1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.

Slides:



Advertisements
Similar presentations
Summary of the discussion for the commissioning session 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 6/ 1/ 2006 T.Okugi (KEK)
Advertisements

Status of ATF/ATF2 and machine schedule in this fall Impact of the earthquake Recovery status, alignment Schedule in this fall N. Terunuma, KEK.
ATF Cooling Water System Toshiyuki OKUGI, KEK 2015/ 2/ 24 ATF2 Project Meeting LAPP (Annecy, France)
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
Simulation of IP beam size with orbit jitter + wakefield in EXT-FF ATF2 Project Meeting K.Kubo.
ATF2 Progress Report For CLIC Workshop Kiyoshi KUBO.
Analysis of ATF EXT/FF Orbit Jitter and extrapolation to IP (Data of ) ATF2 Project Meeting K. Kubo.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
Plan for the summer Nobuhiro Terunuma, KEK ATF day: ATF Collaboration Meeting European Linear Collider Workshop ECFA LC2013, May 28,
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
IPBSM status and plan ATF project meeting M.Oroku.
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman.
For Draft List of Standard Errors Beam Dynamics, Simulations Group (Summarized by Kiyoshi Kubo)
Y. Ohnishi / KEK KEKB-LER for ILC Damping Ring Study Simulation of low emittance lattice includes machine errors and optics corrections. Y. Ohnishi / KEK.
Technical Board ATF2 GM FF progress report A.Jeremie ATF2 GM System team: K.Artoos, C.Charrondière, A.Jeremie, J.Pfingstner (a lot of figures from him),
FFS Issues in the 2011 autumn continuous operation Toshiyuki OKUGI (KEK) 1/13/2011 The 11 th ATF2 project meeting SLAC, USA.
Matching recipe and tracking for the final focus T. Asaka †, J. Resta López ‡ and F. Zimmermann † CERN, Geneve / SPring-8, Japan ‡ CERN, Geneve / University.
Continuous Run in May K.Kubo. Final Focus Test Line IP; ~40 nm beam ATF Linac (1.3 GeV) ATF Damping Ring (140 m) Extraction Line Photo-cathode.
ATF2 Optics for the Commissioning Toshiyuki Okugi, KEK 2008 / 10/ 22 ATF2 commissioning meeting.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
ATF DR Overview Introduction Low emittance history Present status S.Kuroda ( KEK ) GDE Review 3rd Apr.2013.
Commissioning Status of Shintake Monitor (IP-BSM) T. Yamanaka, M. Oroku, Y. Yamaguchi, Y. Kamiya, S. Komamiya (Univ. of Tokyo), T. Okugi, N. Terunuma,
Mark Woodley, SLACATF2 Project March 20-21, Summary of Tuning, Corrections, and Commissioning.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
ATF2 Kiyoshi KUBO Accelerator Test Facility (ATF) at KEK ATF – Designed as a prototype of damping ring and injector of LC – Achieved low vertical.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
Plan in summer shutdown Magnet -SF1FF -Swap of QEA magnet - Multipole field of Final Doublet IP-BSM improvement.
Production and Installation Policy of IP-BPM ATF2 Project Meeting, 2006/12/18 Y. Honda, Y. Inoue, T. Hino, T. Nakamura.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
Analysis of Multipole and Position Tolerances for the ATF2 Final Focus Line James Jones ASTeC, Daresbury Laboratory.
1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
Initial beam size commissioning for ATF2 T.Okugi 3rd ATF2 Project Meeting, KEK 12/ 19/ 2006.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
ATF2 Report ALCW Kiyoshi KUBO, for ATF2 Collaboration.
ATF hardware status - Orbit Stabilization T.Naito(KEK) ATF2 Project meeting Laboratoire de l'Accélérateur Linéaire (LAL) 1.Orbit oscillation.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
Superconducting final doublet Support A.Jeremie. SC magnet steps Motivation: have an active stabilisation as planned in ILC and CLIC => need to evaluate.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
DRAFT: What have been done and what to do in ILC-LET beam dynamics Beam dynamics/Simulations Group Beijing.
ATF2: final doublet support Andrea JEREMIE B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With constant interaction with colleagues from KEK, SLAC.
Wakefield effect in ATF2 Kiyoshi Kubo
Technical Board Summary Preliminary Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 project meeting, Technical.
Status of ATF2 linear collider focus prototype emphasizing France-China joint contributions Philip Bambade Laboratoire de l’Accélérateur Linéaire Université.
Hardwares for commissioning 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 5/ 31/ 2006 T.Okugi (KEK)
From Beam Dynamics K. Kubo
ATF2 Status N.Terunuma, KEK
Off-axis injection lattice design studies of HEPS storage ring
Summary FD Support System
Expected hardware status and Priority of the commissioning task
Emittance Diagnostics
Tolerances & Tuning of the ATF2 Final Focus Line
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Emittance Dilution and Preservation in the ILC RTML
Proposal for a Transparent Off-Axis Injection Scheme for BESSY II
ATF2 Recent Wakefield (Beam size Intensity dependence) Studies
First Look at Nonlinear Dynamics in the Electron Collider Ring
Beam-based alignment measurements
ATF2 review R. Tomas ATF2 review web:
The new 7BA design of BAPS
XII SuperB Project Workshop LAPP, Annecy, France, March 16-19, 2010
IP configuration session
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Presentation transcript:

1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3 ) Stability of cooling water temperature 3. Lower betaY* optics Status of ATF2 Goal 1 study and beyond to 20nm Toshiyuki OKUGI, KEK 2015/ 2/ 24 ATF Technical Board & SGI meeting LAPP (Annecy, France) ( based on the Goal 1 session of ATF2 project meeting )

IP Beam Tuning Simulation

Emittances (  x /  y ) 2nm /12pm Beta Functions (  x */  y * ) 40mm / 0.100mm Momentum Spread (  p /p) 0.08% Optics to be used for IP beam size tuning simulation No SF5FF ( Present sextupole setting ) No SF5FF ( Optimized to make large bandwidth ) with SF5FF ( Optimized to make large bandwidth ) The bandwidth for present sextupole setting was very narrow. When we use SF5FF, the acceptance of horizontal IP angle makes wide for X66 correction. All magnets errors were OFF. Momentum Offset Momentum Spread IP Horizontal Angle

Procedures of IP beam tuning simulation 1. Put the following errors in Magnets as follows. QuadrupoleSextupole Quadrupole error0.001N.A. Sextpole error0.001 at R=1cm0.001 Rotation Error0.1mrad BBA offsetN.A.50um 2. Tune the beam by the following steps Carbon Wire QF1FF strength (H) QD0FF strength (V) QD0FF rotation (V) Sextupole ON AX knob (H) EX knob (H) AY knob (V) EY knob (V) Coup2 knob (V) IP-BSM 8degree AY knob (V) EY knob (V) Coup2 knob (V) IP-BSM 30degree Y24 knob (V) Y46 knob (V) AY knob (V) EY knob (V) Coup2 knob (V) IP-BSM 174 degree Y24 knob (V) Y46 knob (V) AY knob (V) EY knob (V) Coup2 knob (V) Y22 knob (V) Y26 knob (V) Y66 knob (V) Y44 knob (V) AY knob (V) EY knob (V) Coup2 knob (V) M 008 > 0.30M 030 > 0.30M 174 > times 3. Simulate the IP beam size for various momentum spread.

with SF5FF ( Optimize to large bandwidth ) No SF5FF ( Present sextupole setting ) No SF5FF ( Optimize to large bandwidth ) Results of beam tuning simulation for ATF2 10x1 optics

No SF5FF ( Present sextupole setting ) No SF5FF ( Optimize to large bandwidth ) Model calculation, when no multipole errors Momentum spread dependence for “NO” SF5FF When momentum spread was increased after IP beam tuning with small momentum spread, - momentum spread dependence are almost same for present and optimized optics without SF5FF. - momentum spread dependence was in between model calculation for present and optimized optics.

Momentum spread dependence “with” and “without” SF5FF without SF5FF with SF5FF When momentum spread was increased after IP beam tuning with small momentum spread, momentum spread dependence of the optics with SF5FF was larger than that without SF5FF. The strength change of same knob amplitude for 4 sextupole optics is smaller than that for 5 sextupole optics. This is the special case for 10x1 optics. The optics with smaller IP horizontal beta functions were different situations.

with SF5FF ( Optimize to large bandwidth ) No SF5FF ( Present sextupole setting ) No SF5FF ( Optimize to large bandwidth ) IP tuning performance of 10x1 optics for different IP-BPM monitor resolution There are no clear difference for 3 beam optics. The IP-BSM resolution is sensitive to the final IP beam size. We should use the IP beam size monitor less than 5% modulation errors.

Summary of Beam Tuning Simulation When we apply the enough number of the iteration of knob tuning, the final sextupole setting after the beam size tuning is automatically optimized for the momentum spread of the beam. Therefore, it is small impact for the initial sextupole setting. The final sextupole setting of 10x1 optics for  p/p=0.08% has small momentum bandwidth, and small IP horizontal angle acceptance. The simulation said the momentum spread after tuning with 4 sextupoles were larger than that with 5 sextupoles for 10x1 optics. We need less than 5% of modulation accuracies for IP-BSM in order to achieve optimum IP beam size. We should check the energy bandwidth of IP beam size. (Kubo-san proposed at the end of 2014) IP-BSM resolution is not only important to measure the IP beam size, but also important for IP beam size tuning.

