Red Lake Watershed District 10 Year Overall Comprehensive Plan Red Lake Watershed District & HDR Engineering, Inc. Thief River Falls, Minnesota Presentor:

Slides:



Advertisements
Similar presentations
Restore Lawyer Creek Habitat: Targeting Steelhead and Chinook Salmon.
Advertisements

Lawyer Creek Steelhead Trout Habitat Improvement Project presented by: Lewis Soil Conservation District.
1 Nicole Carlozo NOAA Coastal Management Fellow June 7, 2013 Integrating Water Quality and Coastal Resources into Marine Spatial Planning in the Chesapeake.
WATER QUALITY ANALYSIS for ANTIDEGRADATION
Management Plan: An Overview
Watershed Approaches and Community Based Planning
7:00 pmWelcome and introductions 7:05pmHLWD planning overview Plan update process 7:25 pmStakeholder involvement Watershed problems 7:40 pmPublic comment.
Red Lake River Farm to Stream Tile Drainage Study - Red Lake Watershed District –
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
Terrain for the Lower Colorado River Flood Damage Evaluation Project Erin Atkinson, Halff Associates, Inc. Rick Diaz, Lower Colorado River Authority Symposium.
The Benefits of Investing In Conservation… …and the Costs of Not Investing Developed by Daniel Mountjoy USDA - Natural Resources Conservation Service Laura.
Federal Realty Investment Trust (FRIT) Eastgate Shopping Center Chapel Hill, NC September 9, 2008.
Ch  Know what design frequency means  Know how to delineate a drainage area on a topographic map 2.
Getting the Big Picture How to Look at Your Watershed Indiana Watershed Planning Guide,
EEP Watershed Planning Overview August 12, Ecosystem Enhancement Program Nationally recognized, innovative, non-regulatory program formed in July.
Maintaining Watersheds. Next Generation Science/Common Core Standards addressed! HS‐ESS2‐5. Plan and conduct an investigation of the properties of water.
Community-based Education K-12 students serving as a resource for meeting community needs.
Jeremy Erickson, Lucinda B. Johnson, Terry Brown, Valerie Brady, Natural Resources Research Institute, University of MN Duluth.
FNR 402 – Forest Watershed Management
Comprehensive Basinwide Protection Recommendations 13 Primary Principals: 1.Serve as framework moving forward 2.Establish acceptable levels of protection.
Marin County Watershed Stewardship Plan
COMPREHENSIVE FLOODPLAIN MANAGEMENT : Promoting Wise Uses of Floodplains CA Department of Water Resources/ CIFMCG Workshop July 2006.
GIS Tools for Watershed Delineation Public Policy Perspectives Teaching Public Policy in the Earth Sciences April 21, 2006 Gary Coutu Department of Geography.
Water Quality Associated with Urban Runoff: Sources, Emerging Issues and Management Approaches Martha Sutula and Eric Stein Biogeochemistry and Biology.
Hydrologic Cycle. Hydrologic Cycle Processes Surface Water Soil water Atmospheric water Groundwater Processes Precipitation Evaporation Surface Runoff.
Introduction to PA Act 167 Stormwater Management Planning Little Juniata River Watershed April 21, 2005.
Prioritizing Agricultural Lands for Riparian Buffer Placement in the Raritan Basin: A Geographic Information System (GIS) Model Project Partners: North.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
A Plan to Get Savvy About Urban Watersheds Dan Cloak, Dan Cloak Environmental Consulting Beau Goldie, Santa Clara Valley Water District Lorrie Gervin,
Predicting Sediment and Phosphorus Delivery with a Geographic Information System and a Computer Model M.S. Richardson and A. Roa-Espinosa; Dane County.
Red Lake Watershed District Water Quality Monitoring.
1. Natural Resources Conservation Service Strategic Plan Strategic Plan
Sustaining Long Term Regional Coordinated Monitoring Programs Todd Running, H-GAC May 9, 2006.
Rush River Assessment Project Hydrologic Flow Study Sibley County SWCD Presentation to the Minnesota River Research Forum March 10, 2005.
ArcHydro – Two Components Hydrologic  Data Model  Toolset Credit – David R. Maidment University of Texas at Austin.
ESValue-SWF Valuing Ecosystem Services on Public Lands in Southwest Florida.
Municipal GIS Applications JOHN C. CHLARSON, P.E. UNIVERSITY OF TENNESSEE MUNICIPAL TECHNICAL ADVISORY SERVICE FURE.
Flooding New Orleans, Aug Flooding –Varies with intensity and amount of rainfall –Perhaps the most universally experienced natural hazard Flood.
1 Natural Resources Block Grant (NRBG) A Program that works to: – Streamline assistance and $$ to landowners – Coordinate activities of federal and state.
Wetland Monitoring What Do We Need? Integration of Wetland Monitoring and Wetland Management Wetlands and Waterways Program Maryland Dept. of the Environment.
Bassett Creek Water Management Commission Joint Advisory Group Meeting January 23, 2001.
Stormwater Retrofitting: The Art of Opportunity Prepared by the Center for Watershed Protection.
WATERSHED INVENTORY AND ASSESSMENT Module 7, part A – Issues and Description.
Western Lake Erie Basin Partnership Presented by: Name, Title Your Organization DATE YOU PRESENTED The Meeting you presented at.
Laguna Creek Watershed Council Development of the Laguna Creek Watershed Management Action Plan & It’s Relevance to the Elk Grove Drainage Master Planning.
Description of WMS Watershed Modeling System. What Model Does Integrates GIS and hydrologic models Uses digital terrain data to define watershed and sub.
1 Integrating Water Resources Engineering and Geographic Information Systems (GIS) National Weather Service NWSRFS International Workshop October 21-23,
Lake Independence Phosphorus TMDL Critique Stephanie Koerner & Zach Tauer BBE 4535 Fall 2011.
Map-Based Flood Hydrology and Hydraulics David R. Maidment Jan 10, 1998.
Opportunities for Collaboration on Water- Quality Issues in the Mississippi River Basin Herb Buxton, Office of Water Quality.
Marin County Watershed Stewardship Program Marin County Department of Public Works.
Watershed Stewardship Program Status of Marin County Public Works Watershed Program 11/7/08 11/7/08.
EPA-Great Lakes The US Environmental Protection Agency, USEPA, applies the WBD to many facets of their programs. Using Subwatershed (5th-level, 10-digit.
Rebuilding the System Reducing the Risk California Water Plan Plenary Session October 22-23, 2007.
A Traditional vs. Ecosystem Services Approach to Surface Water Management September 16, 2010 PRESENTED BY Carol Murdock, Clackamas County WES Mark Anderson,
Kettle River Watershed Management Plan Stakeholder Advisory Group Meeting #3 – July 19, 2012.
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
For EBTJV meeting October 26, 2010 Executive Order Strategy for Protecting and Restoring the Chesapeake Bay Watershed.
STORM WATER SOLUTIONS FOR EXISTING URBAN AREAS: IDENTIFYING SITES TO MAXIMIZE RESULTS Jared Bartley, Cuyahoga SWCD September 8, 2011.
Collaborative Restoration Workshop April 26, 2016 James Capurso, PhD Regional Fisheries Biologist Pacific Northwest Region USDA Forest Service.
Overview of USDA - PL-566 Small Watershed Program - EWP Program Mahoning County FRM Informational Meeting August 16, 2016 Natural Resources Conservation.
Source: Stream Corridor Restoration Manual WATERSHED MANAGEMENT.
Using RMMS to Track the Implementation of Watershed-based Plans
Souhegan River Watershed [Watershed Community Group]
Thief River Watershed Sediment Investigation
PENNSYLVANIA STORMWATER BEST MANAGEMENT PRACTICES MANUAL
Texas Water Resources Institute
Land Use and Zoning Committee Special Workshop
Mulberry Watershed Management Plan
Watershed Management Plan Citizens Advisory Committee April 18, 2011
Presentation transcript:

