Engineering Economics

Slides:



Advertisements
Similar presentations
System Engineering & Economy Analysis
Advertisements

Personal Finance Chapter 1: Personal Financial Planning
Section 5.1: Selecting Financial Services and Institutions
System Engineering & Economy Analysis Lecturer Maha Muhaisen College of Applied Engineering& Urban Planning.
Engineering Economics Analysis Dr. Nabeel Yousef
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 10 Relevant Information and.
Issues in Capital Budgeting II
Engineering Economic Decisions
Introduction to Engineering Economic Anastasia Lidya M. 1.
Topic 4 Financing Strategies. Topic 4: Financing Strategies Learning Objectives – (a) Analyze the various sources of borrowing available to a client and.
Relevant Costs for Decision Making. Identifying Relevant Costs Costs that can be eliminated (in whole or in part) by choosing one alternative over another.
© The McGraw-Hill Companies, Inc., 2005 McGraw-Hill/Irwin 21-1 INCREMENTAL ANALYSIS Chapter 21.
Chapter (1) The Central Concepts of Economics
Engineering Economic Decisions
(c) 2001 Contemporary Engineering Economics 1 Chapter 1 Engineering Economic Decisions Rational Decision-Making Process Economic Decisions Predicting Future.
EGN 3615 — Spring 12 ENGINEERING ECONOMICS WITH SOCIAL AND GLOBAL IMPLICATIONS 1.
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton Relevant Information and Decision.
(c) 2002 Contemporary Engineering Economics 1 Chapter 3 Cost Concepts and Behaviors General Cost Terms Classifying Costs for Financial Statements Cost.
1 Engineering Economic Decisions Lecture No.1 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
FINANCIAL DECISIONS AND GOALS
Using Subtraction to Find Incremental Benefits and Costs ©2002 Dr. Bradley C. Paul, modified 2009.
TOPICS 1. FINANCIAL DECISIONS, INVESTMENT DECISIONS AND DIVIDEND DECISIONS 2. FINANCIAL MANAGEMENT PROCESS 3.PROFIT MAXIMIZATION AND WEALTH MAXIMIZATION.
4.2 Sources of Finance (where can companies get money?).
TIME VALUE OF MONEY CHAPTER 5.
Various methods of calculating price for your product or service
6-0 Week 3 Lecture 3 Ross, Westerfield and Jordan 7e Chapter 6 Discounted Cash Flow Valuation.
FOOD ENGINEERING DESIGN AND ECONOMICS
ENTREPRENEURS IN A MARKET ECONOMY
Chapter 4 How Businesses Work McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Financing and Producing Goods. Investing in the Free Enterprise System.
Steve Paulone Facilitator Financial Management Decisions The financial manager is concerned with three primary categories of financial decisions:  1.Capital.
FINANCIAL STATEMENTS. Why Use Financial Statements? Investors and bankers Investors and bankers Suppliers and creditors Suppliers and creditors You and.
Engineering Economy Why is Engineering Economy important? Practical everyday questions –Should you finance your car or pay cash? Finance for $6995 –vs-
ISE 211 Engineering Economics Professor Thomas Koon Introduction Sept. 01, 2009.
