Hubbard Construction Company d/b/a Mid Florida Materials Request for Special Exception Request for Solid Waste Facilities Permit to operate a Class III.

Slides:



Advertisements
Similar presentations
Proposed Amendments to Chapter 32, Article V, Solid Waste Management Ordinance Case No. PH-ORD-041 Presented by the Orange County Environmental Protection.
Advertisements

Environmental Protection Division June 4, 2013 BCC Public Hearing Solid Waste Management Facility Permit Modification Request Hubbard Construction Company.
Board of County Commissioners PUBLIC HEARING October 28, 2008.
JUNE 4, 2013 BCC CALLED PUBLIC HEARING ON BZA #SE , APRIL 4, 2013 APPLICANT: MID FLORIDA MATERIALS CO.
Section (c)(4): This site lies within the Primary Floridan Aquifer Vulnerability Zones as depicted in Figure WSA-5 (Wekiva Aquifer Vulnerability.
BCC PUBLIC HEARING ON BZA #VA , OCTOBER 3, 2013 APPLICANT: YURI FERRO APPELLANT: WILLIAM A DAVIS, SR. and REBECCA M. DAVIS Orange County Zoning.
June 5, 2007 BCC Called Public Hearing on BZA #SE , April 5, 2007 APPLICANT: Genesis Communications, Inc.
Mid-Florida Materials (MFM) (Division of Hubbard Construction) C&D Debris Disposal Facility Renewal of C&D Permit.
BCC Public Hearing F. 9. Special Exception BZA #SE , April 3, and - G. 10. Solid Waste Management Facility Permit #04-F Modification.
January 29, 2008 BCC Called Public Hearing on BZA # SE , 12/6/07 APPLICANT: Ganesh Bansrupan.
An Appeal of a Request For a Special Use Authorization For a Solar Energy Power Plant Docket SUA Appeal of Rainbow Solar Facility.
Board of County Commissioners PUBLIC HEARING December 2, 2008.
BCC Public Hearing for consideration of an Agreement to Offer Donation of Real Property -and- a Solid Waste Management Permit Renewal APPLICANT: Hubbard.
Proposed Amendments to Chapter 15 Article III Air Quality Control Public Hearing Presented by the Orange County Environmental Protection Division June.
Board of County Commissioners PUBLIC HEARING January 5, 2010.
Proposed Amendments to Chapter 32, Article V, Solid Waste Management, and to Chapter 38, Zoning Orange County Code Presented by the Orange County Environmental.
Proposed Amendments to Chapter 32, Article V, Solid Waste Management, and to Chapter 38, Zoning Orange County Code Presented by the Orange County Environmental.
Board of County Commissioners PUBLIC HEARING February 19, 2008.
OCTOBER 2, 2012 BCC CALLED PUBLIC HEARING ON BZA #SE , AUGUST 2, 2012 APPLICANT: SCOTT LANGTON.
BCC APPEAL PUBLIC HEARING ON BZA #SE APPLICANT/APPELLANT: FIRST KOREAN PRESBYTERIAN CHURCH OF ORLANDO Orange County Zoning Division December.
JUNE 19, 2012 BCC APPEAL HEARING ON BZA #SE , April 5, 2012 APPLICANT/APPELLANT: TONY RAHBANY.
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
Board of County Commissioners PUBLIC HEARING December 2, 2008.
CPA-14-08: Transfer of Development Rights Large Scale Text Amendment Adoption Hearing Board of County Commissioners September 23, 2008.
First Public Hearing February 10,  Board of County Commissioners direction of April 2008 to assess efficiency of development review process and.
Second and Final Public Hearing February 24,
BCC Public Hearing for consideration of a Solid Waste Management Facility Permit - and - Special Exception BZA #SE , Oct 4, 2007 APPLICANT: Waste.
Board of County Commissioners PUBLIC HEARING September 1, 2009.
MAY 8, 2012 BCC PUBLIC HEARING ON BZA # SE , Nov. 03, 2011 APPLICANT: CHANTEL PRESTON APPELLANT: SHAWN R.H. SMITH, Esq., (AGENT FOR CHANTEL PRESTON)
Board of County Commissioners PUBLIC HEARING January 11, 2011.
Board of County Commissioners PUBLIC HEARING June 8, 2010.
Proposed Amendments to Chapter 32 Article V Solid Waste Management and Chapter 38 Zoning 5:01 P.M. Public Hearing Presented by the Orange County Environmental.
Proposed Amendments to Chapter 32 Article V Solid Waste Management and Chapter 38 Zoning 2:00 P.M. Public Hearing Presented by the Orange County Environmental.
Comprehensive Policy Plan Amendments Wekiva Parkway and Protection Act December 18, 2007 Comprehensive Policy Plan Amendments Wekiva Parkway and Protection.
Board of County Commissioners PUBLIC HEARING June 29, 2010.
FEBRUARY 21, 2012 BCC PUBLIC HEARING ON BZA # SE , Nov. 03, 2011 APPELLANT/APPLICANT: CHANTEL PRESTON.
Request to Downzone from R-36 To RU-2 Zoning District Applicant: Marshall Miles of GM Propane Docket Z Request for a Rezoning Board of Supervisors.
Board of County Commissioners PUBLIC HEARING June 23, 2009.
April 8, 2008 BCC PUBLIC HEARING ON BZA # SE APPLICANT/APPELLANT: Fernanda Curione.
January 5, 2010 BCC Called Public Hearing on BZA #SE , November 5, 2009 APPLICANT: Christ Centered Christian Church.
Cumberland Park CCB Project Virginia Department of Environmental Quality October 9, 2007.
Stanton Energy Center Solar Facility Presentation to the Board of County Commissioners February 22,
JULY 16, 2013 BCC APPEAL HEARING ON BZA SE , JUNE 06, 2013 APPLICANT: KEVIN DONAGHY AGENT FOR CHANTEL PRESTON.
Orange County Board of County Commissioners Chapter 15, Proposed Modifications to Article III Air Quality Control Environmental Protection Division June.
Environmental Protection Division Solid Waste Management Facility Permit Request Raynor Shine Recycling Solutions, LLC District 1 October 30, 2012 BCC.
Board of County Commissioners PUBLIC HEARING September 22, 2009.
November 11, 2008 BCC PUBLIC HEARING ON BZA #SE , September 4, 2008 APPLICANT/APPELLANT: Christian Haitian Church, Inc.
Proposed Amendments to Chapter 32 Article V Solid Waste Management and Chapter 38 Zoning 5:01 P.M. Public Hearing Presented by the Orange County Environmental.
Landfill Odor Action Plan Utilities Department October 6,
Residential Plats Orange County Board of County Commissioners August 19, 2014.
Repeal and Replace the Boundary Adjustment Act with the Urban Reserve Act.
(Continued from May 22, 2007) BCC PUBLIC HEARING ON BZA # SE , 4/5/07 APPLICANT: Knowledge Tree Learning Center June 26, 2007.
Grant County Zoning Ordinance Review Public Comment Forum Todd Kays:Executive Director – 1 st District Association of Local Governments.
After-the-Fact Conservation Area Impact Permit Request* Keene’s Pointe Community Association, Inc. District 1 November 1, 2011 *Postponed from the December.
BCC APPEAL PUBLIC HEARING ON BZA #SE APPLICANT/APPELLANT: Centro Cristiano Restauracion Orange County Zoning Division FEBRUARY 9, 2016 (Continued.
Board of County Commissioners PUBLIC HEARING November 9, 2010.
HOLLYWOOD PLAZA PARKING GARAGE BZA #VA APPLICANT: JOSHUA WALLACK APPELLANT: SCOTT A. GLASS HOLLYWOOD PLAZA PARKING GARAGE BZA #VA
March 18, 2008 (continued from February 19, 2008) BCC Called Public Hearing on BZA #SE , December 6, 2007 APPLICANT: Golden Gem Landfill.
Environmental Protection Division January 29, 2013 BCC Public Hearing Solid Waste Management Facility Permit Renewal Request Hubbard Construction Company.
ZOX A request for a special exception to allow a Private Animal Shelter within the ‘A’ (Ag) district 8.18 Acres Railroad Ave, High Springs.
Chapter 15, Amended Article X Wetland Conservation Areas Presented by the Orange County Environmental Protection Division February 5, 2008 Presented by.
JUNE 18, 2013 BCC APPEAL HEARING ON BZA #SE , MAY 2, 2013 APPLICANT/APPELLANT: JAIGOPAUL BISNAUTH.
OPEN SPACE/ CONSERVATION
Washoe County Board of Adjustment
Jefferson County SA Red Rocks Site Approval
Brevard County v Jack Snyder 627 So. 2d 469 (Fla. 1993)
Green Energy and Green Spaces
WHAT YOU NEED TO KNOW ABOUT FINANCIAL ASSURANCE
(CONTINUED FROM APRIL 14, 2009)
Board of County Commissioners
Presentation transcript:

Hubbard Construction Company d/b/a Mid Florida Materials Request for Special Exception Request for Solid Waste Facilities Permit to operate a Class III Landfill

Chronology of Events August 8, 1988 Orange County Approved C&D landfill permit May 9, 2000C&D Facility expanded to 220 acres September 26, 2012 DRC approval of Class III with conditions October 24, 2012 Fla. Department of Environmental Protection issues Class III Permit January 29, 2013 Orange County renewed C&D Permit through 2017 April 4, 2013 Board of Zoning Appeals approval with conditions June 4, 2013 Board of County Commissioners denied 4-3 vote May 1, 2014 Circuit Court overturns decision of County Commissioners

Three judge circuit court panel reversed the decision of the County Commission on May 1, “From review of the record, this Court finds that Hubbard met the initial burden of proof that the application met the statutory criteria for granting the special exception for the landfill and Hubbard complied with the requirements for modification of its solid waste facilities permit to change the landfill classification from C&D to Class III as evidenced by the many stages of the application and approval process and ultimately the evidence presented at the BOCC hearing….” Hubbard Construction Co. v. Orange County (Case No ) May 1, 2014.

“Further, the concerns expressed by the BOCC and the public including the landfill’s height increase, capacity, and the liner issue were addressed and resolved in the reports, studies, and other evidence presented by Hubbard and the DRC, BZA, CEDSD, EPD, and FDEP staff throughout the application and approval process and at the hearing.” Hubbard Construction Co. v. Orange County (Case No ) May 1, 2014.

The request for a special exception and solid waste facilities permit is a Quasi Judicial Matter: The Administrative Record in this case consists of the following: The Application as amended with supporting technical information. The DRC report and recommendation of September 26, 2012 Board of Zoning Appeals report and recommendation of April 4, FDEP Permit dated October 24, 2012 Staff Report of Orange County CEDSD Staff Report of Orange County Zoning Division Transcript of Public Hearing Board of County Commissioners June 10, 2013 Petition by neighbors in support of the Permit Final Order Granting Petition for Writ of Certiorari May 1, 2014 Staff Reports for September 23, 2014 hearing

Agreement to Additional Conditions: In addition to required surficial aquifer wells, install Floridan aquifer monitoring wells No disposal of regulated asbestos containing material Additional visual buffering between trees along Golden Gem Road and along north property line Reiterate prohibition of Class I landfill Add north 100 acres to Agreement To Offer Donation, to include the entire 220 acre site Recycling goal of 50% in two years, and 75% by 2020, to the extent economically feasible

Wekiva Issues Landfill is in the Wekiva Study Area and Not the Wekiva Protection Area Site Specific Geological and Hydrological Studies demonstrate this is not a vulnerable site Studies have been accepted by FDEP, EPD, and found acceptable by the court. Net environmental benefit to requiring a liner to the new area and a Cap for the entire landfill

SW The County shall encourage and support the permitting of Class III or Construction and Demolition landfills over a wide geographic area to best serve the public and support the efforts of the waste management industry to provide waste management services in a timely, economically efficient manner and to preserve capacity at the Orange County Landfill. FLU 6.6 A landowner or developer wishing to develop an area within the Wekiva Study Area or other identified springshed needs to choose an appropriate site for that development. The owner shall evaluate the landscape and geology of the land and seek locations that avoid karst features that have a direct or indirect connection to the aquifer and other environmentally sensitive features, such as sinkholes, streams, wetlands, or major springshed recharge areas. Consistency with Orange County Comprehensive Plan

“…the documents included the detailed technical engineering studies submitted by Hubbard’s professional geologist, professional Engineer, and senior project manager…….These documents addressed the requirements for the special exception and modification per the applicable Laws governing solid waste facilities including section , Florida Statutes, the Wekiva Parkway and Protection Act under chapter 369 Florida Statutes, the Orange County Solid Waste Management Ordinance, and Orange County Comprehensive Plan.” Hubbard v. Orange County Hubbard’s Application Complies with the Applicable Laws Including Wekiva Protection Act

Requested Permit Modifications Change from C&D Waste to Class III Waste (very similar waste) Allows for a larger market and more recyclables No expansion of existing 220 acre landfill No traffic increase over C&D permitted trucks/day Final grade of landfill increased from 43 ft to 50ft over natural grade Estimated 39 years of life as a Class III

OPAQUE BUFFER Wells CLOSE/CAP AREAS AS FILLED Proposed Class III Landfill with Liner and Cap +99% reduction in infiltration through landfill Full liner and cap Clayey soil liner and cap

Landfill Visual Buffer Commitments to Apopka 175 buffer from road 3 foot landscaped berm Would plant wildflowers on slope of closed landfill Will not be visible from Golden Gem Road.

Added Environmental Protections Stormwater Management System Exceeds Wekiva Pollution Abatement Standards; contains 100 year storm Impermeable CapOver entire landfill Impermeable Liner/ Clayey Soil Barrier Layer Replaces approved unlined C&D landfill Groundwater Monitoring Wells 42 additional wells; tested every 6 months (7 Floridan Aquifer, voluntary) Waste CoverWeekly cover with clayey soils Post-Closure Care30 years of care after site closure Open Space or Park220 acre open space or park at closure

Staff Recommendation for Approval of Special Exception And Solid Waste Facilities Permit as follows: Grant of Special Exception with 9 conditions Grant of Solid Waste Facilities Permit 58 original Conditions 6 additional Conditions 7 Waivers “Hubbard’s application was approved with certain conditions and waivers in compliance with the applicable laws.” Hubbard v. Orange County