The New Federal NESHAP Air Quality Rule for Oil and Natural Gas Area Sources Susan Bassett, Air Quality Team Leader URS Corporation Rocky Mountain EHS.

Slides:



Advertisements
Similar presentations
Municipal Solid Waste Landfill NSPS/EG Requirements Illinois EPA Bureau of Air Mike Davidson 217/
Advertisements

MSW NESHAP Control Requirements Contains the same requirements as NSPS/EG. Requires gas collection and control system (GCCS) for same landfill as NSPS/EG.
National Emission Standards for Hazardous Air Pollutants: Municipal Solid Waste Landfills.
METAL COIL SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART SSSS May CFR PART 63, SUBPART SSSS May 2006.
METAL CAN SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART KKKK June CFR PART 63, SUBPART KKKK June 2006.
METAL COIL SURFACE COATING MACT QUESTION & ANSWERS
DRAFT IRON & STEEL FOUNDRY MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART EEEEE.
METAL CAN SURFACE COATING MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART KKKK June 2006 June CFR PART 63, SUBPART KKKK June 2006 June 2006.
METAL FURNITURE SURFACE COATING MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART RRRR July, 2006.
METAL FURNITURE SURFACE COATING MACT COMPLIANCE ASSURANCE
METAL COIL SURFACE COATING MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART SSSS May, CFR PART 63, SUBPART SSSS May, 2006.
METAL COIL SURFACE MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART SSSS May 2006 May 2006.
METAL CAN SURFACE COATING MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART KKKK June, CFR PART 63, SUBPART KKKK June, 2006.
Compliance Dates The final rule was published on January 25, 1995,
METAL FURNITURE SURFACE COATING MACT QUESTION & ANSWERS 40 CFR PART 63, SUBPART RRRR July 2006.
IRON & STEEL FOUNDRY MACT QUESTION & ANSWERS
IRON & STEEL FOUNDRY MACT COMPLIANCE ASSURANCE
Hydraulic Fracturing and Air Issues in the Oil and Natural Gas Sector
Anne M. Inman, P.E. Air Permits Division September 11, 2012.
Landfills Air Pollution Air Compliance and Enforcement Jeff Meyer 1.
MON MACT Storage Tank & Transfer Racks Presenter: James Leonard November 5, 2003 ACC/SOCMA Conference New Orleans, LA.
RICE MACT and Oil Analysis
Air Toxics Rule Changes (pursuant to Session Law ) North Carolina Division of Air Quality July 2013 Environmental Management Commission.
Garry Kaufman Deputy Director Colorado Air Pollution Control Division June 6, 2014.
Colorado Reg Revisions
NSPS OOOO & Fracking Air Quality Rule Updates Oil & Gas Environmental Compliance Conference – Appalachian Basin May 13-14, 2014 Robert Keatley, PE Senior.
Regulatory Drivers for Reducing Solvent Emissions Barbara Johnson, PE Kansas State University Kansas Small Business Environmental Assistance Program March.
New Emission Rules for IC Engines Presented by Scott Wallace Devon Gas Services, L.P.
New Federal Regulations for Internal Combustion Engines Doug Parce.
Louisiana Department of EnvironmentalQuality LDEQ CAM Plan Overview LDEQ’s 27 th Annual Conference on the Environment Cajundome Convention Center Lafayette,
April 15, 2015 Betty Gatano, P.E. Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919)
Implementation and Management of Leak Detection and Repair Programs – New Rules and Other Considerations Nebraska Ethanol Safety & Environmental Coalition.
Highlights of Colorado’s New Oil and Gas Hydrocarbon Emission Reduction Rules - Adopted February 2014 Presentation to WESTAR May 2014 Will Allison Colorado.
Compliance Update NCMA 2015.
WESTAR Oil & Gas Conference October 2008 Lori Bocchino Wyoming Oil & Gas Permitting and New Rule/Policy Revisions.
Proposed Revisions to Colorado Air Quality Control Commission Regulation No. 7 Garry Kaufman Air Pollution Control Division Air Pollution Control Division.
