Inverness West Link – Traffic case stufy

Slides:



Advertisements
Similar presentations
Transport for Canberra 07 November2013. Transport for NSW: Regional Transport Plan ACT, whilst not part of the region, is an important destination Transport.
Advertisements

CityCo, Piccadilly Hoteliers Forum
Hong Kong-Zhuhai-Macau Bridge
RTS Re-fresh North East Transport Consultative Forum Tuesday 30th October 2012.
D2 Roadway Discussion Sound Transit Board September 22, 2011.
Future London Leaders Project Tracker Round Table Event 27 th January 2011.
North East Transport Consultative Forum Woodhill House, Aberdeen 2 nd October 2014.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Delivering Growth Beyond the Cities Cllr Simon Henig, Leader of Durham County Council and Chair of North East Combined Authority 19 March 2015.
Key questions What are the main issues facing Swansea’s CBD?
Planning for cycling in Horsham December Why plan for cycling? It is a relatively cheap way of providing mobility It makes efficient use of space.
Sector Model Hoyt.
AVE The Engine of Ciudad Real (Note, this is an informal translation of the information presented by Ms. Rosario Roncero Garcia-Carpintero, 9:30-10:30.
Central-Wan Chai Reclamation
Investigating Traffic in Glasgow
Mumbai and Salford – what are the potential impacts of future change? Objective: To be able to explain the potential impacts of future change in Salford.
Brighton & Hove Least car dependant city (outside of London) Cllr Ian Davey Deputy Leader & Transport Committee Chair September 2013.
Recent Developments in UK Travel and Tourism BTEC National Travel and Tourism.
STARTER ACTIVITY In pairs, discuss why you think we need more homes in the UK. Try to think of at least four reasons. Where do you think these new homes.
Conflict over a resource At a local scale. UK conflicts tend to be over building work Second runway in Manchester Newbury bypass New container Terminal.
Paul Roberts – TIF Technical Manager Presentation to the TPS – 3 June 2009.
How to answer Credit ‘Option Questions’. In your answer you must have a clear structure which uses relevant and appropriate source material to answer.
Presentation to the Executive of the Carlisle Partnership 13 July 2009.
CENTRAL ACCESS SCHEME FOR THE CITY OF KILKENNY Traffic Considerations The feed back resulting from public consultation did cause us to revisit the traffic.
High Speed Rail for Nottingham Nottingham City Council June /9/20151.
Analysis of Responses February  Number Issued: 316  Number Returned: 141  Response Rate: 44.6%
 Aims & Objectives  To reinstate a railway station at Beattock.  To increase tourism in the Beattock & Moffat area  Environmental - access to the.
Mid Wales LTP Stakeholder Workshop 3 rd October Presentation by Ann Elias and Janice Hughes.
Introduction Nablus is the largest city in the West Bank after Jerusalem. 150,000 inhabitants live in Nablus. Nablus has the largest university in the.
TRANSPORT INNOVATION FUND Stephen McFarlane Regional & Local Transport Delivery - DfT.
Phase 1 Consultation Results 23 rd September 2014.
TransLink’s role in supporting Cycling in Greater Vancouver ProWalk/ProBike 2004 Gavin Davidson, Program Manager, Bicycle Planning Greater Vancouver Transportation.
GNTP Business Forum – The Big Idea – Gary Smerdon-White 18 th September 2012.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 15, 2009.
1 What If… The Washington Region Grew Differently? February 2005 Public Meeting on Alternative Transportation and Land-Use Scenarios National Capital Region.
The Burnham Transportation Plan of Chicago: 100 Years Later CTS-IGERT Weekly Seminar April 23, 2009 Joseph DiJohn Urban Transportation Center.
1. Variety of modes (types) of transport (public and private) 2. Density of transport networks more nodes and.
Wellington Transport Package, 27 January 2005 Wellington Transport Package 27 January 2005 Hon Dr Michael Cullen Minister of Finance.
GM Future Transport Objectives – via TIF Reduce congestion on key commuter routes at peak times Transform bus, heavy rail and light rail services –More.
Single Outcome Agreements
High Speed 2 The decision and next steps. Background As per the Coalition commitment, the Government developed a proposed strategy for a high speed rail.
Prof Keith Shaw: 16/10/ Can rural and isolated areas of Northern England benefit from the increased autonomy of Scotland? Some reflections on the.
Active Travel inverness Neil Young, Transport Planning Team, The Highland Council.
West of England’s Young Placemakers’ Programme Joint Spatial Plan November 2015 With support from the staff and students at:
Submission Document went to cabinet … Planning for the Future Core Strategy and Urban Core Plan (the Plan) is a key planning document and sets out the.
+ Who will be affected by this development? (Stakeholders)
An area of significant change and identified as: Placeshaping in West Hampstead Area of Intensification in the London Plan Work completed and underway:
Gerald Jennings President Leeds Chamber of Commerce 18 th February 2016 HS2 Leeds The right place for the station in Leeds.
Nottingham Workplace Parking Levy Sue Flack Director for Planning and Transport.
Western Sydney update The Future of the Western Sydney Economy Keynote Address: The Honourable Anthony Albanese, the Minister for Transport and Infrastructure.
TRAFFIC PROBLEMS IN GLASGOW Lesson starter:  You have a piece of poster paper in front of you.  You must draw a line down the middle of it.
CBD Characteristics You will need to be able to describe and where appropriate explain the main characteristics of the CBD. Where possible always try and.
Edge of town development NAT4/5. Title: Edge of town development  12/06/2016  Aims:  To find out what type of development is going on at the edge of.
A64 (T) Hopgrove Roundabout Improvements. Background The roundabouts at Hopgrove are located to the north east of the City of York and form a junction.
Land Transport Infrastructure Integration. TfL’s purpose Meet the rising expectations of our customers and users Plan ahead to meet the challenges of.
Level 2 Construction.  To move through this power point presentation you will need to press the pictures and icons used throughout this presentation..
Our plan for new river crossings for London
a High Quality Living Environment
Presentation to NZTA /AT
Traffic Management in Glasgow
Changes in the CBD Match the description to the explanation
Fishermans Bend Draft Framework Transport Recommendations
How do councils make decisions on where to build new homes?
KEYNOTE STAGE SPONSOR.
FRLP Proposed Boundary Line Adjustment: Confluence Virginia
Hong Kong-Zhuhai-Macau Bridge
(Cover image © Expedition Engineering)
3 November 2017 Fraserburgh and Peterhead to Aberdeen Strategic Transport Study: STAG Part 1 Plus Bob Nicol: Project Director David Murtagh: Project Manager.
Woodstock Community and Infrastructure Delivery Plan
GCP Transport Update Meeting for: M11 J11 Park & Ride Engagement Group
Presentation transcript:

Inverness West Link – Traffic case stufy

The Activity The proposed west link has sparked a very heated debate about whether a new road and river crossing is needed and what the best option is. We are going to examine the arguments and write a report to explain what the arguments are and whether you think the link should go ahead or not. Use the information in the powerpoint and on the internet to look closely and the proposed road and river crossing. Use it to build up a picture of the developments and the arguments for and against it. Then put the information into a report.

All the information you need is here.. http://www.highland.gov.uk/yourenvironment/roadsandtransport/newroadschemes/icwl/welcome.htm

Inverness West Link The Inverness West Link is a new road and river crossing which will join the roundabout at the new Tesco on the Dores road with the A82 near Torvean Golf course. It is expected it will travel through much of Highland Rugby Club’ s pitches. Use this link to explore the route carefully http://www.bing.com/maps/?v=2&cp=57.486110687~-4.228333949999994&lvl=6&dir=0&sty=c&cid=206337A14C399D8D!118

This brown line shows roughly where the west link will go

New road will join these two points

Southern Distributor road New Housing A82 Recreation New Housing New developments around the river with new road in red

CBD and help with the increasing number of cars. Background to the Inverness West Link Inverness’s site has become a problem for traffic as the number of people living and working in the city as grown. Increased car use among the public combined with greater numbers of people travelling into Inverness for work and recreation has put pressure on the roads with congestion common around rush hour (8am – 9am and 4pm – 5:30pm when people are travelling to or from work). The CBD has limited road access and with increased traffic its old narrower streets become congested with traffic often leading to long queues. Added to this the main route taking cars from the A82 in the west to the A9 in the east runs right through the middle of town. This traffic adds considerably to congestion. And as Inverness has grown in population services such as supermarkets have to be built to provide for the increasing population. West Inverness has seen its population grow and developments are planned . This will put increased pressure on the existing roads through the town centre. A new west link joining the A82 with the Southern distributor road will take much traffic out of the congested CBD and help with the increasing number of cars.

Opinion on growth of Inverness Highland Council's Local Plan has programmed for delivery of a further 408 homes for Ness-side by about 2014, second to Inverness West with 1,075. Two supermarkets are being built in the ward - an Asda at Slackbuie and a Tesco on the Dores road. There are also plans to upgrade the Southern Distributor Road and also to eventually link it up with the A82 trunk road across the River Ness. Inverness Ness-side SNP councillor John Finnie said the projected growth in ward would bring both benefits and challenges. He said: "There is a real need for additional housing and I hope a significant proportion of those new houses will be for rent or shared equity."But he added: "The growth will place significant pressures on the infrastructure, and public services such as schooling.”He added: "The completion of the Southern Distributor Road will be required and I hope the views of the public will be taken on board, not least the need to retain as much of our valuable open space in as possible."Most importantly, this scheduled growth must not damage the attractive environment of Ness-side."

