OFFICE MODERNIZATION – Toward lean and efficient administration Presented by: Edly Ferdin Ramly.

Slides:



Advertisements
Similar presentations
Lean Manufacturing.
Advertisements

Total Productive Maintenance
Bringing Sanity to Clinical Work Life Lean in Healthcare Michael Nelson, MD Blue Corn Professional Services, LLC.
Introduction to Lean. Benefits of Lean Why go Lean? Improvements in: –Customer service –Quality and efficiency –Staff morale –Internal communication and.
Chapter 14 JIT and Lean Operations McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Supplier Development Kaizen Implementation Kit
JIT, TPS, and Lean Operations
Chapter 3 Planning for Production. Objectives Product oriented manufacturing systems versus people oriented manufacturing systems. Manufacturing smaller.
Making your Portable Restroom business Lean and mean – How to boost productivity and increase your bottom line.
Just-in-Time and Lean Systems
Chapter 14 Contemporary cost management. Cost management §Improvement of an organisation’s cost effectiveness through understanding and managing the real.
Budgeting.
Balanced Scorecard as a Performance Management Tool
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
Management is Essential
1 Lean Thinking MGMT Lean Thinking A philosophy Principles Practices For the design, operation, management, control and continuous improvement.
Standardized Processes and Procedures. Standardization Supports StabilityStandardization Supports Stability  NOT the same as “work standards”  Faster.
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
Welcome 1 Lean Overview. Housekeeping  Emergencies  Bathrooms  Breaks  Food/drinks 2.
Value Stream Mapping.
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to Lean Manufacturing TOTAL QUALITY MANAGEMENT Lean Manufacturing.
JUST IN TIME. Just in Time Getting the right quantity of goods at the right place at the right time.
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
Using the NAR Association Models Tool Facilitator Guide NATIONAL ASSOCIATION OF REALTORS ® 1.
Implementing Total Quality Management
The Concept of Waste ”Understanding & identifying waste is the
HA Lean Guides An Introduction to Lean Visual Management An Introduction to the Collaborative Planning System February 2011.
Partnering and Collaborative Working An Introduction Dr Neil Jarrett.
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
Standard Business Roadmap Step by Step Guide. Standard Business Roadmap The acid test for ANY system is; “Does it work ?” This system is no different.
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
The Breakthrough Strategy Process Check
Lean Basics Dewey Warden.
Revisiting VA in Service Industry
Chapter 1 Introduction Managers and Managing.
New Directions Learning & Development  All Rights Reserved. Lean Your Library: How Lean Six Sigma Strategies Can Improve Operations.
Philosophy and Key Concepts
Program Participants: This program is designed for the managers, engineers and professionals working in the service / transactional environment, who want.
Lean Manufacturing Chapter 15 pp June 29, 2012.
“Without the Cost of Waste …”
DEFINITION OF MANAGEMENT INTRODUCTION TO MANAGEMENT AND ORGANIZATIONS.
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
The Value Driven Approach
1 What is JIT Inventory? The minimum amount of inventory necessary to keep a perfect system running smoothly Objective is to minimize the stock of parts.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
Kaizen Eventing: The process of observation and the elimination of waste in a process.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
Standard Work (Sample Slides) Superfactory Manufacturing Excellence Series Lean Overview 5S & Visual Factory Cellular Manufacturing Jidoka Kaizen Poka.
© BMA Inc All rights reserved. Lean reporting & control Performance Measurements.
Manufacturing/Office Cells
Just In Time ….. Just in Time Philosophy Salient features  The notion of waste in any operating system  JIT as a philosophy of elimination of waste.
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
LEAN Basics for Offices January 13, WHAT IS “LEAN”? Maximize customer value while minimizing waste.
Productive and Lean Improvement Initiatives Team Champions Training 26 th July, :00 – 13:00 Parkland Hospital.
Choosing Lean Manufacturing Presented to you by : Vrunda Consultancy Service, Ahmedabad.
Mel Wendell – Mountain Pointe High School
Lean Manufacturing Series
Enterprise / Production System Interface Expand Internally/Externally
Lean Manufacturing Basic Overview XYZ Company.
Area of Expertise Marketing` Sales Branding Supply Chain Management Maintenance Quality control Health and safety Production Planning Store Human.
Pull Manufacturing and Just In Time
Introduction to Lean Emily Varnado.
LEAN ORGANIZATION SUMMARY
Kaizen Lean Overview 5S & Visual Factory Cellular Manufacturing Jidoka
Just-In-Time and Lean Production
Introduction to Materials Management
Value Stream Mapping (VSM) Training
LEAN IMPLEMENTATION Training SUMMARY OF RESULTS
LEAN PRODUCTION BY Alfredo Moran Johnny Rojas January, 2006.
Process improvement for the lab
Presentation transcript:

OFFICE MODERNIZATION – Toward lean and efficient administration Presented by: Edly Ferdin Ramly

Contents Introduction Identify Non Value Added Activities Deployment Plan

1 Introduction - Office Modernization

3 Criteria

Resources Organizational Resources:  Man  Machine & other infra-structure  Materials  Method & information  Money $$$$$  Market & brand

Therefore: Any activity that does not directly produce the output is waste Non Value Added This is a more objective judgment Non Value Added sometime called waste. Waste is: "anything other than the minimum amount of equipment, materials,parts, and working time absolutely essential to work." The Rough Guide to Waste is: Difficult to get a team to agree what is absolutely essential!

