Energy Audit & Efficiency Improvement of Operating Power Plants

Slides:



Advertisements
Similar presentations
Welcome.
Advertisements

BOILER EFFICIENCY Heat Input is Pulverised Coal
Lecture Notes - Energy Conservation Topic “Boiler”
Different methods of energy conservation
Energy Efficiencies Opportunities for SMEs … An effective tool to sustain bottom line Tuesday, April 2, 2013.
Combustion Calculations
1 ENERGY EFFICIENCY IMPROVEMENT IN THE POWER SECTOR Presentationby BHEL - Corporate Engineering & Product Development 5 June 2008.
Energy Efficiency and Intelligent Power Plants Rameshbabu R S 10 th May, 2006 The Center For Bits And Atoms MIT.
Thermal Power Station Plant. Introduction 150 MW Thermal power station plant, produce 450t/hr steam at full load The max steam pressure is 150 bar with.
Thermal Power Station Perform Achieve Trade. Thermal Power Plants in PAT - I  Total No of DCs = 144  Threshold limit to be DC = 30,000 tons of oil equivalent.
Generation and Control of Vacuum in Furnace
Power Plant Construction and QA/QC Section 2.4– Boiler Auxiliaries
Steam Generation Efficiency
Chapter 1 VAPOR AND COMBINED POWER CYCLES
ENERGY CONVERSION ES 832a Eric Savory Lecture 11 – A small-scale power plant worked example Department of Mechanical.
DETAILS OF CALCULATIONS:
Advanced Biomass-based Combined Heat and Power System Combined Heat & Power in the Pacific Northwest October 15, 2002 Nathan E. Carpenter Manager, Energy.
“Energy Efficiency Guide for Industry in Asia”
POWER GENERATION TECHNOLOGIES
Cogeneration.
Boiler efficiency Heat Engines & Boilers.
Large Steam& Gas Turbines P M V Subbarao Professor Mechanical Engineering Department Backbones of Modern Nations ……
Pharos University جامعه فاروس Faculty of Engineering كلية الهندسة Petrochemical Department قسم البتروكيماويات PE 330 ENERGY CONSERVATION LECTURE (5) Flue.
Steam Power Station Presented By Ashvin G. Patel Asst. Prof. (E.E.)
1 JSW Energy Limited of 149 RWPL MOPR – JULY - 14.
Performance Evaluation of A Steam Generator P M V Subbarao Professor Mechanical Engineering Department A Measure of Efficient Combustion …..
Selection of Optimal Air Fuel Ratio P M V Subbarao Professor Mechanical Engineering Department Efficient Combustion Requires Sufficient Air…..
Operation and Maintenance
Vapor and Combined Power Cycles (2)
Prof. D.N. Reddy Director Centre for Energy Technology University College of Engineering Osmania University.
TECHNOLOGIES FOR SUSTAINABLE DEVELOPMENT Dr. V. K. Sethi, Research Adviser CENTRE FOR ENERGY TECHNOLOGY UNIVERSITY COLLEGE OF ENGINEERING OSMANIA UNIVERSITY.
ENERGY PERFORMANCE ASSESSMENT OF BOILERS
Plant Utility System (TKK-2210) 14/15 Semester 4 Instructor: Rama Oktavian Office Hr.: M-F
GAS TURBINE POWER PLANT
Generating Stations. Bulk electric power is produced by special plants known as generating stations or power plants. Depending upon the form of energy.
Welcome PRESENTATION BY ASHISH MISHRA.
STEAM POWER PLANTS.
ENERGY EFFICIENCY IN THERMAL UTILITIES AND SYSTEM
Perform Achieve And Trade (PAT) Mechanism
Page 1 Petten 27 – Feb ALFRED and ELFR Secondary System and Plant Layout.
A Seminar On Suratgarh Super Thermal Power Station (Raj.)
A Presentation On Summer Training At SURATGARH SUPER THERMAL POWER STATION (6×250MW)
Development of Simplified Model for Furnace Cooling Capacity P M V Subbarao Professor Mechanical Engineering Department Empirical Testing for Cooling.
Thermal Power Station.
THERMAL POWER PLANT.
Training Presentation On Suratgarh Super Thermal Power Station (Raj)
FURNACE HEAT BALANCE CALCULATIONS A heat balance of a furnace is a means of determining the thermal efficiency of the process and comparing the relative.
Presentation on Steam Power Plants R.C.Chaturvedi
Effect of Furnace Heat Transfer on Maximum Cycle Pressure Understanding of Fuel to Cycle Connections….. P M V Subbarao Professor Mechanical Engineering.
CERTIFICATE This is to certify that the project work entitled “Different Power Plants“ Is being submitted by Name of the student : Enroll no.: Patel Akshaykumar.
Prof. D.N. Reddy Director Centre for Energy Technology and Principal University College of Engineering Osmania University Hyderabad – 7. THEME PAPER ON.
S.K.Thapa General Manager BHEL, Kolkata EFFICIENT CYCLE IN POWER GENERATION AN INDIAN PERSPECTIVE.
A Presentation on THERMAL POWER PLANT Sunil Kumar M.E. (5TH)
ENERGY EFFICIENCY AN ENERGY EFFICIENCY EVALUATION OF A BAGASSE GASIFICATION SYSTEM FOR THE SOUTH AFRICAN SUGAR INDUSTRY.
Electricity Generation: Coal v/s N-Gas - Basic Economics
BRAYTON CYCLE AND EFFECT OF INTERCOOLING , REHEAT AND REGENRATION
Thermodynamics Cycles.
Electricity Generation: coal v/s n-gas - Basic Economics
A biomass based 5 MW power plant operates on fuel wood
Managing Director (Bajaj Power Ventures Ltd)
THERMAL POWER PLANT.
TO PRESENTATION ON SUPERCRITICAL BOILER
Furnace Heat Transfer & Steam Generation
BOILER EFFICIENCY Heat Input is Pulverised Coal
THERMAL POWER PLANT.
THERMAL POWER PLANT.
THERMAL POWER PLANT.
Generation of Eco-friendly Steam in Power Plants
WATER AND STEAM SYSTEM.
Presentation transcript:

Energy Audit & Efficiency Improvement of Operating Power Plants 28 July 2015 Dr. Y. P. Abbi Senior Advisor/Energo Engineering Projects Limited, Ex- Executive Director/BHEL, Senior Fellow/TERI, President/Energo

Energy Efficiency Improvement of Thermal Power Plants It is responsibility of Operation & Maintenance Engineers/Managers of the plant It involves systematic data collection & analysis (weekly/fortnigtly); and not once a year by an External Energy Auditor Understand the science/technology for each equipment sub-system of the plant; and keep yourself abreast with their latest technology development Planned improvements in stages; don’t wait for R&M Retire old plants with Heat Rate deviation more than 20 %

Energy Efficiency Improvement – A Necessity Power demand (as on date) is low (PLF); thus need for efficiency improvement for financial sustainability Energy efficiency improvement leads to fuel cost saving and thus plant profitability It leads to CO2 emission reduction (a national & international commitment)

Change Mindset for Energy Efficiency Improvement Don’t make excuse that coal quality has become bad We have to work with the available fuel, and achieve the best possible results Blame no more the design defects; it is we who have to overcome/remove these Don’t be defensive while analyzing results, or receiving suggestions from external Energy Auditors Make PG Test results as the baseline; and make all efforts to achieve & maintain these Important that all key instruments used in the plant are calibrated regularly and at least conform to prescribe accuracy

Required Accuracy of Instruments Thermocouples Temp. Range: 0 to 277 0C – 1.1 0C; 277 to 1260 0C – 3/8 % Pressure Transducers 0.1 Power Meter Data Logger 0.03 Power Transducer 0.5 Flue Gas Analyzer Ultrasonic Flow Meter Anemometer 1.0 Infrared Thermometer Lux Meter RH Meter Calibrated Test Flow Assembly 0.25

