Woody Rickerson ROS/WMS Update June 2013 RARF Data Completion Project.

Slides:



Advertisements
Similar presentations
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
Advertisements

Distributed Generation (DG)
Key Reliability Standard Spot Check Frank Vick Compliance Team Lead.
Rate Plan. Value Story When asked, our customers identify the following topics as ways MidAmerican Energy provides value – Emergency Response.
Talk With Texas RE Protocol Compliance Department February 21, 2013.
TIA Solid Waste Consultants, Inc.1 Presented by Miriam Zimms, Senior Consultant TIA Solid Waste Consultants, Inc. Tampa, Florida Pollution Prevention Conference.
Resource Asset Registration Form Version 5.0 / 5.1 Changes for WGRs QMWG Presentation - July 9, 2012.
ERCOT’S COMPLIANCE ASSESSMENT PROGRAM Mark Henry Compliance Manager March 23, 2005.
1 NATIONAL TECHNICAL UNIVERSITY OF ATHENS (NTUA) School of Chemical Engineering Unit of Environmental Science and Technology (UEST) Katherine Haralambous.
Macomber Map Demonstration
Texas Regional Entity Compliance Report TAC July 9, 2009.
© New York Independent System Operator, Inc. All Rights Reserved. Michael Swider Manager – Research & Development New York Independent System.
System Operations Staffing Request Presented to the ERCOT Board Of Directors By Sam Jones, COO November 16, 2004.
June 12, 2008 ROS SEM Go-Live procedure Linda Clarke.
RTWG Report to TAC August 5, 2010 Howard Daniels.
© 2001 Utility Management Consulting, Inc. All Rights Reserved Distributed Resources Interconnection Policies: A Report to EEI Members Presentation of.
Texas Regional Entity Update Sam Jones Interim CEO and President Board of Directors July 18, 2006.
Lead from the front Texas Nodal 1 Resource Entity Owned Transmission Asset Data Collection Feb 27, 2009 Kick Off Meeting.
NPRR 365 Change in Resource Outage Approvals from 8 to 45 or 90 Days Woody Rickerson Director Grid Coordination
MP Online Data Entry Project Update WMS / ROS August 2013 Troy Anderson.
Engineering a sustainable future 1 ERCOT Voltage Ride-Through Study Workshop June 26 th, 2009.
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
Public Meeting on ERCOT’s Proposed 2004 Budget September 3, 2003 Preliminary - Subject to ERCOT Board Approval.
Lead from the front Texas Nodal 1 Registration Market Call Apr 10, 2009.
Lead from the front Texas Nodal 1 External Web Services Update Nodal Implementation Team Presentation July 7, 2009.
Board of Directors Meeting February 26, 2013 Standards, Registration and Certification Report.
Lead from the front Texas Nodal 1 Registration Market Call Mar 13, 2009.
Item 5d Texas RE 2011 Budget Assumptions April 19, Texas RE Preliminary Budget Assumptions Board of Directors and Advisory Committee April 19,
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb.
Art Deller ROS/WMS Update October 2013 RARF Data Completion Project.
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
Texas Nodal March Texas Nodal NMMS Requirements By John Adams ERCOT.
NPRR425 - Creation of a WGR Group for GREDP and Base Point Deviation Evaluation and Mixing Turbine Types Within a WGR Art Deller, P.E. RARF Workshop 8/29/13.
Resource Asset Registration Form Version 5.1 Update July 12, 2012.
1 Business Integration Update to PRS January 19, 2012.
Woody Rickerson ROS/WMS Update August 2013 RARF Data Completion Project.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
Nodal ATF 1 Nodal Advisory Task Force Update for TAC September 2 nd, 2010.
CRR Issues Transparency provided by CRR Reports CRR EDS handbook Business process NPRR TPTF November 27, 2007.
Lead from the front Texas Nodal 1 Registration Market Call Mar 27, 2009.
1 Business Integration Update to PRS Troy Anderson ERCOT Enterprise Project Portfolio Management May 19, 2011.
Art Deller ROS/WMS Update November 2013 RARF Data Completion Project.
Distributed Generation Registration June 30, 2008.
GAS TURBINE COMBINED- CYCLE GENERATION POWER PLANT STABILITY MODELS AND MODEL VALIDATION Juan S. Santos Senior Consultant, System Planning.
Grid Operations Report To ERCOT Board Of Directors December 16, 2003 Sam Jones, COO.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
Resource Registration Update Dana Showalter Patrick Coon May 5, 2008.
3/28/2008 RPG CREZ Meeting CREZ Transmission Optimization (CTO) Study And The Oscar Goes To… Warren Lasher Manager, System Assessment.
Texas Nodal 1 Nodal Operations Model Posting NATF Sep 29, 2009 Matt Mereness, ERCOT.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
August 24, 2007 ERCOT Regional Planning Group Meeting CREZ Transmission Optimization Study Warren Lasher System Assessment.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Lead from the front Texas Nodal 1 MP10 / MP11 Registration Data Update Oct 14, 2008 TPTF.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
1 Single Entry Model (SEM) Go-Live Update TAC Update August 6, 2009.
ERCOT SYSTEM PLANNING Dynamic Model Data Management.
Nordic transport infrastructure market – modelling and forecasting methods for asset management and business development Markku Riihimäki, Pekka.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
PLWG Review 6.9 and the Interconnection process
Resource Registration Update
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
Oncor Electric Delivery Company LLC
Reliability Assessment Committee Reliability Workshop Priorities
GMD Data Request NERC Rules of Procedure Section 1600
Country Report of the Statistical Center of Iran for Workshop on Integrated Economic Statistics and Informal Sector for ECO Member Countries November.
Presentation transcript:

Woody Rickerson ROS/WMS Update June 2013 RARF Data Completion Project

RARF = Resource Asset Registration Form The RARF is used to collect power system modeling data, as well as Registration data, from Resource Entities for the equipment they own. The data is used in various ERCOT models such as those used for real time operations, market management, CRR, Transmission Planning, System Protection, and Dynamics. Changes to the RARF are submitted into the NOMCR modeling process by ERCOT.

3 B RIEF H ISTORY AND F UTURE OF RARF Pre-Nodal History The RARF was established in 2007 to register resource assets required for the Nodal Market. ERCOT Nodal Project collaborated with Nodal Advisory Task Force in the development of the process to collect Resource data and the RARF was approved as the collection tool. Nodal Market implementation required ERCOT to create Network Operational Model Change Requests (NOMCR) on behalf of Resource Entities. Through and after Nodal Market Implementation, Resource asset requirement changes related to approved NPRRs, ERCOT and TSP operational and planning needs drove the release of revisions to the RARF.

4 B RIEF H ISTORY AND F UTURE OF RARF RARF releases since Nodal Go-Live in November 2010: RARF RARF version at Nodal Go-Live. RARF March –Implementation of NPRR regarding Governor parameters. –Market’s need to model more details of WGRs. –Implementation of Aggregated Generation Resources. –Market entry of transmission connected Solar. –Addition of planning data requested by TSPs and ERCOT. –Separation of Form by Resource Type and format redesign. RARF June –Release of updated business rules for testing registered data to report back to Resource Entity. –Fall of 2012: Workshops and Notices regarding completion of RARF 5.1 data.

5 B RIEF H ISTORY AND F UTURE OF RARF Today : Fall of 2012: Recognition by ERCOT and Stakeholders the need for review of the complexity of planning data. RARF Data Completion Project – scheduled to be complete in November Wind Resource Form update to implement NPRR 425.