1-1 ENTREPRENEURIAL FINANCE Fourth Edition Chapter 1 Financial and Economic Concepts.
Chapter 1 Overview of a Financial Plan
Accounting Principles, Ninth Edition
The Costs of Production Ratna K. Shrestha
Chapter 26 Part 1.
Chapter 12. Cost Concepts for Decision Making A relevant cost is a cost that differs between alternatives. 1 2.
Calculating Costs. Costs Aim: Understand what a business costs are. HW: Ch 16 Q. 1 & 2 pg 65 & 67.
System Engineering & Economy Analysis Lecturer Maha Muhaisen College of Applied Engineering& Urban Planning.
Engineering Economic Analysis Canadian Edition Chapter 1: Making Economic Decisions.
The Balance Sheet.
money you have in a bank either in checking (where you can use the money with an ATM card or by writing a check) or savings (where you earn interest)
1 Calculating the profit or loss of a business. * Profit (what it is and why it matters) * Purpose and main elements of profit/ loss account All students….
0 Business and Personal Finance Unit 1 Chapter 1 © 2007 Glencoe/McGraw-Hill.
Personal Finance and International Review Questions.
Engineering Economic Analysis - 9th Edition Newnan/Eschenbach/Lavelle Copyright 2004 by Oxford University Press, Inc.1 Engineering Economic Analysis 9th.
12/16/ Chapter 1 - Objectives (1.1) When you have completed this section, you will be able to: Define personal financial planning Name the six steps.
Engineering Economic Analysis Canadian Edition Chapter 1: Making Economic Decisions.
What is this course about?
1.02 ~ ECONOMIC ACTIVITIES AND CONDITIONS CHAPTER 2 MEASURING ECONOMIC ACTIVITY.
1 Optimization Techniques Constrained Optimization by Linear Programming updated NTU SY-521-N SMU EMIS 5300/7300 Systems Analysis Methods Dr.
Chapter 1 Overview of a Financial Plan. Copyright ©2014 Pearson Education, Inc. All rights reserved.1-2 Chapter Objectives Explain how you benefit from.
DADSS Lecture 3: Using Excel with Time Value Calculations John Gasper.
1 Chapter 1. Engineering Economic Decisions. 2 Engineering Economics: Economic analysis for engineering and management decision making The term engineering.
Faculty of Applied Engineering and Urban Planning Civil Engineering Department Engineering Economy Lecture 1 Week 1 2 nd Semester 20015/2016 Chapter 1.
6 - 1 Chapter 6 Relevant Information and Decision Making: Production Decisions.
1 Engineering Economics Engineering Economy It deals with the concepts and techniques of analysis useful in evaluating the worth of systems,
Chapter 3 Business Transactions and the Accounting Equation
1 Introduction to Engineering Spring 2007 Lecture 10: Engineering Economics.
Engineering Economic Analysis CHAPTER 1 1. What is Engineering Economy? Engineering economy involves the financial and economic evaluation of projects.
INTRODUCTION TO ENGINEERING ECONOMY
Engineering Economic Decisions
Fiscal Policy Notes – AP Macroeconomics
Engineering Economic Analysis
Fiscal Policy Notes – AP Macroeconomics
What is this course about?
Engineering Economic Analysis
Presentation transcript:

Engineering Economics Text Book Engineering Economic Analysis 9th edition D. Newman, Ted Eschenbach, and Jerome Lavelle

What is it about? It is about decision making. We are providing you with the tools to properly solve and analyze. You need to understand the decision making process and use the proper tools to compare between alternatives. Final Goal: Make better decisions.

Where is Engineering Economic Analysis most suitable? A Sea of Problems Simple problems. Intermediate problems. Complex problems. Where is Engineering Economic Analysis most suitable?

Simple problems Should I pay cash or use my credit card? Do I buy a semester parking pass or use the parking meters? These are pretty simple problems, and good solutions do not require much time or effort

Intermediate Problems Important enough to be given serious thought. Cannot be worked in one’s head. Has economic aspects important in reaching a decision. Examples: Shall I buy or lease my next car? Which equipment should be selected for a new assembly line?

Complex problems They represent a mixture of economic, political, and humanistic elements The decision of Mercedes-Benz to build an automobile assembly plant in Thscaloosa, Alabama, illustrates a complex problem. Beside the economic aspects, Mercedes- Benz had to consider possible reactions in the American auto industry. Would the German government pass legislation to prevent the overseas plant? What about German labor unions?

Engineering Economic Analysis Analysis of costs and benefits. The economic analysis of costs, benefits, and revenues occurring over time is called engineering economic analysis. Example: Construction of a road Costs occur in the near future. Benefits begin when construction is finished and continues for a long time. 7

It answers the following … Which engineering projects are worthwhile? (Petroleum engineer showed oil deposit is worth developing) Which engineering projects should have a higher priority? (limited funds while many projects?) How should the engineering project be designed? (consider the plane example) light material are expensive but cheaper to fly. 8

It also answers personal questions … How to achieve long-term financial goals? (Buy a house, going to graduate school) How to compare different ways to finance purchases? (dealer’s low interest rate or the rebate with the bank?) How to make short and long-term investment decisions? (Higher salary vs stock options). Buy one or tow semester parking pass. 9

The Decision Making Process Rational Irrational or inadequate (Horse example) Should have at least two alternatives to call it “Decision Making” 10

Rational Decision Making Recognize the problem Define the goal or objective Assemble relevant data Identify feasible alternatives Select the criterion to determine the best alternative Construct a model Predict each alternative’s outcomes or consequenses Choose the best alternative Audit the results 11

Rational Decision Making 1. Recognize the Problem - Mercury in fish example - I need a place to live this semester An existing problem might be obvious or hidden ►►Total Quality Management (TQM) or Continuous Improvement (CI) programs to identify problems and present solutions 12

Rational Decision Making 2. Define the Goal or Objective The act of describing the task - Overall goal (e.g. a person leading a pleasant life or a company operating profitably) - Specific (pay off the loan on my car or find a nice apartment) 13

Rational Decision Making 3. Assemble Relevant Information What are the facts? Are more data needed, and is it worth more than the cost to obtain it? Example: To rent an apartment, you need information on rent, utilities, apartment age, parking, distance to campus, distance to shopping, and others. Example 1.1 in your book: Accounting data in the company Note that information need to be relevant in order to be useful 14

Rational Decision Making Identify Feasible Alternatives ► Two types of alternatives are sometimes ignored: a. Do nothing b. Patch it up and keep it running for another year ► It is good to list practical and impractical alternatives. However, do not seriously consider an alternative that cannot be adopted. ► An alternative might be infeasible for violating the safety, violating the religious laws, requiring resource materials that cannot be obtained. ► Only the feasible alternatives are retained for further analysis. 15

Rational Decision Making 5. Select the Criterion to Determine the Best Alternative Now that we listed the alternatives in step 4, it is time to compare. How do you make a choice? Least disturbance to the environment. Improve the distribution of wealth among people Minimize the time to accomplish the goal Minimize unemployment Maximize profit (usually selected in Eng. Decision making Fixed input → need to maximize the benefits or other outputs Fixed output → need to minimize the costs or other inputs Neither input or output fixed → need to maximize the benefits minus the costs 16

Rational Decision Making Constructing the Model Bring the decision-making elements (objective, relevant data, feasible alternatives, and selection criterion) together in relationships (build a model) Mathematical relationship, which is the common in economics Physical model Example: Borrowing money to pay for a car: use a mathematical relationship combining the amount, interest rate, duration, and monthly payments. 17

Rational Decision Making Predicting the Outcome for Each Alternative A model and the data are used to predict the outcomes for each feasible alternative Example: Motorcycle vs. bicycle: A motor cycle makes fuel suppliers happy, makes neighbors unhappy, makes the environment more polluted, and lowers saving account. Use single criterion to measure the relative attractiveness of the various alternatives Example: a pavement that uses demolition wastes vs a pavement that does not. The criterion might be to maximize the use of the waste material. To choose the best alternative, you need to state the outcomes for each alternative in a comparable way (usually in terms of money; i.e. costs and benefits) 18

Rational Decision Making 8. Choose The Best Alternative Choose the alternative that best meets the choice criterion after considering both the numerical consequences and the consequences not included in the monetary analysis. Time to consider intangible consequences. Eliminate certain feasible alternatives if clearly dominated by other better alternatives (process becomes more efficient). Example: On-line vs. in-store purchase of a computer. 19

Rational Decision Making Audit the Results A comparison of what happened against the predictions Example: A new machine purchased to save labor and improve quality, did it? If yes → your analysis worked well If not → what was overlooked? Auditing checks if the economic analysis was extremely optimistic so that the mistakes leading to such inaccurate projections are not repeated. Auditing is an effective way to promote realistic economic analysis calculations (when involved people know that the results will be audited) 20