VOC and NO x Rules Related to the Oil and Natural Gas Industries Air Quality Division Bob Gifford Air Quality Specialist, Air Quality Division Presented.
New Air Quality Regulation “NSPS OOOO” Oil and Natural Gas Industry Workshop October 24, 2012 Robert Keatley, PE Senior Engineer/Supervisor DEP – Division.
Mustang Watchdog April 22, 2014
HSEQ M. A. Vancil November 6, 2003 Page 1 ACC/SOCMA MON MACT Workshop November 5-6, 2003 New Orleans, LA Michael A. Vancil, PE Bayer Polymers LLC.
New Orleans / ACC / SOCMA November 2003 Randy McDonald, OAR, USEPA.
Our Vision – Healthy Kansans living in safe and sustainable environments.
Air Toxics Rule Changes (pursuant to Session Law ) North Carolina Division of Air Quality Air Toxics Rule Changes Stakeholder Meeting March 20,
Air Quality 101 Kansas Air Quality Program overview.
10/1/ Air Quality Permitting Air Quality Committee William D. Willets, P.E. Engineering Supervisor DAQ Permitting Section May 7, 2014.
WILL ALLISON AIR POLLUTION CONTROL DIVISION APRIL 16, 2012 Oil and Natural Gas Air Pollution Standards.
ONLINE GENERAL PERMITS NJDEP October 9, 2013 ACE Academy.
| Philadelphia | Atlanta | Houston | Washington DC Boiler MACT Compliance Plans: Failure to Develop Plans Is Planning to Fail Susie Bowden|
Environmental and Clean Air Regulations M IDSTREAM E NERGY L AW C ONFERENCE : M EETING THE D EMAND FOR I NFRASTRUCTURE H OUSTON, T EXAS December 7, 2012.
Compliance Assurance and Title V Monitoring A Summary of Rules and Permitting Issues Peter Westlin, EPA, OAQPS.
HAP Rule 372 Guidance Permitting Division Maricopa County Air Quality Department.
The Paper and Other Web Coating (POWC) MACT – Executive Summary The executive summary is a power point presentation designed to be used for basic education.
Region 9 Title V Permit Review Guidelines Ray Vogel EPA/OAQPS.
New Air Quality General Permit G-70A Oil and Natural Gas Industry Workshop October 24, 2012 Laura Jennings Engineer DEP – Division of Air Quality 10/24/2012.
Update on Methane Regulations Affecting Landfills Pat Sullivan Senior Vice President SCS Engineers Nov. 10, 2015.
1 Addressing Air Quality Impacts from Oil and Gas Development in Colorado WESTAR Conference October 23, 2008 Rose Waldman Colorado Air Pollution Control.
2012 Emissions Inventory Workshop 1. 2  The owner or operator of any facility that is a source of air contaminants shall submit a complete emission.
Standards Certification Education & Training Publishing Conferences & Exhibits Jay Christopher Business Unit Manager, Air & Process Services Trihydro Corporation.
Garry Kaufman Air Pollution Control Division.  Background on Oil and Gas Air Regulation in Colorado  Basis for Additional Air Quality Requirements for.
New Air Quality General Permit G70-A Overview WVONGA Air Permitting Issues Seminar September 12, 2013 Oglebay Resort, Wheeling, WV Laura Jennings Engineer.
Air Quality Division Emissions Inventories SAW: May 3, 2016 Page 1 Point Source Emissions Inventories Air Quality Division Susan Wampler May 3,
Start Do you own or operate a facility that engages in the coating of paper, plastic film, metallic foil or any other web surfaces? Your facility is not.
John Curtin Iowa Department of Natural Resources.
Concepts for Proposed General Permit for Well Pads and Proposed GP-5 Modifications Citizens Advisory Council March 15, Tom Wolf, Governor John Quigley,
NSPS OOOOa Overview Photo from
Clean Air Act Glossary.
Methane Emission Standards for Crude Oil and Natural Gas Facilities
Air Quality Permitting Guidelines for Industrial Sources
Boiler Sheltered Initiative
Kansas Air Quality Seminar March 5, 2008
Presentation transcript:

The New Federal NESHAP Air Quality Rule for Oil and Natural Gas Area Sources Susan Bassett, Air Quality Team Leader URS Corporation Rocky Mountain EHS Peer Group Meeting January 18, 2007 Denver, CO

2 Pollutants and Programs 33 Pollutants Regulated under Urban Air Toxics Strategy Regulates area (minor) sources 70 Area source categories Urban Air Toxics Benzene A major source of HAPs has the potential to emit 10 tons per year (tpy) or more of a single HAP or 25 tpy or more of combined HAPs. 188 Pollutants National Emission Standards for Hazardous Air Pollutants (NESHAP) Program Imposes Maximum Achievable Control Technology (MACT) on major sources May impose less-stringent control on area (non-major) sources Hazardous Air Pollutants (HAPs)

3 Area Source Oil and Natural Gas Production Rule  Published on January 3, 2007 (72 FR 26)  Rule effective on January 3, 2007  Revised 40 CFR Part 63, Subpart HH   Subpart HH formerly addressed only major sources   Area source requirements now included in Subpart HH  Impacts  Expected to affect ~2,400 facilities  Approximately 50 facilities are expected to need add-on controls  National Emission Standards for Hazardous Air Pollutants (NESHAP) with interesting “twist”

4 Overview  Rule introduction  Applicability  Affected facilities & geographic areas  Affected emissions units  Requirements for “rural” sources  Requirements for “urban” sources  Compliance deadlines  Compliance strategies

5 Affected Facilities  Nearly all oil and natural gas production facilities are now subject to Subpart HH   “Black oil” facilities are exempt  Oil and natural gas production facility   Includes: Facilities that process, upgrade, or store hydrocarbon liquids to the point of custody transfer Natural gas from the well up to and including the natural gas processing plant

6 What Is an Area Source Under Subpart HH?  Short answer:   Any existing facility that is not subject to Subpart HH major source requirements  Good time to check for major/area source status:   Emission threshold based on potential to emit (PTE): 10 tpy or more of single HAP, or 25 tpy or more of combined HAPs  PTE calculations are less stringent   Can use maximum actual rather than maximum design throughput   Consider emissions only from glycol dehydration units and storage vessels with potential for flash emissions (rather than entire facility) for production field facilities   May use GRI-GLYCalc™ to calculate emissions

7 TEG Dehydration Unit  Removes water from gas   To meet sales contract specifications   To prevent hydrate formation   To prevent corrosion  Increasing glycol circulation rate increases amount of organics and HAPs in glycol  If no add-on emission control device, HAPs enter atmosphere via TEG dehydration unit process vent

8 TEG Dehydration Unit Process Diagram Source: GRI-GLYCalc TM Software.

9 Area Source Affected Units & Exemptions  Only potentially affected unit is:   Each triethylene glycol (TEG) dehydration unit   All other types of dehydration units are exempt  An exempt TEG dehydration unit has:   <85,000 SCM/D (<3 MMSCF/D) natural gas flow rate (actual annual average), OR   <0.90 Mg/yr (<1,984 lb/yr) actual benzene emissions from glycol dehydration vent  For exempt units, document applicable information:   Natural gas flowrate monitoring   GRI-GLYCalc™ benzene calculations   Benzene emissions test

10 Geographic Location Determines Level of Control  In rural areas   Low level of control based on Generally Available Control Technology (GACT)  In urban areas   High level of control equivalent to Maximum Achievable Control Technology (MACT)  Urban area defined in regulations as:   Urbanized area plus offset and urban cluster boundaries (UA plus offset and UC)

11 UA Plus Offset and UC  Urbanized area (UA):   Densely settled area with >50,000 people (based on 2000 Census)   “UA plus offset” includes 2-mile buffer from boundary of UA  Urban cluster (UC):   As used in Census, densely settled area with >2,500 people   As used in Subpart HH, densely settled area with >10,000 people

12 Colorado UA With Offset and UC Boundaries

13 Front Range UA With Offset and UC Boundaries

14 Location Status Tools  Get instructions from EPA   Locating_UA_census_inst.pdf  Find UAs and UCs at Census Bureau website    Identify Urban-1 counties (for compliance deadline purposes only)   class.pdf

15 Rural Areas — Emissions Control  TEG dehydration unit located outside UA plus offset and UC boundary  Optimize glycol circulation rate, as follows:

16 Rural Areas — Emissions Control (cont.)  Operate so actual glycol circulation rate does not exceed optimal rate  If cannot meet sales gas specification for moisture content:   Calculate an alternative rate using GRI- GLYCalc™, Version 3.0 or higher  No other emissions control is needed  No ongoing monitoring is required  If operating conditions change, calculate new glycol circulation rate

17 Rural Areas — Recordkeeping and Reporting  If TEG dehydration unit is exempt, keep record demonstrating:   Low gas flowrate, or   Low benzene emissions  If unit is subject to glycol circulation rate requirement:   Submit initial notification, including: Demonstration that facility is outside UA plus offset and UC boundary Calculation of optimal (or alternative) glycol circulation rate Manufacturer and model number of glycol circulation pump Statement that facility will operate in accordance with optimal circulation rate

18 Urban Areas — Emissions Control  TEG dehydration unit located inside UA plus offset and UC boundary  Area source TEG dehydration unit process vent requires same emissions control as does major source under Subpart HH  No other major source Subpart HH emissions control requirements apply:   Area source condensate tanks need no control   Area source compressors and ancillary equipment not subject to leak detection and repair (LDAR) requirements

19 Urban Areas — Emissions Control (cont.)  TEG dehydration unit process vent subject to one of the following:   Achieve 95% HAP control efficiency using closed-vent system and emissions control device,   Achieve outlet benzene concentration <0.90 Mg/yr, or   Alternative compliance method: Connect process vent to process natural gas line, or Reduce total HAP emissions by 95% through process modifications and/or emissions control. NOTE: Flash tank emissions need not be controlled if total emissions from glycol dehydration unit process vent meet 95% HAP emission reduction or benzene emissions <0.90 Mg/yr.

20 Urban Areas — Emissions Control (cont.)  Closed-vent system has no detectable emissions  Control devices can include:   Enclosed combustion devices (thermal vapor incinerator, catalytic vapor incinerator, boiler, or process heater)   Vapor recovery device (carbon adsorption system or condenser) achieving 95% HAP reduction   Flare meeting §63.11(b)

21 Urban Areas — Emissions Control (cont.)  If chosen for control technology, enclosed combustion devices must meet one of the following:   Reduce HAP or total organic carbon (TOC) by 95% by weight   Reduce HAP or TOC to 20 ppmv (dry, corrected to 3% oxygen)   Operate at minimum residence time of 0.5 seconds at minimum temperature of 760°C   If boiler or process heater, introduce TEG unit vent stream into the flame zone of the device

22 Urban Areas — Emissions Control (cont.)  If process modification is the emissions control strategy:   Determine TEG dehydration unit baseline operations   Demonstrate overall 95% HAP reduction (process modification only, or in conjunction with control devices)  May not take credit for changes in natural gas inlet characteristics or throughput rate

23 Urban Areas — Initial Testing  If closed-vent system used, demonstrate no detectable emissions (Method 21, 40 CFR Part 60, Appendix A)  Control devices exempt from testing:   Boiler or process heater: With a design heat capacity ≥44 MW Into which the vent stream is introduced with the primary fuel or is used as the primary fuel   Flare designed and operated according to §63.11(b)