Support for the West link “The west link is needed to ease the flow of traffic through the city centre. The road will allow traffic to connect the A82 with the A9 main roads without travelling right through the heart of Inverness. Also traffic trying to access services in west Inverness will be able to go around the busiest parts of town, reducing congestion” Inverness Councillor

Support for the West link ‘Inverness Chamber recognises the vital importance of completing this link for the city or the region. We would view it as one of the most important works projects which the council can deliver. We recognise the opportunities for development in the West of the city the link will provide’ Letter to the council from Inverness Businesses

Support for the West link “We favour prioritising the Inverness Trunk Link Road and a tunnel crossing of the River Ness and Caledonian Canal to open access to the north and west of the Highlands in preparation for the development of alternative energy from the west coast. This route will become increasingly important as Scotland becomes an exporter of renewable energy and the technology-based industries associated with it.” From a Political Party manifesto

Support for the West link “There is also a strategic argument for this fixed link. The Kessock Bridge at Inverness spans a geological fault line and is a vital link to the northern Highlands. It is already carrying more traffic than was projected. A fixed link crossing to the west at Inverness will provide an alternative route round the Beauly Firth to the north in the event of closure of the Kessock Bridge for either planned maintenance works, upgrading, or damage in an emergency or environmental disaster.” From a Political Party manifesto

Opposition to the West Link Clare Bagley, of Island Bank Road, said if any of them went ahead it would be environmental vandalism.“Along the canal is one of the most beautiful area in the city,” she said “it is recreation ground we will never get back if they run a road and roundabouts through it," Sandy Hunter, also of Island Bank Road, agreed, saying; “It is a beautiful area of parkland. It seems it is being rushed through for reason that has not been made public.”

Opposition to the West Link ‘Most Invernessians would commend the council for developing the Bught and Whin Parks, developing the leisure centre and the running track, encouraging the rugby club and horticultural facilities. They are less enthusiastic at their proposals now to drive a main road through, or close to, these amenities. It is universally agreed that the obvious and most acceptable solution was the original proposal to extend the distributor road straight on across the river, through the quarry to the A82. This proposal would leave the attractions of Inverness as they are and retain our environment. This option has been rejected on the grounds of cost. We are further told that there is “no alternative” to the proposals.’ From a letter to the Inverness Courier 2.2.2011

Opposition to the West Link ‘No more new roads. No more new bridges and tunnels. If the public agencies have a spare £50 million to spend on transport in Inverness then they should spend it on improved public transport. Here's a few suggestions.... - Real time (electronic) bus information at ALL bus stops in Inverness and surrounding areas. - maps at all bus stops so we know where the buses are going. - Hourly train services to Aberdeen, Central Belt and North and West. - Extend the Highlander railway card so that Highlanders can get cheaper rail travel on all trains in and out of the Highlands A comprehensive network of cycle lanes’ Internet Blog Post

Opposition to the West Link ‘Another disadvantage is the incompatibility of a distributor road joining a B road (Dores/Island Bank Road) resulting in compromised safety and increased traffic volume.’ From minutes of meeting of protesters

Problems of construction Highland Council said: "A key issue for the crossing of the River Ness is the consideration that the River Ness has an extensive flood plain and Sepa will have to be satisfied that any solution does not impact on it. "Historic Scotland will also require to be satisfied that any proposals affecting the canal are in keeping with its status as a scheduled ancient monument.“ From BBC news article

Problems of construction At the west end, two options for crossing the River Ness and Caledonian Canal were developed. One involving a high level vertical opening bridge which will allow the majority of canal traffic to pass under without the need for opening. The other involved a bridge over the river and an aqueduct under the canal. Both of these designs are technically complex and were considered in detail along by the key stakeholders involved in the project. The five options for bridges are here if you want further details

Problems of construction ‘But the absence of the west link, which would include a permanent crossing over the Caledonian Canal and River Ness, from the Scottish Governments budget for transport sparked dismay among several Highland councillors and business leaders in Inverness who feel the bypass is vital for the city's future economic growth. The council will have to find the money themselves.’ From the Inverness Courier

Arguments for Arguments against Other info http://www.bbc.co.uk/news/uk-scotland-highlands-islands-11313882 http://en.wikipedia.org/wiki/Inverness_Trunk_Road_Link