9-cell Nb cavity seminar Dec.01, 2009 Facilities for 9-cell Nb cavities.

Slides:



Advertisements
Similar presentations
T. Saeki (KEK) 15 May 2014 AWLC2014 at FNAL
Advertisements

Ss Hefei, China July 19, 2011 Nuclear, Plasma, and Radiological Engineering Center for Plasma-Material Interactions Contact: Flowing.
Stain appeared after EP acid renewal Field emission at low gradient happened on MHI-06, MHI-07, in VT. Kyoto-camera found brown stain trace in beam pipes,
Ultrasonic washer and HPR The 3nd IHEP-KEK SC collaboration meeting Ultrasonic Washer and HPR device for 9-cell 1.3GHz Cavity Zhongquan.Li, Jiyuan Zhai,
Engineer Training Inkjet Head Cleaning TJ8300 / TJ8500 Inkjet Head Cleaning.
Progress of the sub-harmonic bunching system (i.e. upgrading progress of BEPCII present bunching system) Pei Shilun for the SHBS team Accelerator center,
Progress and Plan for Superconducting RF Cavity RF Group.
Status of Nb sample study TILC09 Main Linac S0 session 18 April 2009 T. Saeki on behalf of SRF surface analysis group at KEK.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
April 6th 2009Olympus Meeting at DESY, F.Brinker1 Vacuum system Available beam scraper Beam dimensions, Target cell Machine Studies on February 7 th 2009.
Cell-Coupled Drift Tube Linac M. Pasini, CERN AB-RF LINAC4 Machine Advisory Committee 1 st meeting CERN January 29-30, 2008.
H. Hayano, KEK, New SRF Facility at Belgrade SRF-WG.
Surface study at KEK 1) sponge cleaning 2) special single-cell cavity with de-toutchable Nb-samples T. Saeki on behalf of Jlab-FNAL-KEK S0 study collaboration.
9-cell Cavity R&D Progress and Test Plan GAO Jie ( 高杰 ) ZHAI Jiyuan ( 翟纪元 ) YU Jing ( 玉静 ) LI Zhongquan ( 李中泉 ) ZHAO Tongxian ( 赵同宪 ) GU Jun ( 谷俊 ) HOU.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
Impedance and Collective Effects in BAPS Na Wang Institute of High Energy Physics USR workshop, Huairou, China, Oct. 30, 2012.
Status of crab crossing studies Presented by NAKANISHI Kota (KEK) 2008/1/25.
Blade Tuner assembly Instruction for tuner assembly on a cryomodule May
IHEP SRF Lab Upgrade & Facilities Jianping Dai on behalf of SRF lab upgrade and facilities group 2 nd Workshop of the IHEP 1.3GHz SRF R&D Project, December.
Status of cavity fabrication facility at KEK H. Hayano, KEK Cavity Industrialization Study at KEK Superconducting RF Cavity Technology and Industrialization.
STF status, April 2011 H. Hayano March 11, 2011: 14:46 Earthquake, AC power down. 16:00~18:00 visual check of STF infrastructure, no severe.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
201 MHz Cavity Fabrication Update Derun Li Lawrence Berkeley National Lab MICE CM24 at RAL, UK June 1, 2009.
SCRF Lab and IHEP Jianping Dai On behalf of the SCRF facilities team First Mini-Workshop on IHEP 1.3GHz Superconducting RF project, June 10-11,
TTC Meeting, Frascati, 5-7 December Summary of EP discussions at Oct SMTF meeting at FNAL T. Tajima (LANL), C. Boffo (FNAL)
CERN status - Nb cavity – Manufacturing 1 15/Nevember/2010, Ofelia Capatina EN/MME 1 SPL Cavity Working Group Meeting TaskExternal Company CERN Provide.
1.3GHz Input Coupler for ILC
2.1 GHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL June 15, 2015 LEReC Warm Cavity Review Meeting  June 15, 2015.
Lecture 25 - E. Wilson - 12/15/ Slide 1 Lecture 6 ACCELERATOR PHYSICS HT E. J. N. Wilson
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
MICE RF Cavity Measurements Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory July 8, 2010 Rutherford Appleton Laboratory, UK.
CRAB for HL-LHC KEK activity 2010DEC Yoshiyuki MORITA.
Superconducting rf test facility LCWS 2010 in Beijing, 28 Mar 2010, Ken Watanabe Replica-method and local grinding repair K. Watanabe (KEK) LCWS 2010 in.
10/2007 M.Taborelli, TS-MME M.Taborelli Structure fabrication: dimensional tolerances Contributions of : G.Arnau-Izquierdo, A.Cherif, D.Glaude, R.Leuxe,
(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]
Chapter 10 Rüdiger Schmidt (CERN) – Darmstadt TU , version E 2.4 Acceleration and longitudinal phase space.
RF QUALITY CONTROL AND CORRECTION DURING THE MANUFACTURING PROCESS OF THE SPL CAVITIES “DUMB-BELL TRIMMING” POA Meeting Ercan Pilicer, Kai Papke,
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
IHEP GHz 9-cell Cavity R&D Status and Plan The Third IHEP-KEK 1.3GHz SC Technology Collaboration Meeting Dec. 7-8, 2010, IHEP, Beijing GAO Jie,
ALCPG2011, 3/19- 23, SRF Group Institute of Heavy Ion Physics, Peking University ALCPG /3/19-23, Eugene, Oregon, USA RF superconducting Cavity.
Recent Results of Vertical Test for S1-Global Project at KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, H. Sakai, M. Satoh, T. Shishido, K. Umemori,
MHI#16 号機の2回目の EP2  Process log  Status of working  Monitor data during EP & Rinsing process  Comparison of EP2 Period : 2011/5/10 ~ 5/16 Process :
Standard EP recipe at KEK T. Saeki KEK Hot topics session SRF – 29 July 2011, Chicago.
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
Overview on DESY Infrastructure and up date/ grade Activities schedule status and plans Axel Matheisen DESY.
MHI#19 号機の1回目の EP2  Process log  Condition of EP2 & Rinsing process  Status of working  Monitor data during EP & Rinsing process Period : 2012/2/17~
1CEA/ Saclay/ SACM CARE/SRF/WP11 Development of a new Beam Position Monitor for FLASH, XFEL and ILC Cryomodules Claire Simon, Michel Luong, Stéphane Chel,
704 MHz cavity design based on 704MHZ_v7.stp C. Pai
Summary of STF-EP facility at KEK.
RF Dipole HOM Electromagnetic Design
Status and plans for the 3.9 GHz section of XFEL
STF Plan of gradient improvement
Power coupler at DESY & for XFEL
Vertical Electropolishing at Marui & KEK
Activities of Cavity Fabrication Facility at KEK
Fabrication of Nb and Cu SPL cavities and required tools CERN status
SPS – RFD Experience and Evolution to LHC
Effort Torwards Improving Large Scale Production for SC Cavities
Recent results of Vertical-EP at KEK-Marui
Cost reduction activities in cavity fabrication at MHI
HWR Cavities for China ADS
Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, M. Sato, T. Shishido, K
Quality control study with single-cell cavities
CEPC RF Power Sources System
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
CEPC Waveguide HOM 5-cell and 2-cell Cavity Study and EP Facility
Lecture 6 ACCELERATOR PHYSICS HT E. J. N. Wilson
 Define: The stirring heating plate or heated stirring heating plate has been developed to heat and mix fluids contained in laboratory receptacles such.
Presentation transcript:

9-cell Nb cavity seminar Dec.01, 2009 Facilities for 9-cell Nb cavities

9-cell Nb cavity seminar Dec.01, 2009 (1) A standard ultrasonic cleaner “SONO SW30H” The cleaner with inside container dimension of 505L*300W*200H is bought, its vibrator frequency is 38kHz, ultrasonic power is 300W, it is used to wash half cell, dumbbell, stiffen ring, beam tube and so on in clean room. The cleaner with inside container dimension of 505L*300W*200H is bought, its vibrator frequency is 38kHz, ultrasonic power is 300W, it is used to wash half cell, dumbbell, stiffen ring, beam tube and so on in clean room.

9-cell Nb cavity seminar Dec.01, 2009 ( 2 ) Frequency measuring device for half cell and dumbbell 1 、 Half cell 1/2pi mode calculation 2 、 Dumbbell pi mode calculation By calculation, the relation of the frequency depend on the length of iris and equator linear section can be obtained. so during edge cutting, we can determine how many length of iris and equator will be cut for each half cell and dumbbell. This require a frequency measuring device should be of several kHz frequency stability and good measurement repeatability. By calculation, the relation of the frequency depend on the length of iris and equator linear section can be obtained. so during edge cutting, we can determine how many length of iris and equator will be cut for each half cell and dumbbell. This require a frequency measuring device should be of several kHz frequency stability and good measurement repeatability.

9-cell Nb cavity seminar Dec.01, 2009 finger contact with soft rubber sealing support 1 、 Half cell 1/2pi mode measurement 2 、 Dumbbell 1/2pi and pi mode measurement A special frequency measuring device with finger contact is designed to measure the frequency. The mode’s Q value can reach more than 3000, the stability of frequency is low than 1kHz. A special frequency measuring device with finger contact is designed to measure the frequency. The mode’s Q value can reach more than 3000, the stability of frequency is low than 1kHz. ( 2 ) frequency measuring device for half cell and dumbbell (con’t)

9-cell Nb cavity seminar Dec.01, 2009 ( 3 ) Vacuum container with Teflon clamper for dumbbell and end cell transportations and CBP

