PAC-35 responses: M&P and Liquid Metals MA Jaworski 7/24/14.

Slides:



Advertisements
Similar presentations
The PPPL Perspective on Ten Year Planning S. Prager Princeton Plasma Physics Laboratory.
Advertisements

Program Evaluation It’s Not Just for OMB Anymore….
Physics of fusion power
Page 1 of 14 Reflections on the energy mission and goals of a fusion test reactor ARIES Design Brainstorming Workshop April 2005 M. S. Tillack.
1 Introduction to System Engineering G. Nacouzi ME 155B.
Lecture Nine Database Planning, Design, and Administration
077-05/rs Liquid Metal Discussion Session  Summarized special conference call for liquid surfaces – written summary and presentations online.
Session 7 Page 11 ECE361 Engineering Practice Brainstorming, Trades, Evaluation, and Conceptual Capture.
Database System Development Lifecycle © Pearson Education Limited 1995, 2005.
Advanced Tokamak Plasmas and the Fusion Ignition Research Experiment Charles Kessel Princeton Plasma Physics Laboratory Spring APS, Philadelphia, 4/5/2003.
ASIPP EAST Overview Of The EAST In Vessel Components Upgraded Presented by Damao Yao.
Design Science Method By Temtim Assefa.
Usability Issues Documentation J. Apostolakis for Geant4 16 January 2009.
V. A. Soukhanovskii NSTX Team XP Review 31 January 2006 Princeton, NJ Supported by Office of Science Divertor heat flux reduction and detachment in lower.
AES, ANL, Boeing, Columbia U., CTD, GA, GIT, LLNL, INEEL, MIT, ORNL, PPPL, SNL, SRS, UCLA, UCSD, UIIC, UWisc FIRE Collaboration FIRE.
Hutch Neilson Princeton Plasma Physics Laboratory Stellarator Team Meeting 3 March 2011 Stellarator Program Update.
Phase II WIP Background & Development Process Tri-County Council – Eastern Shore June 2,
H. W. Kugel 45 th APS DPP Meeting Oct 27-31, 2003, Albuquerque, NM 1 Lithium Experiments in the NSTX Boundary Physics Program H.W.Kugel, M.Bell, R.Kaita,
Thoughts on Fusion Competitiveness Initiative Farrokh Najmabadi, George Tynan UC San Diego University Fusion Initiatives Meeting, MIT 14-15, February 2008.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
M.E. Fenstermacher - 2nd Inter-Mtg Conf Call, PEP ITPA WG on RMP ELM Control 8/31/09 18:05 1 PEP ITPA Working Group on RMP ELM Control: 2 nd Inter-Meeting.
U.S. Department of Energy’s Office of Science 20 th Meeting of the IEA Large Tokamak ExCo, May th Meeting of the IEA Poloidal Divertor ExCo, May.
1ITPA meeting IOS, Oct 2011Arne Kallenbach IOS-1.2 Study seeding effects on ITER demo discharges (Oct 2011) - closely related to IOS-1.1, development of.
NSTX-U cryo/particle control discussion #8 December 19, 2012 What have we done, or plan to do to be responsive to PAC questions, and in prep for 5 year.
Programmatic issues to be studied in advance for the DEMO planning Date: February 2013 Place:Uji-campus, Kyoto Univ. Shinzaburo MATSUDA Kyoto Univ.
Compact Stellarator Approach to DEMO J.F. Lyon for the US stellarator community FESAC Subcommittee Aug. 7, 2007.
Critical Design Review (CDR)
M&P TSG Prioritization for FY2015 and campaign startup M.A. Jaworski, C.H. Skinner, R. Kaita NSTX-U Science and Topical Science Group organizational meeting.
B WEYSSOW 2009 Coordinated research activities under European Fusion Development Agreement (addressing fuelling) Boris Weyssow EFDA-CSU Garching ITPA 2009.
FIRE Engineering John A. Schmidt NSO PAC Meeting February 27, 2003.
Future Direction of the U.S. Fusion Materials Program Dr. Pete Pappano US Department of Energy Fusion Energy Sciences Fusion Power Associates Annual Meeting.