Red Lake Watershed District 10 Year Overall Comprehensive Plan Red Lake Watershed District & HDR Engineering, Inc. Thief River Falls, Minnesota Presentor: Corey Hanson, Water Quality Coordinator Red Lake Watershed District

Overview of the Red Lake Watershed District - Location -

Major Subwatersheds of the RLWD

5,990 Square Miles

Land Use – 41% Agriculture

RLWD Projects

Engineering Projects Impoundments and Dams Ring Dikes Ditch Inspection Ditch Cleaning Permit Inspection Stream Gauging Snow Sampling Clearing and Snagging

RLWD Projects - Water Quality - Long-Term Water Quality Monitoring –Over 30 sites –At least 4 samples per year –Lake and Stream Monitoring Special Studies –Clearwater Lake Water Quality Model, Habitat/Bioassessment, Tile Drainage Study Water Quality Improvement Projects –Erosion Control –BMP Implementation

10-Year Plan – RLWD Concerns Agricultural and Urban Flooding Water Quality Natural Resources Water Supply Economy Recreation

Elements of the Plan General Description of the District Description of Water Resources Economic Development Historic Flood Problems FDR/NRE Overall Watershed Goals and Objectives –Water quantity, quality, erosion, natural resources Implementation Plans for each subwatershed Annual Monitoring and Evaluation Program Projects