Magnet Vibration

2015 March -prepare the drawing (LAPP) 2015 April -start fabrication (KEK) - test the horizontal fixture 2015 May - Install the new support by the test result New support structure Vibration of QF1FF presented at ATF operation meeting on 2015/10/17 by A.Jeremie

Not only QD10AFF, but also other QEA magnets were vibrated. at ATF2 project meeting at 2015/2/24 by M.Ptecki and A.Jeremie Vibration of QEA magnets Difficult to reduce with shim ?? Height adjustment Mover

Magnet vibrationIP position jitter QF1FF30 nm 1) 12.6 nm QD0FF4.8 nm 1) 7.3 nm QEA magnets18 nm 2) nm 3) 1) Presented by A.Jeremie at ATF2 meeting at 8/30/ ) Presented by A.Jeremie and M.Patecki about QD10AFF at ATF2 project meeting at 2/24/ ) All QEA magnet vibrations were assumed to be same to QD10AFF and the correlation length were assumed to be less than 1.5m. Summary of Magnet Vibration nm with shim expected to reduce

Preparation of the IP beam size measurement after 2 nd Bunch Beam Jitter Subtraction with FONT

By using the Cherenkov detector, we can measure the beam size for individual bunch. But, we cannot read the beam position for 2 bunch mode now. - No orbit correction - No orbit feedback presented by Y.Kano at ATF2 project meeting on 2015/2/24. 2 nd Bunch Beam Size Measurement

2 nd Bunch Beam Position Reading ( C-band BPM ) presented by A.Lyapin at ATF2 project meeting on 2015/2/24.

Cooling Water Stability

DR Magnet ( 1000 l/m ) DR Magnet Sub ( 400 l/m ) DR Magnet DR Vacuum DR RF DR Klystron DR RF Cavity DR Cavity EXT&FF Magnet AUX LUCX LINAC LINAC RF Cooling Facilities Loads Schematic Figures of ATF Cooling Water System Replaced to Unit System at 2014 October Cooling Tower was outside of Assembly Hall

Linac Cooling Water System June and July Operation Outside temperature was increased. The floor of Assembly hall was expanded. The frequency of RF system was changed to match the circumference of DR. The frequency of RF system was mismatched to the resonant frequencies of Linac cavity. The injection energy to DR was reduced. Before 2014, we stopped the beam, or operated with mismatched DR circumference. From 2014, the temperature of linac RF system was changed to match the appropriate frequency by Naito-san. We could operate in June (We achieved the minimum beam size.) LINAC LINAC RF

DR Cooling Water Temperature (2014/12/01 – 2014/12/21) 2 degree C / div The DR horizontal orbit was oscillated with the DR cooling water temperature. The FF vertical orbit was also oscillated with DR cooling water temperature. - Since we operated with ultra-low beta optics at December 2014, we could clearly observed the oscillation in FF beamline. - Since the frequency of FF orbit oscillation was twice as DR cooling water temperature, DR horizontal orbit oscillation was converted to FF oscillation through skew sextupole field at septum. Naito-san adjusted the feedback parameters of the cooling water.

2014 March (03/03-03/07) 2014 April (04/14-04/18) AM 0: June (06/02-06/10) AM 0:00 AM 0:00 AM 0:00 AM 0:00 Maximum IP-BSM modulation was more than 50%. Maximum IP-BSM modulation was limited around 30%. Cooling Water Temperature in 2014 Spring Operation 2 ℃ / div 17.9 ℃ 21.7 ℃ 25.1 ℃ 21.0 ℃ 14.5 ℃ Maximum temperature at Tsuchiura city 8.9 ℃ 6.3 ℃ 9.1 ℃ 9.6 ℃ 7.0 ℃ Minimum temperature at Tsuchiura city by Japan Meteorological Agency 2 ℃ / div In 2014 January to March, the temperature of DR magnet cooling water was also fluctuated. In 2014 June, the temperature of DR magnet cooling water was stable.

Lower betaY* optics

IP tuning simulation for10x0.25 optics Same beam tuning simulation was done for 10x0.25 optics. Optics was used for “No SF5FF (Matched only with QM magnets )” 10x1 optics 10x0.25 optics 10x0.25 optics sometimes cannot go to 174 degree mode (dynamic range of Y44). Tuning result of 10x0.25 optics is also sensitive to monitor resolution.

presented by M. Patecki et al., 2015 CLIC workshop The IP vertical beam size at ATF2 low beta optics is sensitive to the fringe field of final doublet. The fringe field may be corrected by using octupole magnets. But, the following simulation, I will not use fringe field of FD and octupoles. Comment for low beta optics evaluation

Installation plan will be discussed tomorrow. presented by M. Patecki et al., 2015 CLIC workshop

Thank you for your attention