LET US CONSIDER THE PATTERN OF ENERGY CONSUMPTION & LOSSES IN A THERMAL POWER STATION

Typical Energy Losses in a Power Plant

Typical Energy Losses in a Boiler

Typical Energy Losses in Steam Cycle

“You cannot Manage what you cannot Measure” (Accurately) - Jack Welch, CEO, General Electric

What needs to be measured for Efficiency Improvement of a Power Plant ? Heat rate of the plant Heat rate of the steam turbine cycle & Boiler Efficiency Auxiliary Power Consumption Net heat rate of the power plant (Monitored by CEA & BEE under PAT scheme)

Heat Rate of Steam cycle and the Power Plant Heat Rate of steam cycle, HRsc = {(Enthalpy of SH steam) +(Heat added during RH) – (Sensible heat in feed water)} / (kW electricity generated), kCal/kWh Efficiency of steam cycle, ƞsc = 860 /HRsc Gross Heat Rate of the Power Plant, HRpp = HRsc / ƞBOILER , kCal / kWh Gross Calorific value of Fuel = GCV kCal /kg of fuel Specific fuel consumption = HRpp / GCV, kg/kWh Net Heat rate of the Power Plant = HRpp / (1 – APC in fraction)

Perform Achieve & Trade (PAT) scheme under Energy Conservation Act 2001 Applicable for all Designated Consumers (DCs) Thermal Power Plants are also DCs Every DC is given a target for reduction in energy consumption by end of three years For power plants, the target will be in terms of reduction of Net Heat Rate of the Plant Power plants who don’t achieve the target will have to buy Energy Certificates from those who have achieved more than their targets

Benefits from Heat Rate Improvement Take the case of a typical 210 MW power plant and assume that it has the following operating variables: Heat rate = 2450 kCal/kWh Plant load factor = 85 % Coal GCV = 3997 kCal/kg (C = 41.7 %) Coal cost = INR 2000 /t CO2 emission per t of coal burnt = (41.07/100) x (44/12) = 1.5059 t The coal consumed and its cost, and CO2 emissions per year are as follows: Specific coal consumption = 2450/3997 =0.613 t/MWh Electricity produced = 210 x 0.85 x 365 x 24 = 1,563,660 MWh Contd.1

Contd. 1 Coal consumed = 1,563,660 x 0.613 = 958,524 t Coal cost = INR 958,524 x 2,000 = INR 1,917,048,000 CO2 emissions = 958,524 x 1.5059 = 1,443,441 t If the energy audit and modifications in O&M practices yields an improvement of heat rate by just 50 kCal/kWh, the fuel and fuel cost saved per year would be as follows: Heat rate (improved to) = 2400 kCal/kWh Specific coal consumption = 2400/3997 = 0.60045 t/MWh Contd. 2

Contd. 2 Coal consumed for generating 1,563,660 MWh of electricity = 1,563,660 x 0.60045 = 938,900 tonne Coal cost = 938,900 x 2000 = 1,877,800,000 INR CO2 emissions = 938,900 x1.5059 = 1,413,890 t Thus, coal cost saved in one year = INR (1,917,048,000 – 1,877,800,000) = INR 39,248,000 CO2 emissions saved in one year = 1,443,441 - 1,413,890 = 29,551 t

Objectives of an Energy Audit or Performance Monitoring To improve Heat Rate and reduce Auxiliary Power Consumption of the power plant To identify energy efficiency improvement measures To develop medium-term and long-term energy conservation measures, & work out techno-economics

Evaluation of efficiency of Boilers Standards – ASME PTC 4 or BS 2885 or IS 8753 Applicable for boilers fired with oil, gas, solid fuels Two Methods used – a) Direct Method, & b) Indirect Method Applicable for different firing systems –Stoker, pf, FBC Applicable for subcritical and supercritical boilers

