April 6th 2009Olympus Meeting at DESY, F.Brinker1 Detector power supply Detector cooling Polarity switches Kicker pulser Preparation of the experimental.
Advertisements

ILCTA-MDB RF Power Status 9/21/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power Meson Detector Building 3.9 GHz RF Power A0 Building September 21, 2006 [John.
AC-SSC-1 Installation and operation manual
Perform Control Test. Check for Consistent Liquid Temperatures Entering and Leaving Liquid Temperatures should be close when the water pumps are on but.
Power Supply System John Joseph LBNL Spectrometer Solenoid Test Plan Review Feb 17 th 2012.
1 GE Digital Energy Instrument Transformers, Inc. Test Switches & Plugs Type FT Type RT Type PK-2.
Transmission Bridges All calls through an exchange require the use of a transmission bridge. The main requirements of a transmission bridge are : 1) The.
Status of Electronics and Control System P J Smith University of Sheffield 20 th August 2009.
MICE RF TEST STAND Major Milestones (2006) –Testing of BURLE 4616 circuit September 2006 –Testing of 4616 circuit with full amplitude and phase control.
ESE Lab Computer based Temperature Control Sid Deliwala, ESE Labs.
Slide 1UCSB CMS Weekly Status MeetingCMS Tracker Rod Filters Sam Burke EE Rod Power Line Low-Pass Filter Study 3 August 2004 Sam Burke UCSB HEP Group.
GE Consumer & Industrial Multilin  Single & Three phase models  Specific mount CT’s  Rectangular & Toroidial models  Plastic case & cast models  Multi.
SECTION 4 ELECTRIC MOTORS UNIT 19 MOTOR CONTROLS.
Section 4: Electric Motors
Troubleshooting Electric Control Devices
Wir schaffen Wissen – heute für morgen Paul Scherrer Institut René Künzi Safety for equipment & personnel.
Laser Notcher Status Dave Johnson PIP Meeting April 29, 2014.
Controls and Electrical Preferred Technologies Steve Pavis PH-DT-DI CERN Advel Power Supplies and ABB Circuit Breakers.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
CSFL upgrade – status report. Purchased parts/ spares Red and white heat shrinks, Kapton tape, flat cable, spare diodes.
DC Circuits. EMF and Terminal Voltage Electric circuit needs a battery or generator to produce current – these are called sources of emf. Battery is a.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Electrical & Control Power Supplies Trevor Hartnett.
Verigy V93000 Service Training Appendix B Autotransformer E8005A.
February 17-18, 2010 R&D ERL Alex Zaltsman R&D ERL High Power RF Systems Alex Zaltsman February 17-18, 2010 High Power RF Systems.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
Project Status Update Mark Petree LCLS Self Seeding Status: Management put it on hold. – Preliminary conceptual design completed – Interference.
ELCT 201 Spring 2010 Group Projects Electrical Engineering – ELCT 201.
Power Supply System for DRFS
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
STATUS OF NOKER PULSER FOR SHORT MAGNETS C. C. JENSEN DECEMBER 4, 2013.
Dual PD Amp Circuit Board Test Results By Alexa Staley LIGO G v1 1.
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
Status and schedule for the H - source upgrade at HINS beam line HINS Meson meeting January 5 th, 2012 L. Prost (most inputs from Steve Hays & Alex Chen)
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
Electric Generator Done by Abdullah Al-Hulaimi ID# For Dr shwahdi 10 May 2005.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
HBD Status Craig Woody BNL DC Meeting October 3, 2007.
Status 100% 30% 100% STATUS REPORT on Electromagnetical Perturbations on the Hardwired Safety Alarms  The investigations to understand the causes of hardwired.
Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September Paco Sanchez, RF Group, CELLS (Consortium for.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
ATF hardware status - Orbit Stabilization T.Naito(KEK) ATF2 Project meeting Laboratoire de l'Accélérateur Linéaire (LAL) 1.Orbit oscillation.
May E906 Work and Status TDC readout – One full TDC board, 4 ECL cables/modules KTEV UCLA LV PS – Thanks Dave N.! – +/- 5V, 18A each – Spade /10-12AWG.
Aug 23, 2006 Low Power HLRF System and Impact on Distributed RF System Shigeki Fukuda and Task Force Team of DRFS in KEK KEK.
SMJE 2103 DC Motors. DC Motor Discussion topics: 1.Basic structure 2.Field circuit connections 3.Equivalent circuit 4.Induced torque 5.Terminal characteristics.
親愛的吉姆舅舅: 今天吃完晚餐後,奶奶說,在家 裡情況變好以前,您要我搬到城裡跟 您住。奶奶有沒有跟您說,爸爸已經 好久沒有工作,也好久沒有人請媽媽 做衣服了? 我們聽完都哭了,連爸爸也哭了, 但是媽媽說了一個故事讓我們又笑了。 她說:您們小的時候,她曾經被您追 得爬到樹上去,真的嗎? 雖然我個子小,但是我很強壯,
L1Calo News Activity Summary, Run coordination and Operation Planning Bruce M. Barnett Rutherford Appleton Laboratory.
Danish Ali Nawaz 1CLIC workshop 2016 Danish Ali NAWAZ, BE-ABP LEETCHI: Drive Beam Electron Source Automation Control.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
ESS Linac Upgrade Dave McGinnis Chief Engineer / Accelerator Division May 27, 2014.
David BAILLEUX On behalf of the Caltech group Issues for the Laser Monitoring System M&O - US CMS ECAL IB meeting 19 March Chilled water supply.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Electrical Configuration and System Protection
Report Technical Director Storage-Ring-Installation Completed
The LEP Superconducting RF system has reached its maximum configuration of 288 four-cell cavities powered by 36 klystrons in In 2000, this system,
MICE RF System Power Supplies, Control and Monitoring Status report
MEDIUM VOLTAGE APPLICATIONS.
Electrical & Control.
Tunnel Magnetic system power supply №1 HVM+Heat Power supply HVT SM
Construction and Commissioning of Electronic Test Benches
Understanding Olympian Generator Set Schematics
Focus Coil Quench Detector
ATLAS Thermosiphon Electrical Distribution and Run Modes
SCT/Pixel Draft Rack Layout rcj
Boiler house and changing rooms refurbishment
Earthing Arrangements
TTC Fiber Distribution
Presentation transcript:

ITF Flash:Ti Status Modulator √ Thyratron heater power supply √ Thyratron reservoir power supply √ Maxwell power supply √ Simmer power supply √ Simmer sense and starter circuit ? LMI pulser √ Cooling water system √ Cavity √ Slice PS √ Timing system √ DAQ √

Simmer sense and starter circuit Need to replace meter, Only spare is CID equivalent Trigger pass through relay 50 mV 15 V Low Trip High Trip T In Out Simmer Current (DC) Laser Trigger

Safety issues Simmer power supply 208 V terminals are covered 1 kV, 30 A terminals are open Thyratron heater and reservoir power supplies uncovered output terminals 20 V, 50 A (DC) Same is true for CID Racks will be locked and labeled  Need to arrange with PEM to install terminal covers