Striving for Excellence on NSTX Run Assessment Meeting R. J. Hawryluk July 28, 2006.
Steady State Discharge Modeling for KSTAR C. Kessel Princeton Plasma Physics Laboratory US-Korea Workshop - KSTAR Collaborations, 5/19-20/2004.
Assessment of Fusion Development Path: Initial Results of the ARIES “Pathways” Program Farrokh Najmabadi UC San Diego ANS 18 th Topical Meeting on the.
Approach for a High Performance Fusion Power Source Pathway Dale Meade Fusion Innovation Research and Energy ARIES Team Meeting March 3-4, 2008 UCSD, San.
Comments on Fusion Development Strategy for the US S. Prager Princeton Plasma Physics Laboratory FPA Symposium.
Session 3.2: Material – PMI and High Heat Flux Testing R. Neu: Recent PMI Experience in Tokamaks R. Doerner: PMI Issues beyond ITER M. Roedig: High Heat.
New Product Development Page 1 Teddy Concurrent Engineering by Teddy Sjafrizal.
1NSTX-U Roles and Responsibilities J. Menard NSTX-U Roles and Responsibilities PPPL December 4, 2015.
Solenoid Free Plasma Start-up Mid-Run Summary (FY 2008) R. Raman and D. Mueller Univ. of Wash. / PPPL 16 April 2008, PPPL 1 Supported by Office of Science.
NSTX-U Run Planning Guidance for 2015 NSTX-U Research Forum 1 FY2015 (and 2016) research milestones will guide prioritization of eXperimental Proposal.
1NSTX-U PAC-37 Q&A – Day 2 NSTX-U Team Questions and Answers from PAC-37 Day 2 NSTX-U PAC-37 PPPL January 27, 2016.
Engineering Operations Outage Status: Tile cleaning is complete Tentatively planning on 2 LITER operation. Design Review upcoming Shielding of HHFW/in-vessel.
Page 1 Alberto Loarte- NSTX Research Forum st - 3 rd December 2009  ELM control by RMP is foreseen in ITER to suppress or reduce size of ELM energy.
NSTX NSTX Team Meeting –Masa Ono August 14, 2015 Masa Ono February 5, 2016 NSTX-U Team Meeting.
NSTX-U NSTX-U PAC-31 – NSTX-U Program Overview, J. Menard (04/17/2012) NSTX-U 5 year plan goal: implement cryo-pumping and begin transition to metallic.
LRTSG Milestone Review 12/16/10 Lithium Research Topical Science Group FY11-FY12 Milestone Review II Charles Skinner for LRTSG 1/7 Follow up to 11/29/10.
Transmission Advisory Group NCTPC Process Update Rich Wodyka September 7, 2006.
1 The Five Year Plan review went well on all counts Review held June 30 - July 2 > 1.5 days of presentations by the Team Panel of nine (Hooper, Bravenec,
For the NSTX Five-Year Research Program 2009 – 2013 M.G. Bell Facility and Diagnostic Plans.
A Design Process Introduction to Engineering Design
A Design Process Introduction to Engineering Design
CMMI Q & A.
Goal of the workshop To define an international roadmap towards colliders based on advanced accelerator concepts, including intermediate milestones, and.
Research Process №5.
A Design Process Principles Of Engineering
The Design Process What Is Design? What Is a Design Process?
A Design Process.
A Design Process Introduction to Engineering Design
A Design Process BW: What are the steps of the Design Process????? No Google! Do you have a lock????? What’s the combo?
It’s Not Just for OMB Anymore…
Stan Whitcomb LSC meeting Livingston 21 March 2005
Near-term plan for the current ARIES project
A Design Process.
A Design Process Introduction to Engineering Design
Decision Matrix.
TWG goals, approach and outputs
A Design Process.
Review of TDR Chapter 9 “Transition to Operations”
Presentation transcript:

PAC-35 responses: M&P and Liquid Metals MA Jaworski 7/24/14

Detailed investigation of each wall- conditioning step & advanced planning I stick by my answer given at the PAC meeting: – The transition from one state of the machine to the next determined by run- time requests for different wall conditions. – We want to get TMB and LITER ready on day one so the physics experiments are not driven by the tool availability. Plasma conditions achievable by each conditioning step in this new machine will be established in the first run year (XPs should be realistic) Add to the XP planning process whether a researcher specifically requires pure-C, B, or Li-conditioning and run-coordinator schedules as appropriate (isn’t this already done?) Page 3… 2

Surface science experiments need to reflect tokamak conditions… Agree that the collaborating groups with surface-science laboratory studies should conduct research relevant to understanding PMI processes with these mixed materials/complex situations But: Understanding the processes often means experiments in highly controlled conditions (e.g. single crystals) so appropriate models can be developed (e.g. understanding multicrystalline systems from single-crystal effects) (Feed-back for me that I should have made a stronger connection in this regard…) 3 Page 8…

Systematic approach to address wall conditioning… See Stefan’s answer. An efficient approach: – Suggest that the first run-year of “essentially new device” provide the base data (i.e. “catalogue approach”) and accommodate specific run time requests as appropriate to the research milestones E.g. some optimization with TMB should happen to validate cryo-design input data E.g. but fishing trips for performance with “pure” C tiles might not be justified – FY16 run can perform more “hypothesis-driven” experiments of wall- conditioning systems based on FY15 base data set 4 Page 8-9…

Sufficient time for systematic studies… Agree good idea to perform fiducial studies in FY15 and compare to FY16 high-Z upgrades (already the research plan) Agree we should confirm near- and far-SOL particle flux estimates utilized for Canik cryo-pump physics study (e.g. probe data used in that study was from lithiated ops) ELM-pacing issues with dropper/injector vs. LITER left to A. Diallo… 5 Page 9…

Edge studies should be coordinated Agree that all of the edge models benefit strongly from as many experimental constraints as possible and having the data available from day 1 would help with transitions Agree it would be good to have which codes for modeling surface responses. – PMI/evolution models are intrinsic in WallDYN and are being developed. – MD/DFT/etc. codes are often helpful and could be developed by NSTX- U collaborators (and possibly PPPL theory?) 6 Page 9…

Strategy and plan for vapor-shielding “success” should be developed Agree Performance metrics for the regime could include radiated power, change in incident heat-flux, reduction in ionic fluxes, degree of divertor impurity trapping Indications that carbon is present to sufficient degree to change performance will be important to identify in FY16 if possible 7 Page 9-10…

Additional comment on high-Z studies Presence of low-Z impurities complicates picture, however – High-Z tiles provide a location of initial source term for wall-evolution codes validated with material migration diagnostics – still useful for PMI studies Limited surface area of high-Z also limits (eliminates) sweeping statements about core-edge integrated scenarios until more complete coverage is present 8 Page 10…

Consider expanded coverage… Agree: expanded coverage would be useful Should decide coverage after reliable cost estimates are created (see next section) W/Mo melting considered but rejected for FY16 – Considering pre-filled LM targets for droplet emission studies that could inform ITER/ITPA R&D Agree: discrete installation locations could be useful for impurity generation experiments and laser blow-off 9 Page 10…

High-Z design and coverage plan (developed w/ K. Tresemer) Physics definition of eng. Reqs. (complete by mid-Nov.) – ISOLVER studies for row 2 and row 3 options – Plasma/heat flux estimates building from NSTX database – PFC response estimates of energy limitations (a la JET-ILW administrative limits) – Pre-filled LM targets design parallel effort (Eindhoven student) Conceptual Design Review (mid-Dec.) – Possible decision point for expanded coverage here Engineering analysis and design refinement (3 mos) – EM analysis to define eddy-current loads – Structural and thermomechanical analysis – Design iterations as necessary Final Design Review (April) Facility milestone of May

Envelope sketch of concept 11 W or TZM lamellae Compression bolt Interface carriage T-bar mounting access Transition segment as necessary (monolithic carbon transition possible) Flat for bi-directional ops. Fish-scale for max q