Direct Method Boiler efficiency = (Heat output/Heat input) × 100 = {Steam flow rate × (steam enthalpy – feed water enthalpy) × 100}/ (Fuel firing rate × gross calorific value) *Fuel as fired basis only

Calculation of Boiler Efficiency (ASME PTC 4) Heat losses in the boiler (%) Dry flue gas losses (sensible heat + un-burnt CO) Loss due to hydrogen and moisture in the flue gases Loss due to moisture in air Un-burnt carbon losses (fly ash and bottom ash) Loss due to sensible heat in fly ash and bottom ash Radiation & convection losses from boiler surface Total losses = Sum of all above Boiler Efficiency ŋBOILER = 100 – Total losses

Data required for boiler efficiency calculations Ultimate analysis of fuel (C, H, O, N, S, H2O, ash) GCV of fuel, kCal/kg O2 in flue gas (% by vol.) CO in flue gas (% by vol.) Tg, Flue gas temperature, oC Ambient air temp., humidity in air Combustibles (un-burnt) in fly ash & bottom ash Measurement of temp., press., flow should be done at multiple points in the duct

Recommended excess air levels Fuel/Type of boiler Excess air (%) Coal PC FBC Stoker Fuel oil Bagasse Wood Blast furnace gas 15-20 20-25 25-35 03-15 15-30

Cold air leakage in an air heater

Cold air leakage in Air Heaters As per ASME PTC 4.1 wAL, % leakage = {(% O2 in gas leaving the heater - % O2 in gas entering the heater)/ (21 - % O2 in gas leaving the heater)}x 90

Corrected flue gas temperature leaving the air heater for no leakage tGONL = {% leakage x CpA x (tGO – tAI)/ (100 x CpG)} + tGO where CpA = Mean specific heat between temperature tAI and tGO CpG = Mean specific heat between temperature tGO and tGONL

Case study of Energy Audit of a 500 MW Boiler

Case study: Boiler efficiency evaluation for a 500 MW unit (Steam parameters- 1700 t/h, 179 ata,540oC/540oC) Coal properties Design Actual C (Wt %) 37.92 44.73 H 02.33 01.99 S 00.29 00.37 N 00.84 00.62 O 06.23 01.83 H2O 12.00 14.10 Ash 40.39 36.22 GCV (kCal/kg) 3500 3622

Measured data for energy audit Boiler O2 in flue gas (%) 4.01 Excess air (%) 23.06 CO (ppm) 9.3 Flue gas temp. (OC) 167.57 Ambient temp. (OC) 23.9 Wet bulb temp. (OC) 18.1 Air heater O2 (%) in flue gas after eco. 4.01 O2 (%) in flue gas after air heater 7.50

Calculation of boiler efficiency Parameter (%) Design Calculated Dry flue gas loss 5.08 8.89 Heat loss due to CO 0.00 0.00 Heat loss due to moisture in air 0.12 0.12 Heat loss due to moisture and Hydrogen in fuel 5.95 5.78 Heat loss due to unburnt in bottom ash 0.90 0.07 Heat loss due to unburnt in fly ash 0.00 0.02 Sensible heat in bottom ash 0.38 0.26 Sensible heat in fly ash 0.18 0.33 Surface & unaccounted loss 0.67 0.10 Total heat losses 12.57 15.65 Boiler efficiency 87.43 84.35

Analysis of boiler efficiency test results Flue gas losses are higher than design Excess air level is 23.6 % (recommended value is 20 %) Flue gas temperature (OC) Measured 167.57 Corrected after applying leakage correction 190.0 Design value 146.0

Expected improvement in boiler efficiency From To Flue gas temp. (OC) 190 146 Excess air (%) 23.6 20.0 Boiler efficiency (%) 84.35 87.18* * This would be very close to the design value of 87.43%.