Plan Process 1.Public Involvement 2.Hydrologic Model 3.Inventory and Assessment 4.Development of Long-Term Goals 5.Describe Ways of Measuring Success 6.Develop a Financial Toolbox

Public Involvement Identify issues –Ag & urban flooding –Water quality –Natural Resources –Water Supply –Economy –Recreation Consensus

Overall Advisory Group Citizen Advisory Committee Technical Advisory Committee Broad array of stakeholders Give them power to make decisions Give credibility to the plan and justify implementation plan

Overall Advisory Group Community-based assessment of problems (restoration) and opportunities (prevention) Citizen involvement can increase chance of success Constituency of advocates Demonstrate solutions that can be applied to other communities Citizens and stakeholders foot the bill, so they should have input Use RLWD website ( to share information

Defining and Ranking Issues in Subwatersheds - Example

Hydrologic Model 14 Subwatersheds modeled using GIS and HEC-1 interface (ArcView and HEC- GeoHMS)

1. Determine Sub-watershed Boundaries and Drainage Flow Directions – Raw Data came from MN-DNR 2. Terrain is then Pre-Processed to Arcview Format using Arc-GIS software. Standard Geo-HMS Processes

3. A Digital Elevation Model of the study area is Created within Arcview 4. Flow Accumulation and Flow Direction Grids are generated next.

Standard Geo-HMS Processes 5. Based on the DEM, Flow Acc, and Flow Direction Grids, Arcview can determine the Minor Watershed Boundaries, and the streams and channels within those watersheds. 6. Stream and Sub-basin characteristics such as length, slope, mannings value, and basin centroid, are then determined within Arcview.

Standard Geo-HMS Processes 7. A sub-basin curve number, and a design Rainfall is then Applied to the watersheds. Also Tc or Time of Concentration is then calculated for each watershed. This data is then imported back into ArcView from Microsoft Excel. 8. Geo-HMS then generates a schematic, legend, and background map file for the entire study area watershed. This model is then exported from Geo-HMS to HEC- HMS. You now have a working Model.

Examples of Models Heartsville Coulee Lost River Red Lake River Lower Badger Burnham Creek Grand Marais Poplar River Hill River Clearwater River Beau Gerlot Maple Lake

StormLab

Example Calibration

Benefits We can now use the model to help determine the benefits of new projects. Ditch improvements, easements, diversions, retention, crop residue management, floodplain management, and changes in land use

Pre- and Post-Project Flood Areas Pre-Project Flooded Area Post- Project Flooded Area

Inventory and Assessment Inventory and Assessment of Water and Land Resources Related to Priority Concerns in the Watershed –GIS data layers –Information from other agencies –Natural Resources Assessment

Natural Resources Assessment Use GIS to develop base resource maps Consult NR professionals to refine maps and develop goals, objectives, strategies,and priorities for each subwatershed Present products to committees

Natural Resources Assessment Existing Resource Analysis –Large habitat blocks, quality habitats, sensitive species, public/conservation lands, wildlife concentration lands Restorable Resources –Farmed wetlands, partially drained wetlands, unstable waterways, water quality improvement areas, potential sediment yield Priority Natural Resource Areas –CRP and RIM lands, large private parcels, watershed management initiatives, infrastructure, most productive agricultural land

Natural Resources Assessment

Development of Long-Term Goals 10-yr implementation strategy Address priority concerns Tangible outcomes are keys to success of plan Workshops with committees for water quantity, water quality, erosion, and natural resources

Setting Flood Prevention/Protection Goals Vision Statement –We envision a reduction in flood damages with active cooperation and education of constituents and public partners Goals –Reduce peak flows by 10% –Reduce runoff volume contributing to peak flows by 30,000 ac-ft –Identify special projects to implement –Education –Floodplain management programs

Early, Middle, Late Concept Early –Moves ahead of major flood flows –Increase speed of removal to reduce peak flows Middle –Typically coincides with flood peak –Slow down to reduce flood peaks downstream Late –After the major flood flows –Slow down to reduce downstream peak flood flows

Early, Middle, Late Concept

Describe Ways of Measuring the Project’s Success Specify levels of flood protection –I.E. Ag protection for a 10-yr 24 hr storm Water quality improvements Habitat Improvements –Acres of buffer strips, acre-feet of water, acres of habitat

Develop A Financial Toolbox Projects benefit multiple groups – multiple sources of funds Identification of funding partners Review levy funding mechanisms

Water can be controversial Planning process should be consistent over subwatersheds, even though subwatersheds have different goals Try to return natural functions to the landscape where practical Think long-term with low-maintenance solutions Develop broad based understanding of the complicated nature of water management Recognize past solutions that worked and did not work for meeting goals Utilize existing studies and reports when setting goals Create a set of goals for each subwatershed Points to Consider ENDTHE