8. PERIODIC EVALUATION AND IMPROVEMENT 9. REPORTING 10. RECORD KEEPING ATTACHMENTS

How SHRIMP Addresses LEAKS

Example: External Corrosion SHRIMP asks questions about: – Exposed pipe inspection results – Cathodic protection levels – Miles of pipe by type and # of corrosion leaks repaired for past 5 years. SHRIMP performs a statistical analysis to detect upward or downward trends in corrosion leak rates – Presence of monitored leaks – And more

SHRIMP Risk Ranking Model Risk = Probability times Consequence GPTC and SHRIMP questions address probability of a failure for each threat – each answer is given a weighting based on SME SHRIMP advisors developed questions to address consequences with weighting based on SMEs Risk scores are further adjusted based on national probability of failures resulting in incidents, and The operator’s own record of leaks repaired by threat

SHRIMP Risk Ranking Model Probability Score for each threat (1-10) Consequence Multiplier (1 – 1.5) Inter-threat Weightings – One based on operator’s leak repair history – Second based on probability of leaks resulting in reportable incidents (based on PHMSA national annual and incident report data )

Select Additional/Accelerated Actions For each threat SHRIMP will offer a pick list of possible additional/accelerated actions These come from GPTC, with additions by the SHRIMP advisors Based on answers to the threat assessment questions some A/As may be recommended and others not offered Example: If CP levels are good, upgrading CP may not be offered as an A/A Action

Additional/Accelerated Actions

Performance Measures

SHRIMP Creates a Written DIM Plan Documents significant decisions made in previous steps Addresses all required elements Includes required provisions for LEAKS, EFVs and mechanical coupling failure reporting

Pricing First year’s subscription good thru 8/2/2011 # of ServicesAnnual Fee Up to 1,000Free 1,001 to 5,000$100 5,001 to 20,000$250 20K to 35K$500 35K to 50K$750 50K to 75K$1,500 Over 75,000$5,000

Questions?