Waste Targets Review – Main elements of the impact assessment Karolina D'Cunha, Michel Sponar DG Environment, Unit A2.

Slides:



Advertisements
Similar presentations
Transport Study to support an impact assessment of the Urban Mobility Package on SUMPs CoR Meeting June 13 DG MOVE.
Advertisements

Target Review M. Sponar DG Environment, Unit C2. Roadmap on Resource Efficiency Adopted in September aspirational objectives Full implementation.
Recycling for the Future – The Dublin Waste Management Plan Mary O’Reilly RPS Consulting Engineers.
Waste Management and Resource Efficiency
1 DG Enterprise & Industry European Commission Geneva, 18 th March 2008 THE EUROPEAN COMMISSION’S BETTER REGULATION STRATEGY Presentation by Cavan O’Connor.
Main Developments in EU Environment Policy. 1.The 7 th Environmental Action Plan 2.Waste Electrical and Electronic Equipment Updated Directive 3.Timber.
Annual Conference 2008 Future Challenges for the Waste Management Industry Waste Framework Directive - Impact on the European Waste Management Industry.
Implementation of the Waste Framework Directive
Towards a circular economy: A zero waste programme for Europe
Life Cycle Analysis and Resource Management Dr. Forbes McDougall Procter & Gamble UK.
Challenges of Resource Efficiency Karolina Fras European Commission – DG Environment 21 October 2009.
MUNICIPAL SOLID WASTE MANAGEMENT IN ROMANIA “Achievements and Barriers” Dr.eng. Alexei Atudorei ISWA Board Member Representative of ISWA - RDN Southeast.
RESORCE EFFICIENCY FoEE CONFERENCE Janez Potočnik Co-Chair International Resources Panel Brussels, NOVEMBER 24 TH, 2014.
Circular Economy – European Perspective Environmental Services Training Group Local Authority Environmental Conference Athlone, Ierland, 7th May 2015 M.
European Commission Introduction to the Community Programme for Employment and Social Solidarity PROGRESS
European Topic Centre on Sustainable Consumption and Production (ETC/SCP) 1 Municipal solid waste management in EEA member countries- A review of achievements.
Malta, 3 October 2013 Waste matter does S Jorge DIAZ DEL CASTILLO European Commission DG ENV.
111 Synthesis of Questionnaires. Thematic concentration  Most of the new member states support the suggested principle while maintaining the element.
Priority Environmental Investment Programme National Workshop Serbia Overview Of EU Waste Policy Belgrade, 8 th May 2008 Ruslan Zhechkov, REC
The new Waste Framework Directive Commission’s perspective Karolina Fras DG Environment, European Commission.
Fitness Check of environmental monitoring and reporting Stakeholder Workshop 19/20 Nov 2015 Joachim D'Eugenio Steve White DG Environment European Commission.
Fitness Check of environmental monitoring and reporting MIG-P meeting 4 Dec 2015 Joachim D'Eugenio Steve White DG Environment European Commission.
EU A new configuration of European Territorial Cooperation Vicente RODRIGUEZ SAEZ, DG Regional Policy, European Commission Deputy Head of Unit.
Economics in support of biodiversity conservation policy The EC experience Expert Workshop on Biodiversity and Economics, EEA 5 October 2006 Alexandra.
The EU Circular Economy Package (CEP) adopted by the EU Commission on 2 December 2015 An excellent starting position of aluminium Our first analysis of.
Assessment of separate collection in 28 capitals of the EU
Closing the loop – An EU Action Plan for the Circular Economy Werner Bosmans EC – DG Environment 16 December 2015.
DG ENV Environmental assessment procedures for energy infrastructure projects of common interest (PCIs)
EEA priorities on circular economy Multi-annual work programme OutputsTime frame Briefing on progress towards a circular economy in EuropeAnnual.
NAMA potential of Vietnam Vuong Xuan Hoa Institute of Meteorology, Hydrology and Environment Ministry of Natural Resources and Environment Climate Change.
Closing the loop – An EU Action Plan for the Circular Economy
EUROPEAN NEIGHBOURHOOD AND PARTNERSHIP INSTRUMENT - ENPI CROSS-BORDER COOPERATION PROGRAMMES.
The EU waste Policy – Latest News Michel SPONAR - European Commission, DG Environment.
1 Environmental Services Training Group LOCAL AUTHORITY ENVIRONMENT CONFERENCE 2016 Future Challenges and Opportunities for the Environment Hodson Bay.
Circular Economy Closing the loop – An EU Action Plan for the Circular Economy Peter Czaga, DG Environment.
ASSESSING POSSIBLE INCENTIVES TO ENCOURAGE THE PRIVATE SECTOR TO INVEST IN ENVIRONMENTALLY SOUND MANAGEMENT Dr. Leila Devia, BCRC Argentina Ross Bartley,
ROUND TABLE “Exchanging Experience in Absorption of the European Funds: Perspectives for Bulgaria and Poland” 1 April 2011, Sofia Tomislav Donchev Minister.
2015 Waste Proposals: Impact Assessment Julius Langendorff Unit A.2 Waste Management & Recycling DG Environment.
Circular Economy Closing the loop – An EU Action Plan for the Circular Economy.
Stimulating the processing of used materials:
Georges Kremlis DG Environment Head of Unit DG ENV.E.1
Other Regulatory Developments
Budgeting systems : Monitoring and Evaluation
Circular Economy.
Impacts of new Legislation on waste statistics
The European Strategy for Circular Economy – Plastics Strategy and revised Waste Legislation Joanna Drake – Deputy Director-General DG ENV, European Commission.
Simplification in ESI funds for
Secretary General ETIRA
Waste in the Circular Economy package: policy update
DG Environment, Unit D.2 Marine Environment and Water Industry
SCP in the 7th Environmental Action Programme
Circular Economy -Public Consultation – Results
Outline 1. Latest News from the Commission 2. Implementation of the WFD 3. Waste Thematic Strategy 4. Next Steps and Priority needs 5. The example of Packaging.
Towards 2024: Taking Extended Producer Responsibility to the next level Monika Romenska Regulatory & Public Affairs Manager, EXPRA.
Challenges of Resource Efficiency
IPPC Review Stakeholder Hearing
22nd WG D Meeting, 15/4/2012 Jacques Delsalle, European Commission
A Blueprint to safeguard Europe’s waters
DG Environment, Unit D.2 Marine Environment and Water Industry
ECONOMICS IN THE WFD PROCESS
INNOVATION DEALS: A NEW APPROACH TO REGULATION
Towards a Work Programme for the Common Implementation Strategy for the Water Framework Directive (2000/60/EC) Water Directors Meeting 28 November.
Water scarcity and droughts
DG Environment, Unit D.2 Marine Environment and Water Industry
DG Environment, Unit D.2 Marine Environment and Water Industry
EU Action plan for a Circular Economy
European Union Waste Management Policies, Strategies, & Directives
The new EU Waste Legislation: Implementing and Delegated Acts
EEA activities on waste Ioannis Bakas, waste expert
WFD CIS Working Group Meeting Brussels, 4/4/2019
Presentation transcript:

Waste Targets Review – Main elements of the impact assessment Karolina D'Cunha, Michel Sponar DG Environment, Unit A2

Outline  Background  Methodology  Problem definition/Objectives  Policy Options  Targets setting  Proposed Legislation  Conclusions

Background

Why new targets? And why now? 1.Review clauses in 3 Directives by Even with full implementation of existing legislation, valuable resources are lost 3.Gap between existing targets and ambition level of the Resource Efficiency Roadmap and the recently adopted 7 th EAP 4.Room to do more than existing targets – important benefits to capture

Waste generation in decline Strategy to combat food waste in place Recycling/Reuse increased Energy recovery limited to non-recyclable waste Phasing out of landfilling (limited to non- recoverable waste) Use of market-based instruments Implementation of the legislation By 2020, 'taking into account time derogations provided in existing legislation' 7 th EAP Objectives

Methodology

What worked and what didn't? Ex post Evaluations Building blocks What are the main barriers and how to overcome them? EEA ex post assessment EU Court of Auditors report Thematic strategy report Studies on Economic instruments (EPR) Fitness check (packaging) EEA ex post assessment EU Court of Auditors report Thematic strategy report Studies on Economic instruments (EPR) Fitness check (packaging) What are the main impacts? Ex-ante evaluation Impact assessment Legislative proposal Legislative proposal EEA model New modules Questionnaire to all MS + 19 Country visits EEA model New modules Questionnaire to all MS + 19 Country visits Identification of best practices Fact sheets, Roadmaps Seminars in 10 MS Identification of best practices Fact sheets, Roadmaps Seminars in 10 MS Stakeholder consultations on targets and EPR 7th EAP Council/EP opinions Country visits Committee of Region opinion SME's seminar Stakeholder consultations on targets and EPR 7th EAP Council/EP opinions Country visits Committee of Region opinion SME's seminar What are stakeholder point of views? Quality check IA Internal consultation EEA/Eurostat support Specific contract Inform

Stakeholder consultation Consultation/interviews of key stakeholder Definition of main issues to be addressed and possible options Development of a on line questionnaire On line consultation – two parts (experts/non expert) - Summary of the results (670 answers)