This is objective, accurate and challenging - giving a strong basis for agreement This is objective, accurate and challenging - giving a strong basis for agreement Every activity should be considered as waste, unless it: Meets an explicit customer requirement Meets an explicit customer requirement Cannot be shown to be performed more economically Cannot be shown to be performed more economically If the activity does not meet a known customer requirement or could be performed more economically, why continue in the same manner? Definition of What Is Not Waste

The 7 Wastes Waiting Over-produce Rework Motion over-Processing Inventory Conveyance

Waste is everywhere! The elimination of waste is a massive opportunity!! Lean Strategy is the best way to eliminate waste Elimination of Waste

Lean Benefits Org A, Application processing time 62% reduction in turnaround time at Licensing Department Customer who once found themselves able to talk with a Dept C associate only 76% of the time now have a 99% chance of success on the first try. Reduce of 10 steps to 3 steps in payment process.

2 Identify Non Value Added Activities - Value Stream Mapping - Process Mapping - Spaghetty Diagram

Value Stream Mapping : Benefits Visualize the entire value stream. Link man + information flows. See the sources of waste. Highlight the real decision points. Link actions to flow results. Blueprint your implementation. Speak a common language.

PROCESS CHART Receiveapplication Inspect Table A Wait for check Approve Keep 0:00 0m 0:40 5m 2:15 35m 8:00 35m 8:10 36m 9:00 48m Cumulative Cumulative Time Dist Time Dist Process Mapping

Common Implementation 1. Engage the entire office team - especially top management and line workers. For Lean to succeed, we need the complete support (financial, time and spirit) of senior management and the buy-in and feedback of the workforce, who often have the best knowledge of what is really happening "in the trenches." 2. Use Process Mapping (PM) to map out current processes, information flows and paper flows. 3. Use the Current State Map to identify waste (time & activities) and to determine what we really need to capture from the current process. 4. Build a Future State Map that identifies WHAT the office should be doing and use the FSM to guide the creation of waste free processes and information flows. 5. Only now do we determine HOW to build our processes. 6. Execute the plan and build in a mechanism for and a culture of continuous improvement.

3 Improve Flow

Flow In order to eliminate and reduce Non Value-Added activities, the flow of material and components should be smooth and uninterrupted. A stop-start flow implies placing, stocking, waiting and picking. Once the product has started on its process route it should complete it in One-Piece flow(continuous flow). The analogy for material flow is that of water in a river - the best flow is through clear, wide well defined channels that go directly to the required destination.

A Smooth Flow is Less Disruptive

What can disrupt flow? Searching for paperwork, equipment Long set-up Quality problem In-consistent customer demand Breakdown In-flexible worker/ Skill shortages Large batch size to process Supplier late delivery Waiting for approval

Tools to eliminate disruption 5S Total productive Maintenance Quick changeover/ Flexible tasking Visual Management Poka Yoke and In-line Inspection One piece flow

Application Approval Standard application in Hand Applicatio n Approval Standard Sapplication in Hand Staff One Piece Flow - Flexibility Baton passing zone 3 Staffs

4 Implement Pull

Kanban: A Simple Real Example CustomerTills BurgerRegulator Kitchen As one type of burger is consumed... They are removed from the regulator... And then replenished by the kitchen... Not made to a forecast and pushed at the customer

5 Deployment Plan

Executive/ Top Management Briefing Lean Deployment Committee Formed Deployment Plan Performed Projects Identified (Top 3 wastes) Lean Tools Training Program Lean Tools Training Program Pursue perfection by CompleteElimination Pursue perfection by Complete Elimination Lean Master/ Expert Program Lean Master/ Expert Program Blitz Kaizen LeanConsultancyLeanConsultancy Lean Deployment Plan Phase 1 Lean Awareness Phase 2 Waste Identification Phase 3 Improve Flow Phase 4 Implement Pull Phase 5 Pursue Perfection

Phase 1: Lean Awareness Purpose: To ensure Top Management is to instill complete buy-in & full understanding of what is Lean, with clarity on how Lean can be fitted to their business To eliminate the jargon and ensure common understanding on Lean To set the companywide productivity measure Approach: Step 1: Top Management briefing Adopt lean strategy –Build lean vision into company strategy –Foster learning and establish need –Make commitment Step 2: Lean Deployment Committee form This committee is usually a formation from all the identified respective department heads where they will be bestowed with the authority in decision-making with relation to both Lean technical & cultural implementation Step 3: Lean Deployment Plan performed Carefully strategize in terms of the people selection, resource allocation, incentive system, policies review, etc.

Phase 2: Waste Identification Purpose: To diagnose organization current practice and identify opportunities to eliminate the non-value added activities. To enable development of a solid action plan for your Lean initiative. Approach: Step 4: Identified Project (Top 3 wastes) This is a critical step in Lean. Only the right project selection will lead to substantial results. –Various technique to identify waste, example »Value Stream Map »Process Map »Spaghetti diagram

Phase 3 and 4 Purpose: Phase 3:  To ensure the production or work flow is smooth without disruption.  Eliminate non value added activities that cause disruption on flow. Phase 4:  To produce right quantity and right time  To eliminate overproduce and inventory waste  To manage store and WIP effectively

Phase 5: Pursue Perfection 0,0 1,0 2,0 3,0 4,0 5,0 6,0 7,0 8,0 9,0 10,0 Order levelling Material Control Continuous Flow Visual Controls TPM Quality 5S Training Team Member Involvement Flow Assessment ScoreTarget Score Lean Assessment Radar Chart  Self-evaluation tool based on questionnaire  Gap-analysis: current vs. future lean state

Lean - Conclusions Being Lean is Fun !