9-cell Nb cavity seminar Dec.01, 2009 ( 4 ) HPR device A HPR device had been designed, now it’s just under parts fabrication. A THK type guide with 1510mm effective moving range is chosen, and a oriental motor with center hole of 20mm is adopted. The 9-cell cavity is hanged on top plate support, nozzle pipe move up and down with the speed of 0.5 to 5 minute per turn along the guide, also the nozzle rotate with the speed of 0.4 to 20 rpm. Since this device is not only used for 9- cell 1.3GHz cavity, also it can serve for BEPCII 500 MHz cavity. A HPR device had been designed, now it’s just under parts fabrication. A THK type guide with 1510mm effective moving range is chosen, and a oriental motor with center hole of 20mm is adopted. The 9-cell cavity is hanged on top plate support, nozzle pipe move up and down with the speed of 0.5 to 5 minute per turn along the guide, also the nozzle rotate with the speed of 0.4 to 20 rpm. Since this device is not only used for 9- cell 1.3GHz cavity, also it can serve for BEPCII 500 MHz cavity.

9-cell Nb cavity seminar Dec.01, 2009 ( 4 ) HPR device (con’t) Two special design for nozzle and guide water-proof structure. Two special design for nozzle and guide water-proof structure.

9-cell Nb cavity seminar Dec.01, 2009 ( 5 ) Ultrasonic cleaner A custom-designed ultrasonic rinsing tank will be fabricated to satisfy the rinsing requirements of the 9- cell 1.3 GHz and 500MHz cavity. During washing period, the cavity can move along the guide which is same as HPR used one. A custom-designed ultrasonic rinsing tank will be fabricated to satisfy the rinsing requirements of the 9- cell 1.3 GHz and 500MHz cavity. During washing period, the cavity can move along the guide which is same as HPR used one. In order to choose the ultrasonic machine parameter, I send a to Hayano-san to inquire the design parameter of STF one. Refer STF design, we choose the tank inside size is 650mm*850mm*1500mm(height), but four vibrator put in both side of tank, the effective space is reduced to about 650mm*650mm*1500mm, the heater power is 6kW, that means it need 6 hour to warm up whole tank water 20 degree higher. The vibration power is 8 kW, each vibrator is 2 kW. Oscillation frequency choose 40 kHz. In order to choose the ultrasonic machine parameter, I send a to Hayano-san to inquire the design parameter of STF one. Refer STF design, we choose the tank inside size is 650mm*850mm*1500mm(height), but four vibrator put in both side of tank, the effective space is reduced to about 650mm*650mm*1500mm, the heater power is 6kW, that means it need 6 hour to warm up whole tank water 20 degree higher. The vibration power is 8 kW, each vibrator is 2 kW. Oscillation frequency choose 40 kHz.

9-cell Nb cavity seminar Dec.01, 2009 ( 5 ) Ultrasonic rinsing device (con’t) Sender : Hitoshi Hayano Send Time : :13:37 Title : Re: Inquire the parameters of Ultrasonic Rinsing Device Dear Li Zhongquan, The answer of your question regarding ultra-sonic rinse system of STF, is as follows; The design and production company: Nomura plating co. Used component for ultra-sonic: ScanRex(r), Sansha-Denki : product: Clean Rex S-4060E (total 8 units in the tank, 4 unit in X plane and 4 units in Y plane) the detail of the specification is not in my hand (maybe somewhere in STF, I could not find so far) maybe, 40kHz, 600W is put into 300 x 300 x 100 (roughly) ultrasonic vibrator. normal operation is in max power for 8 units. Water tank : 1000 x 1000 x 2000(depth) with 5kW heater and water circulating pump. normal operating temperature is 50 degree. Cavity is put into this water tank in the center with independent UPW overflow inside of cavity. All the time cavity is hung in the tank by outside crane. Nominal operation time duration is around 1 hour. By our recent study, sulfur on the cavity surface can be removed by ethanol filled in and ultra-sonic, or by detergent filled in and ultra-sonic. So you need to think about to use these fluid for ultrasonic rinsing. I write on Dear Prof. Hayano, I'm Zhongquan Li from IHEP CHINA, Last time you visit our institute, I inquire some information about ultrasonic rinsing equipment for your 9-cell Nb cavity. Now I'm responsible for design of our ultrasonic rinsing device, we want to refer your design, can you tell me some parameter, such as frequency, power, heater power, and vessel dimensions.

9-cell Nb cavity seminar Dec.01, 2009 ( 6 ) Vertical pretuning device after taking 6 time pretuning, the field flatness had reached 97.8%. after taking 6 time pretuning, the field flatness had reached 97.8%.

9-cell Nb cavity seminar Dec.01, 2009 ( 6 ) Vertical pretuning device (con’t) 1 、 A Labview program control the step motor and network analyzer to start up synchronously, also it download and record the phase data from network analyzer after phase sweeping. 2 、 A Java program calculate the frequency error of each cell respect to target setting frequency, also it calculate the flatness for this turn measurement.