Model Design EU Reference Model on Municipal Waste Management: Central Mass Flow Model, and additional operational and assessment modules. Mass Flows Module MSW generation projections Waste prevention and reuse Financial costs Waste collection and treatment costs Recycling, composting & anaerobic digestion Residual waste treatment: MBT & Incineration Resource efficiency indicators and distance to targets assessment, marine litter Landfill Collection module Calculates the cost of current collection systems, and potential additional costs to achieve intended future recycling performance Prevention module Ability to constrain waste, and account the costs of initiatives Environmental impacts Monetised GHG and air quality emissions Employment

Problem Definition

"Loss of valuable materials due to improper waste management" Problem definition

Underlying causes In some MS, lack of administrative capacity Lack of coordination between local/regional and national levels Lack of economic incentives and Sub optimal EPR schemes Inappropriate use of Regional funds Issues related to Governance Uneven quality of statistics Late reaction in case of risks of non-attainment Issues related to monitoring Lack of mid-term targets leading to sub optimal investments Unclear definitions, obsolete requirements Overlaps in targets, ambiguous measurement methods Complex reporting obligations Administrative burden notably for SME’s Issues related to the EU legislation

Objectives

but also:  Simplification/consistency between targets  Improving implementation  Creating mid-term certainty Capture potential benefits: direct savings, access to raw materials, GHG/air emissions reduction, job creation, marine litter reduction, enhanced EU recycling industry Move towards a "circular economy" by re- injecting valuable resources into the EU economy by aligning the waste targets with the 7 th EAP

Options to achieve the objectives

Options Basis = Orientations approved in the 7th EAP  Only achievable targets and deadlines  Avoid completely new targets  No target without clear measurement method More than 60 options were considered, main rejected options:  Overall targets for prevention or re-use,  Recycling targets for industrial, hazardous, mining, commercial waste  Maximum targets for incineration  Same economic instruments for all MS

Options retained Option 1: Ensuring full implementation Option 2: Measures to simplify legislation, improve monitoring and disseminate best practices Option 3: Upgraded targets 3.1 Municipal recycling (60% and 70% by 2030) 3.2 Packaging waste (80% by 2030 – variant for Alu) 3.3 Landfill reduction (25% by 2025, 5% by 2030) 3.4 Combination of 3.1, 3.2 and 3.3: 3.5 Alternative deadlines for groups of MS 3.6 More stringent deadlines with time derogations 3.7 Option extension of the landfill bans

Target setting What is achieved today in the most advanced MS? Feasible targets Based on past experience, what is the time needed? Realistic targets What are the costs and benefits of the options? Affordable targets What are stakeholder views? Acceptable targets

Financial costs (M€ relative to full implementation, EU 28)

Externalities (M€ relative to full implementation, EU 28)

Changes in employment by 2030 relative to full implementation

Stakeholder signals COR outlook opinion 7th EAP EPR consultation Municipal waste Between 65/70% (Industry) and 80% (NGO's) 84% of respondents proposed 70% or more Packaging waste Between 65/70% (Industry) and 80% (NGO's) Landfilling Large support to abandon landfilling in the mid term

Main elements of the proposal

Approach Combination of : Improved/increased targets Measures to ensure proper and full implementation

Prevention, eco-design Aspirational objective to reduce food waste by 30% by 2025 (Art 9 WFD) Ecodesign Extended Producer Responsibility (EPR) - minimum requirements (true and full cost concept linking the fees paid by producers to recyclability of the products)

Separate collection obligation by 2015 (Art 11(1) WFD) New separate collection obligation for bio-waste by 2025 Clarification on measuring Definition of municipal waste New targets – municipal waste recycling

 By 2025:  no landfilling of recyclable waste  max 25% landfilling  By 2030 (aspirational): residual waste only max 5% landfilling  Review clauses: 2018 for inert waste 2025 for the 2030 aspirational target New targets – municipal waste landfilling

New targets – packaging waste recycling Clarification on measuring (same as for municipal waste) Repeal of the recovery and max recycling targets New target for aluminium

Proposed targets

Simplification, data quality and best practices Simplification: Reporting obligations – no more implementation reports Definition + additional exemptions for SMEs Better data: Quality check report + third party verification of statistics National electronic registries (at least hazardous waste) Dissemination of best practices: Minimum conditions for EPR Early Warning System (next slide)

Early Warning System 1.Every 5 years: identification of MS at risk of not meeting the targets + recommendations 2.If identified as at risk, compliance plan, including measures listed in Annex VIII The list of measures in Annex VIII is consistent with: Ex-ante conditionalities Country-specific recommendations Roadmaps discussed with 10 less advanced MS

Conclusions With the proposed option: More jobs (around 180,000) Less GHG (- 443 on the period) Better access to raw material and positive effect on competitiveness Direct savings due to better waste management Reduced marine litter (- 27,5% by 2030) It will require: Better governance/political will needed Best practice dissemination Involvement of the civil society

Thank you for your attention More information: