Implementing an Energy Management System Brendan Thorne Aughinish Alumina Limited.

Slides:



Advertisements
Similar presentations
Role of Senior Management
Advertisements

IBM Corporate Environmental Affairs and Product Safety
EMS Checklist (ISO model)
Checking & Corrective Action
Siemens Healthcare Integrated Management System (Or the journey to it)
Environmental Management Systems Refresher
Environmental Management System Implementation
[Organisation’s Title] Environmental Management System
INTRODUCTION TO ISO Joan Kithika. OUTLINE DEFINITIONS WHY ENVIRONMENTAL MANAGEMENT? LEGAL OVERVIEW HOW TO MANAGE THE ENVIRONMENT-AN ENVIRONMENTAL.
Environmental Management System (EMS)
GReening business through the Enterprise Europe Network EN Giovanni FRANCO European Commission Enterprise and Industry EN
Cleaner Production Assessment (Chapter 4)
ENVIRONMENTAL MANAGEMENT SYSTEMS. ENVIRONMENTAL ISSUES Global Warming Climate Change Ozone Layer Resource Depletion Population Growth Waste Disposal Effects.
ISO General Awareness Training
Environmental Management Systems Refresher
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Ch3. CP AND ENVIRONMENTAL MANAGEMENT SYSTEMS Course on Cleaner Production Middle East Technical University Department of Environmental Engineering Ankara.
Quality evaluation and improvement for Internal Audit
Computer Security: Principles and Practice
RC14001 ® Update GPCA Responsible Care Committee September 23, 2013.
ISO 9000 Certification ISO 9001 and ISO
ISO can improve energy performance, reduce costs and help meet ESOS requirements
BS EN ISO 14001:2004 Madlen King BSc MSc MIEMA EMS Lead Assessor Lloyd’s Register Quality Assurance Ltd BS EN ISO 14001:2004.
ISO Standard is based on the management model of plan – do - check – act. Today we all be discussing the elements of the standard that deal with.
Environmental Management Systems The ISO Approach Initial Environmental Review & Gap Analysis Presented by: NC Division of Pollution Prevention.
4. Quality Management System (QMS)
Industrial Standards Framework and Energy Management Aimee McKane, Lawrence Berkeley National Laboratory.
Energy Audit- a small introduction A presentation by Pune Power Development Pvt. Ltd.
4. Quality Management System (QMS)
Key changes and transition process
Key changes from OHSAS 18001:1999
Approaches for forest certification System versus performance ? Presentation prepared by Pierre Hauselmann for the WWF / WB Alliance Capacity building.
1 Module 4: Designing Performance Indicators for Environmental Compliance and Enforcement Programs.
Ship Recycling Facility Management System IMO Guideline A.962
Basics of OHSAS Occupational Health & Safety Management System
ISO 14001:2004, Environmental Management System
Visit us at E mail: Tele:
CP methodology adapted to UNFCCC Swedish International Development Agency S ESSION 9.A United Nations Environment Program Division of Technology Industry.
Copyrights I Global Manager Group | Revision 0.1 Feb 2009 | 1 GMG DEMO OF ISO: ENERGY MANAGEMENT SYSTEM AUDITOR TRAINING PRESENTATION KIT.
© EAGLE Registrations Inc CONFIDENTIAL 1 Experience Speaks of Lessons Learned ASQ Illiana February 15, 2011.
Energy Reduction Initiative
Presented by: Meg Boyd The Blue Mountains Drinking Water System: DWQMS Overview.
Presented by Sally Bardossy ENVIRONMENTAL MANAGEMENT SYSTEM presented by Sally Bardossy.
ISO GENERAL REQUIREMENTS. ISO Environmental Management Systems 2 Lesson Learning Goals At the end of this lesson you should be able to: 
ISO 9001:2008 to ISO 9001:2015 Summary of Changes
Hazards Identification and Risk Assessment
ISO NON-CONFORMANCE, CORRECTIVE AND PREVENTIVE ACTION.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
ISO MONITORING AND MEASUREMENT. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be.
ISO DOCUMENTATION. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Name.
Pollution Prevention and Environmental Essentials Conference – 2002 How An EMS Can Enhance Your P2 Program Presented by Mike Garcia.
QOS_ISO/ TS_20021 BSC Balanced ScoreCard QOS Quality Operating System.
The Strategic Goals Program for Metal Finishers: New Strategies for Success Environmental Management Systems (EMS) and Metal Finishers Norma Murphy DPPEA.
ISO Registration Common Areas of Nonconformances.
The common structure and ISO 9001:2015 additions
IS0 ISO, International Organization for Standardization Similar to ASTM Voluntary standards But required for many situations Historically specifications.
Plan Waste Assessment MWM01A. What is the purpose of a waste assessment?  The main aims of a waste assessment are to:  Identify each waste stream on.
Energy Energy comes in many forms including electricity, gas, oil and steam and is a resource used by organisations worldwide Energy is becoming increasingly.
OHSAS Occupational health and safety management system.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
1 Workshop “Energy Efficiency management in chemical Industry sector" Thessaloniki, Greece Use of CARE +Tools in Bulgaria energy management.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
A LOOK AT AMENDMENTS TO ISO/IEC (1999) Presented at NCSLI Conference Washington DC August 11, 2005 by Roxanne Robinson.
EnMS Management Review
Structure and Responsibility
Energy Management at DMWW
Food Production Systems
Environmental Management Systems The ISO Approach Initial Environmental Review & Gap Analysis Presented by: NC Division of Pollution Prevention.
EMS Checklist (ISO model)
How to conduct Effective Stage-1 Audit
Presentation transcript:

Implementing an Energy Management System Brendan Thorne Aughinish Alumina Limited

7 Dec 2005Implementing an Energy Management System2 Overview of Presentation l Background l Selection of DS 2403 l Setting up the system l Using the system to achieve results l Summary

7 Dec 2005Implementing an Energy Management System3 Background l Aughinish Alumina Limited (AAL) produces about 1.7 Mt/year alumina from the raw material bauxite. l Alumina refining is an energy intensive process, energy being almost 30% of operating cost l Because we are such a large energy user we participated in the 2003 Pilot Negotiated Agreement program as an individual company. l One of the agreed points was that AAL would install an Energy Management System.

7 Dec 2005Implementing an Energy Management System4 Selecting DS 2403 l In early 2004 we discussed the options for energy management with SEI. l SEI identified 3 possible routes  The UK Energy Efficiency Accreditation Scheme  The US Standard ANSI/MSE 2000  The Danish Standard DS 2403 l We opted for DS 2403 because it was structured along the lines of ISO which we use. It also has been in operation for many years in Denmark.

7 Dec 2005Implementing an Energy Management System5 Preliminary Assessment l In March 2004 we invited auditors from DNV to visit AAL and assess if it was realistic to achieve certification by October l The auditors concluded that it was possible to achieve certification in the time period. l In April 2004 an AAL/SEI team visited sites in Denmark to assess how they found the system  A/S Dansk Shell Refinery in Fredericia  Dansk Leca in Hingevaert  Aalborg Portland A/S in Aalborg. l The site visits confirmed DS 2403 as a useful tool in improving energy efficiency.

7 Dec 2005Implementing an Energy Management System6 Basic Elements of DS 2403 l The standard is similar to ISO 9001 & ISO l It has 5 main steps comprising  Energy Policy  Planning  Implementation and Operation  Checking and Corrective Action  Management review l The standard commits top management to continuous improvement so the 5 basic steps are repeated again and again

7 Dec 2005Implementing an Energy Management System7 Schematic Illustration of Process Energy Policy Checking Implementation Planning Management Review

7 Dec 2005Implementing an Energy Management System8 Energy Policy l The Energy Policy is the core of the system and ultimately drives the other aspects. l The standard states that “top management shall l The standard states that “top management shall establish and maintain the energy policy of the organization”. l An energy policy should include the following:  Identify the processes that influence energy efficiency  Commit to continual improvement in energy efficiency  Provide a framework to set and assess targets  Comply with relevant legislation  Identify any requirements to which you subscribe  Must be documented and communicated to all employees  Must be available to the public

7 Dec 2005Implementing an Energy Management System9 Planning l The standard requires an Initial Energy Review which must be updated regularly. l These reviews identify the main energy aspects and what steps are being taken to improve efficiency. l The key to effective energy management is to set targets that are realistic but challenging. l An Energy Management Program shows how these targets are to be achieved. This must identify the projects to be implemented, their expected impact on energy usage, who is responsible, and the project timescale. l AAL compiled an Energy Manual to give an overview of the system and link its elements.

7 Dec 2005Implementing an Energy Management System10 Implementation & Operation l This covers day to day plant operation as well as issues such as training, communication, and document control. l Operation & Maintenance  We have procedures for operation and maintenance of equipment having a significant energy consumption l Energy Conscious Design Activities  We must consider how all projects and process modifications affect energy efficiency. l Energy Conscious Purchasing  We must consider energy efficiency in purchasing equipment and materials.

7 Dec 2005Implementing an Energy Management System11 Checking & Corrective Action l Monitoring & Measurement  Having set targets it is essential to track performance against them. AAL tracks performance monthly. l Non-conformances & Corrective Action  A non-conformance occurs if a monthly averages is adverse by more than an allowable deviation.  Performance is reviewed at monthly Energy Reviews.  Non-conformance reports must identify the cause of the problem and recommend action to prevent recurrence. l Audits  Internal audits track performance each quarter.  An external audit is done each year to ensure that we are following the DS 2403 requirements correctly.

7 Dec 2005Implementing an Energy Management System12 Management Review l The standard requires that top management review the performance of the system and the plant. l A quarterly review is held which updates the Management team on all aspect relating to energy efficiency. l The Q4 review discusses energy related targets for the following year. l The Q1 review assesses performance against for the previous year and also looks at how the Energy Management System contributed to improving energy efficiency.

7 Dec 2005Implementing an Energy Management System13 Getting Value from the System l An Energy Management System, like Quality and Environmental systems, must have appropriate resources if it is to be implemented successfully. l The most significant resource is people’s time. Establishing the system is time consuming, as is the day to day operation of the system. l The main tasks involved are:  Compiling the Energy Reviews, Targets, and Programs  Effective monitoring of energy efficiency  Organizing monthly Energy Reviews  Co-ordinating non-conformance reports and follow-up  Organizing Management Reviews  Internal and External audits l Ultimately, the benefit is in proportion to the input.

7 Dec 2005Implementing an Energy Management System14 Impact on Heat Recovery l The most significant benefits came in heat recovery for boiler feed water and spent liquor heating. l The key in 2005 was to set challenging targets. l The targets were based on the original equipment design, adjusted to account for current production. l The investigation concentrated on two aspects:  Temperature measurements identified flooded heaters  Pressure measurements identified steam line restrictions l This approach resulted in significant benefits  Problems with flooded heaters eliminated  The cause of poor feed water heater performance was identified and an action plan implemented  The cause of poor liquor heater performance was identified and an action plan implemented

7 Dec 2005Implementing an Energy Management System15 Regenerative Heat Recovery Flash Tank HEATER Slurry from Upstream FT Slurry to Downstream FT Regenerative Steam Inlet Stream to Heater Condensate

7 Dec 2005Implementing an Energy Management System16 Impact on Other Areas l The cause of low bauxite slurry temperature was identified more rapidly and a solution implemented. l A non-conformance on low lime temperature brought a simple solution that might otherwise not have been implemented. l Various problems with power measurement were identified and resolved. l Evaporator steam economy is now accepted as a good indication of unit performance. l A non-conformance on high power usage in the boilerhouse identified excessive air usage as the problem; the investigation is ongoing.

7 Dec 2005Implementing an Energy Management System17 Energy Conscious Purchase/Design l The standard requires that energy efficiency is integrated into our purchasing & design systems. l At the scope stage the Project Engineer must identify the likely impact on energy. l If the project installs a motor in excess of 55 kW a Technical Assessment is required. l The Technical Assessment has 2 elements:  Justification of the requirement for using this size of motor and consideration of alternatives.  Justification of the selected motor over alternatives. l A Single Report covers both aspects. l A Purchase Order cannot be issued unless the Technical Evaluation is completed and signed.

7 Dec 2005Implementing an Energy Management System18 Summary l An Energy Management Systems can deliver significant benefits by reducing energy usage. l Any such system must have the active support of the Management Team, who must receive regular updates on the progress of the system. l The key to success is to set challenging but realistic targets and use non-conformance reports to identify how to achieve the targets. l To be effective, the system requires a significant input of people’s time, both in set-up phase and in full implementation. l The results will match the input!

Implementing an Energy Management System Brendan Thorne Aughinish Alumina Limited