6 C URRENT S TATE OF THE RARF Starting Numbers (mid-May) There are 258 power plant RARFs providing data for ~650 individual units 125 RARFs, representing 64% of ERCOT MW capacity, are complete with no validation errors 133 are missing some data Average number of data elements missing per incomplete RARF is ~20 Total number of missing data elements is ~2700 Some of the missing data will be the same for multiple RARFs Types of Data that are missing Data needed for short circuit studies Data needed for Dynamic modeling Temperature-related operational data

7 R EASONS FOR M ISSING D ATA New Technologies – Some existing RARF parameters don’t fit new technologies (e.g. wind, solar). Owners do not know how to translate their data. Cost – Cost to test a turbine is around $25K (based on estimate provided by GE). Some owners have stated that testing costs are not justifiable for their units. This is especially true for older units. What’s wrong with what you have? Cases are still being built using old data. However, ERCOT and TSPs are concerned the data is no longer valid for the existing system. History – RARF data had been traditionally provided by the TSP portion of the old integrated utilities. When the utilities restructured, that expertise left the generating companies and the separate TSPs in some cases question the validity of some data now provided by the Gencos.

8 P ROBLEM A PPROACH Six-Month Project that began earlier this month. REs will be contacted in stages based on interconnecting TSP. At least two workshops are anticipated during the next six months. ERCOT has contracted with Siemens to propose data to populate the missing RARF fields using existing data using sources currently available to ERCOT and Siemens. REs will have final approval of proposed new data. The RARF submittal will continue to be the REs submittal. Utilizing an industry expert will aid in acceptance of data by both TSPs and REs. This approach is similar to what was used for the Voltage Ride Through (VRT) study. Formulas and processes used to obtain data will be retained and documented as a project deliverable. Existing data validation processes will keep the RARF content current once it is populated.

9 S IEMENS T EAM Nelson Bacalao, PhD, Senior Manager of Consulting, with Siemens PTI in Houston, Texas, will be the Project Manager for the study. Dr. Bacalao is an Electrical Engineer with a Master of Science degree in electrical engineering, a Master of Business Administration degree, and a Ph.D. degree in power systems. With over 30 years of professional experience, Dr. Bacalao has extensive worldwide experience in evaluating the performance and planning of transmission systems in both in developed and developing Corporate Background and Experience Siemens Industry, Inc. – Siemens Power Technologies International P – Resource Asset Registration F 3-8 orm (RARF) Services Copyright © 2012 Siemens Industry, Inc. All Rights Reserved. countries. His experience is centered in system studies and economic evaluation, including recently advising TSPs in the evaluation of the CREZ transmission expansion plan in Texas as well as in the evaluation of several interconnections of large wind farms to the ERCOT 345 kV system. John Hanson, PE, Principal Consultant, with Siemens PTI in Houston, Texas. Mr. Hanson is a licensed Professional Engineer (PE) in Texas with 40 years of experience in the power systems industry. His experience covers a wide range of topics including power plant engineering instrumentation and control, transmission planning, system protection, EMTP studies, power flow analysis, short circuit analysis, dynamic stability analysis, voltage stability analysis, and geomagnetic induced current analysis. Mr. Hanson joined Siemens PTI in Alicia Dortch, Senior Consultant with Siemens PTI in Houston, Texas, has a solid foundation in electric system operations and transmission system planning. Her 8 years of professional experience covers an extensive range of topics including transmission planning, power flow analysis, dynamic stability analysis, and voltage stability analysis. She has performed numerous power system analyses and simulation studies for system expansions and new system interconnections. She complements her technical skills with experience in NERC and FERC compliance and audit preparedness. Jack Henry, PE, Senior Staff Consultant, with Siemens PTI in Houston, Texas. Mr. Henry is a licensed Professional Engineer (PE) in Texas with more than 30 years of extensive power systems industry experience in the transmission and generation sectors. He has a solid power system background in transmission planning and distribution, including power flow analysis, post-transient analysis, voltage stability analysis and dynamic stability analysis. His expertise also includes modeling and simulation of transmission projects for long-term development plans, real-time generation operations with respect to the integrated transmission system, and day/month-ahead transmission and generator strategic operations planning integrating real-time and planned transmission maintenance information. Mr. Henry joined Siemens PTI in 2010 and has been conducting power system studies, power system modeling, and generator interconnection assessments, providing engineering solutions for the power industry.

10 M ONTHLY P ROGRESS R EPORTS June Upate Resource Entities with Complete RARF Capacity Percentage Represented with Complete RARF Percentage of RARF Data Missing