Engineering Decision Making for Current Costs Costs and benefits occur over a short period of time. Just add up the costs and benefits for each alternative. Choose the best alternative using the suitable economic criterion. 21

Example 1.2 A concrete aggregate mix is required to contain at least 31% sand by volume for proper batching. One source of material, which has 25% sand and 75% coarse aggregate, sells for $3 per cubic meter (m3). Another source, which has 40% sand and 60% coarse aggregate, sells for $4.4/m3. Determine the least cost per cubic meter of blended aggregates.

Example 1-2 Concrete aggregate mix Standards: At least 31% sand by volume Source 1 Source 2 Sand 25% 40% Coarse aggregate 75% 60% Price ($/m3) 3.00 4.40 Let x = Portion of blended aggregates from $3.00/m3 source 1-x = Portion of blended aggregates from $4.40/m3 source Sand Balance: x(0.25) + (1-x)(0.4) = 0.31 x = 0.60 23

… continue Example 1-2 Thus the blended aggregates will contain 60 % of the $3.00/m3 material 40 % of the $4.40/m3 material The least cost per cubic meter of blended aggregates is 0.60($3.00) + 0.40 ($4.40) = 1.80 + 1.76 = $3.56/m3 24

Example 1-3 A machine part is manufactured at a unit cost of 40 cent for material and 15 cent for direct labor. An investment of $500,000 in tooling is required. The order calls for 3 million pieces. Halfway through the order, a new method manufacture can be put into effect that will reduce the unit cost to 34 cents for material and 10 cents for direct labor – but it will require $100000 for additional tooling. This tooling will not be useful for future orders. Other costs are allocated at 2.5 time the direct labor cost. What if any thing, should be done. 25

Since there is only one way to handle first 1 Since there is only one way to handle first 1.5 million pieces, our problem concerns only the second half of the order Alternative A: Continue with Present Method Material cost 1,500,000 pieces x 0.40=$600,000 Direct labor cost 1,500,000pieces x 0.15=225,000 Other costs 2.50 x direct labor cost =562,500 Cost for remaining 1,500,000 pieces $1,387,500

Alternative B: Change the Manufacturing Method Additional tooling cost $ 100,000 Material cost 1,500,000 pieces x 0.34 = 510,000 Direct labor cost 1,500,000pieces x 0.10 = 150,000 Other costs 2.50 x direct labor cost = 375,000 Cost for remaining 1,500,000 pieces $1,135,000

Example 1-4 In the design of a cold-storage warehouse, the specifications call for a maximum heat transfer through the warehouse walls of 30,000 joules per hour per square meter of wall when there is a 30°C temperature difference between the inside surface and the outside surface of the insulation. The two insulation materials being considered are as follows: 28

Insulation Material Cost per Cubic Meter Conductivity (J-m/m2-oC-hr) Rock wool $12.50 140 Foamed insulation 14.00 110 The basic equation for heat conduction through a wall is: Q = K ( ∆ T)/L where Q = heat transfer, in J/hr/m2 of wall K = conductivity in J-mlm2- oC-hr ∆ T = difference in temperature between the two surfaces, in oC L = thickness of insulating material, in meters Which insulation material should be selected?

There are two steps required to solve the problem There are two steps required to solve the problem. First, the required thickness of each of the alternate materials must be calculated. Then, since the problem is one of providing a fixed output (heat transfer through the wall limited to a fixed maximum amount), the criterion is to minimize the input (cost). Required Insulation Thickness Rock wool 30000= 140(30)/L L = 0.14 m Foamed insulation 30000= 110(30)/L L = 0.11m

Cost of Insulation per Square Meter of Wall Unit cost=cost/m3x insulation thickness, in meter Rock wool Unit cost = $12.50 x 0.14m =$1.75/m2 Foamed insulation Unit cost = $14.00 X 0.11m = $1.54/m2