Coal and monetary savings potential through efficiency improvement Current coal consumption (t/y) 2,632,181 Saving potential through efficiency improvement (t/y) 74,490 Coal cost (INR/t) 2,000 Monetary savings (INR/y) 148,980,000

Energy Audit of Steam Turbines

Energy audit of steam turbines (Data required) Steam flow, temperature and pressure conditions at the entry to the HP turbine Cold reheat steam temperature and pressure Temperature and pressure of hot reheat steam at the inlet of IP turbine Temperature and pressure of IP exhaust steam LPT exhaust pressure Extraction temperature and pressure of steam of all the extractions (6 in case of 500 MW and 5 in case of 210 MW) Super heater and reheater spray conditions (quantity, pressure and temperature) Feed water condition at the economiser inlet (quantity, pressure and temperature) Make up water quantity Coal consumption and power generation

Analysis of steam turbine data TG heat rate (HR) = (Heat input to turbine)/Power generated Heat input to turbine = {Heat in main steam + Heat picked up in reheat + Heat in make-up water + Heat picked up in super heater (SH) spray + Heat in reheater (RH) spray – Heat in feed water} Heat picked up in reheat = {HRH flow x (Enthalpy of HRH Steam – Enthalpy of CRH steam)} Heat picked up in SH spray = {SH spray quantity x (Enthalpy of SH spray – Enthalpy of feed water at economiser inlet)} HRH flow = CRH flow = {MS flow – Extraction-6 quantity – Gland steam leakages}  Assumed as 1.5% of the MS flow to turbine Extraction-6 quantity = { FW flow through HPH-6 (enthalpy in – enthalpy out)} / (enthalpy of steam in – enthalpy of steam out)  

Analysis of steam turbine data (Contd.)  TG efficiency = 860/TGHR Plant heat rate = (TGHR/Boiler efficiency)x100 Steam rate (SR) in kgs/kWh is steam input to the turbine (kgs) to actual power output from the turbine (kWh) Specific coal consumption (SCC) in kgs/kWh is overall plant heat rate (kCal/kWh) to the GCV of coal (kCal/kg) on as-fired basis. Cylinder efficiency (HP/IP)= (actual enthalpy drop / isentropic enthalpy drop)x 100 =(steam inlet enthalpy – steam outlet enthalpy)/(steam inlet enthalpy – Isentropic enthalpy)x 100

Audited performance parameters of a 500 MW steam turbine Flow (t/h) Pressure (bar) Temperature (OC) Enthalpy (kCal/kg) Isentropic enthalpy Main steam 1575.97 169.17 535.08 809.11 - CRH-HPT exhaust 1450.00 46.47 343.49 731.05 721.71 HRH-IPT inlet 42.47 530.09 838.87 IPT exhaust 6.727 268.39 715.03 707.72 LPT exhaust 0.096 531.02

Audited performance parameters of a 500 MW steam turbine (contd.) Flow (t/h) Pressure (bar) Temperature (OC) Enthalpy (kCal/kg) Isentropic enthalpy FW at eco inlet 1580.90 210.02 249.54 259.05 - SH spray 35.17 195.31 314.50 337.81 RH spray 2.49 115.56 183.94 187.65 Make-up water 9.74 25.00 25.04

Audited performance parameters of a 500 MW steam turbine (contd.) Coal consumption 286.66 t/h* Power generation 504.95 MW * Unit control board value

Analysis of performance of steam turbine Parameter Design@0% makeup water Design @3% makeup water PG test value Audited Performance TGHR, kCal/kWh 1988.10 2023.6 1994.38 2030.74 TG efficiency, % 43.26 42.50 43.12 42.35 Boiler efficiency, % 87.43 88.90 84.35 Plant HR, kCal/kWh 2273.93 2314.54 2243.48 2407.51

