Public Involvement Meeting June 11, 2014.  Introduce the project  Provide history and current status of the project  Explain the benefits of the project.

Slides:



Advertisements
Similar presentations
September 18, 2008 I-35 South Environmental Assessment North End of I-35 SH 9W Interchange Ramps North to ½ Mile North of Main Street in Norman Public.
Advertisements

March 1, Why an interchange at this location? TH 15 Corridor Study 2007 Nine Signalized intersections Six in Top 50 High Crash Cost Study outcome.
Beltline Highway ITS – Ramp Metering Project ODOT Planners Meeting April 25, 2012.
HOC-664 Hocking Hills Study Stakeholder Meeting August 15, 2008 Hocking Hills State Park.
PUBLIC MEETING May 12, 2011 P U B L I C I N V O L V E M E N T Project Status PHASE III Construction PHASE II Contract Plan Preparation & Land Acquisition.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
DDI Traffic Informational Session Town of Cornelius Lake Norman Chamber of Commerce June 11, 2014.
Public Scoping Meetings September 26, 2011 and September 29, 2011 Cajalco Road Widening and Safety Enhancement Project.
Alachua County BoCC Meeting November 8, Project Background and Location Study Purpose Study Activities Bridge Alternatives Evaluation Schedule.
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
Hansen’s Truck Stop Inc. Property in Humboldt County Charlie Fielder District Director Caltrans District 1.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
From KY 89 at the northern city limits of McKee to the recently improved section of US 421 just north of the Jackson-Rockcastle County line. Six-Year Highway.
Environmental Assessment Public Meeting
TBG MKE West Waukesha Bypass Study Community Sensitive Solutions Advisory Group Meeting No. 5 January 31, 2011 Community Sensitive Solutions.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
Ramp Metering Pilot Project May 11th, 2010 E. Jason Sims, P.E. Kansas City Scout TMC Manager.
Public Location/Design Hearings November 17, 2010 Laughlin, Nevada November 18, 2010 Bullhead City, Arizona.
Feasibility Study FOREST GLEN PASSAGEWAY April 10, Isiah Leggett Montgomery County Executive Arthur Holmes, Jr. Director Department of Transportation.
U.S. 231 Intersection Improvement in North Spencer County Heritage Hills High School Thursday, April 30, 2015.
Can Multi-Resolution Dynamic Traffic Assignment live up to the Expectation of Reliable Analysis of Incident Management Strategies Lili (Leo) Luo, P.E.,
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Illinois state line to Madison Dane and Rock County
Page Avenue What has it done for the region? A comparison of traffic volumes from Fall 2003 to Fall 2004 What has it done for the region? A comparison.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.
Southern Nevada HOV Plan Update ITE Luncheon July 17, 2014 Jeff Lerud, Project Manager.
PROJECT SCOPING FOR LOCAL AGENCY FEDERAL AID PROJECTS.
DRAFT 1 Significant Changes for the 2006 Constrained Long-Range Plan March 3, 2006.
Presenter: Dewayne Johnson, P.E. SE Region Director/Bureau of Traffic Operations Director.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
East State Street (USH 12) Hanover Street to Pine Street Juneau County November 14, 2013 Public Information Meeting.
Introduction Session 01 Matakuliah: S0753 – Teknik Jalan Raya Tahun: 2009.
Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory.
Project Update: Airport Freeway, I-820 and I-35W Townhall Meeting for State Representatives Stephanie Klick and Jonathan Stickland Monday, May 12.
I-95 Managed Lanes CORSIM Analysis Status Meeting Presented by David Stroud, PE, AICP Reynolds, Smith and Hills, Inc.
STA Safety Project PID #76439 December 12, 2006.
Fred Luna, SBCAG Paul Martinez, Caltrans District 5 April 3, 2013 SBCAG North County Subregional Committee State Route 246 Passing Lanes.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Phase I Engineering and Environmental Studies Project Development Flowchart US Route 45; IL Route 132 to IL Route 173 and Millburn Bypass CSS
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
Public Open House - July 10, 2007 WELCOME. Objective of Tonight’s Open House Provide background information on the project Introduce primary work elements.
USA Parkway Project Welcome Public Information Meeting to the
TEAM Presentation January 21, Overview Top MoDOT Priority Top MoDOT Priority A Funding challenge A Funding challenge Desperately needed Desperately.
Public Involvement Meeting December 10,  Introduce the project  Explain the benefits of the project  Discuss tasks completed since last public.
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
US 25 Corbin to London Citizens Advisory Committee Meeting December 2011.
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
Developing a Purpose & Need Statement. Objectives  Understand when the P&N is developed in the PDP  Understand the importance of a well- written/well-justified.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
Tonight’s Schedule Introduction Presentation Question and Answer Session Open House Staff at displays to answer questions Complete comment cards and/or.
I-465 at I-65 Interchange Modification Public Meeting 6 p.m., Thursday, August 14 South Grove Intermediate School, Beech Grove, IN.
Regina Bypass Project Information Session. Saskatchewan.ca Outline Background –The need for a bypass –Selecting the route –P3 delivery and procurement.
Public Scoping Open House Wabash Avenue/Porter Access Area Environmental Assessment Indiana Dunes National Lakeshore June 28, :00-8:00 p.m.
Introductions U.S. Army Corps of Engineers Metro Parks Mayor’s Office Metro Council District Representatives HDR, Inc.
EAST BATON ROUGE PARISH PECUE LANE/I-10 INTERCHANGE EAST BATON ROUGE PARISH CITY/PARISH PROJECT NO. 09-CS-US-0041 STATE PROJECT NO. H FEDERAL AID.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
FOR LOCAL AGENCY FEDERAL AID PROJECTS
Florida Transportation Commission FY 2009
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
US 75 Improvement Study Thanks for attending the Texas Department of Transportation’s first Grayson County open house for the US 75 Project from FM 1417.
FOR LOCAL AGENCY FEDERAL AID PROJECTS
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
I Street Bridge Replacement Project
State Route 55 Improvement Project from Interstate 5 to State Route 91
Presentation transcript:

Public Involvement Meeting June 11, 2014

 Introduce the project  Provide history and current status of the project  Explain the benefits of the project  Review service road alternatives  Present the upcoming project schedule  Discuss opportunities for public input 2

 WIS 29 is a primary route with large traffic volumes  The purpose of the project is to correct geometric deficiencies associated with accesses to WIS 29  The project need is to provide reasonable access to WIS 107 and to WIS 29 3 E. 13 th Ln Big Rib River E. 15 th StHighland Dr Cattail Ave 152 nd Ave Maratech Ave Weisenberger Rd Krautkramer Rd NORTH

 The WIS 107 interchange was originally constructed in 1992; with an asphalt overlay placed in  Improvements to WIS 29, east of WIS 107, were completed in  The proposed service road is an outcome of the ongoing WIS 29 freeway conversion study. 4

 During the past eight months: initial data collection.  Met with local officials from the surrounding communities.  Next, we will gather input on the alternatives, and prepare preliminary environmental documentation. 5

 Removal of access on WIS 29, near the WIS 107 interchange ramps, will help reduce an emerging safety concern. 6 1,800 feet 900 feet NORTH E. 13 th Lane Access

7 WIS 29 Service Road Existing: 80 vehicles per day Forecasted (2036): 2000 per day WIS 29 Service Road Existing: 80 vehicles per day Forecasted (2036): 2000 per day WIS 107 Existing: 2800 vehicles per day Forecasted (2036): 4100 per day WIS 107 Existing: 2800 vehicles per day Forecasted (2036): 4100 per day WIS 29 Existing: vehicles per day Forecasted (2036): per day WIS 29 Existing: vehicles per day Forecasted (2036): per day WIS 29 Existing: vehicles per day Forecasted (2036): per day WIS 29 Existing: vehicles per day Forecasted (2036): per day E. 13 th Ln Big Rib River E. 15 th St Highland Dr Cattail Ave 152 nd Ave Maratech Ave Weisenberger Rd Krautkramer Rd NORTH

8

9

 Obtain public input  Review the displays  Ask questions  Provide comments  Continue design process  Review public and agency comments  Prepare draft environmental document  Select preferred alternative  More public involvement  Second public involvement meeting - late 2014  Right of way acquisition and 2016  Construction

11 Any Questions?

Jed Peters, P.E.Brian Andreas, P.E. WisDOT Project ManagerStrand Associates, Inc