Analysis of performance of steam turbine (Contd.) Parameter Design@0% makeup water Design @3% makeup water PG test value Audited Performance Overall plant efficiency, % 37.82 37.16 38.33 35.72 Steam rate, kg/kWh - 3.12 GCV of coal, kCal/kg 3500 3622 Specific coal consumption, kg/kWh 0.650 0.661 0.665 Specific coal consumption, kg/kWh-UCB value 0.568

Cylinder efficiency of three turbines Parameter PG Test Audit HPT efficiency (%) 87.24 89.32 IPT efficiency (%) 91.36 94.42 LPT efficiency (%) 56.33 52.29 Overall efficiency (%) 43.12 42.36

Inference & Recommendations SH spray is 2.39%, which is higher than prescribed limit Turbine heat rate of 2030.74 (at 0.63% makeup water)is higher than the design value of 1988.10 Coal consumption as calculated is higher than UCB value. Thus, Gravimetric Feeder needs re-calibration

Inference & Recommendations (Contd. 1) HPT & IPT efficiencies are better than the PG test level. This leads to lesser enthalpy drop in LP cylinder, and thus LP cylinder efficiency is lower. SH spray causes less feed water flow through the water walls (once-thru boiler) and thus affects its performance. RH spray causes less bleed steam flow to the FW heaters and thus loss of efficiency. RH spray also lowers the cycle efficiency as the steam formed by spray water in reheater bypasses the HP cylinder, and thus affects the efficiency.

Inference & Recommendations (Contd. 2) Overall performance of turbine can be improved by reducing the SH and RH sprays by suitably tilting downwards the burners. Maintain recommended condensate levels in FW heaters. With this no heat transfer areas are immersed in the drain condensate. Overall plant efficiency is a function of efficiencies of both boiler and steam turbine. In this case, the improving boiler efficiency can make a major contribution.

Plant Auxiliaries

Performance Data of JSW Energy Plants (compiled by Centre for Science and Enviroment)

JSW Energy Ltd., Ratnagiri 4 x 300 MW; Sub-critical; Imported coal –based; sea water cooling; Supplied by Shanghai Electric Co.; Commissioned in 2010 (units # 1,2) & 2011 (units # 3,4) Sp. Coal consumption = 0.49 kg/kWh Sp. CO2 emission = 1.03 t CO2/MWh Plant availability (2011-12) = 89 % PLF = 71.8 % APC = 8.53 % GHR = 2418 kCal/kWh (12.4 % higher than design) NHR =2673 kCal/kWh Not included in PAT scheme

JSW Energy Ltd., Thoranagullu SBU I: 2 x 130 MW with Corax Gas & Imported Coal (BHEL) + SBU II: 2 x 300 MW with Imported Coal (Shanghai Electric)= 860 MW During 2010-11, 11-12, 12-13 Availability = 91 % PLF = 96 % GHR = 2261 kCal/kWh GHR (design) = 2162 kCal/kWh APC = 7.46 % CO2 emission = 0.93 t CO2/MWh

Continued Avg. Steam Cycle HR = 1978 kCal/kWh Design Steam Cycle HR = 1930 kCal/kWh Boiler efficiency = 88.3 % Design boiler efficiency = 89.3 % CWP efficiency SBU I 68% (Low) SBU II 87.67 % PAT Targets (NHR) SBU I: 2515 to 2503 kCal/kWh SBU II: 2422 to 2420 kCal/kWh

Rajasthan West Power Plant, Barmer 2 x 120 MW, High Sulphur Lignite fired, CFBC boilers PAT Targets (NHR) 3723 to 3559 kCal/kWh

Thank you ypa4@yahoo. co. in abbi. yashpal@energoindia Thank you ypa4@yahoo.co.in abbi.yashpal@energoindia.com Books Authored Y P Abbi & Shashank Jain “Handbook on Energy Audit and Environment Management”, published by TERI Press, 2006 Y P Abbi “Energy Audit of Thermal Power, Combined Cycle, and cogeneration Plants”, published by TERI Press, 2012 http://bookstore.teriin.org