24 Urban Areas — Initial Testing (cont.)  Other devices require testing in accordance with detailed procedures in §63.772(e)(3)  If initial testing is needed, identify operating parameter ranges for acceptable emissions control

25 Urban Areas — Inspection & Monitoring  If used, closed-vent systems inspection and monitoring includes:   Annual visual inspections of joints, seams, covers, and sealed connections   Annual no-detectable-emissions inspections for other components  Exemptions allowed for unsafe-to-inspect and difficult-to-inspect components

26 Urban Areas — Inspection & Monitoring  Some control devices are exempt from ongoing monitoring, including:   Flares designed and operated according to §63.11(b)   Boilers or process heaters: With a design heat capacity ≥44 MW Into which the vent stream is introduced with the primary fuel or is used as the primary fuel  For other control devices and process modification strategies:   Demonstrate compliance with maximum or minimum operating parameters identified during initial testing   Parameter monitor must acquire data at least every hour   Compliance is based on daily average value

27 Urban Areas — SSM Plan  Facilities located within UA plus offset and UC boundary must develop a Startup, Shutdown, and Malfunction (SSM) Plan, unless exempt from control requirements  Operate in compliance with SSM Plan

28 Urban Areas — Recordkeeping  Maintain records for 5 years   Keep last 12 months on-site or accessible within 2 hours  Records demonstrating compliance   Inspection data   Monitoring data   Emissions data   SSM events   Flare design (if applicable)  Records demonstrating exemptions

29 Urban Areas — Reporting  Submit initial notification by January 8, 2008 or upon commencing operation  If initial testing is required, submit notice of performance test at least 60 days before planned test date  Submit notification of compliance status within 180 days after compliance date  Submit annual periodic reports by January 30 each year  Submit SSM reports (may be included in periodic reports)

30 Title V Operating Permits  Area sources need not obtain a Title V permit due to Subpart HH  If the facility triggers Title V permitting for another reason, an operating permit would be required:   Subject to New Source Performance Standards (NSPS)   Major source of criteria air pollutants

31 Compliance Deadlines  Compliance deadlines depend on:   Location of TEG dehydration unit In Urban-1 County, In non-Urban-1 County, and/or In UA plus offset and UC boundary   Date that area source commenced construction

32 Urban-1 County (2/6/1998 construction date threshold) UA Plus Offset And UC Boundary Compliance Deadlines Existing: Construction commenced before the construction date threshold, based on the county designation (Urban-1 or non-Urban-1). New:Construction commenced on or after the construction date threshold. For new sources, the compliance deadline is 1/3/2007 or upon initial startup, whichever is later. Urban-1:Urban-1 counties in Colorado are: Adams, Arapahoe, Boulder, Denver, Douglas, El Paso, Jefferson, Larimer, and Weld. Broomfield? Existing 1/4/2010 Existing 1/5/2009 New 1/3/2007 or Startup Urban-2 County or Non-Urban County (7/8/2005 construction date threshold) Existing 1/5/2009 New 1/3/2007 or Startup Existing 1/4/2010 UA Plus Offset And UC Boundary

33 Compliance Strategies  Avoid major source status?  Too late for most facilities: Existing major sources already complying with MACTExisting major sources already complying with MACT  Avoid affected unit status?  Consider using non-TEG dehydration, such as: Non-TEG types of glycol for absorption, orNon-TEG types of glycol for absorption, or Adsorption technologyAdsorption technology  If in “urban” area: Consider adopting federally enforceable limits before compliance deadlineConsider adopting federally enforceable limits before compliance deadline  If in “rural” area: Accept affected unit status because glycol circulation compliance is relatively easy—probably simpler than adopting federally enforceable limitsAccept affected unit status because glycol circulation compliance is relatively easy—probably simpler than adopting federally enforceable limits

34 Additional Information  EPA web page containing implementation information (Subpart HH major and minor sources):    Greg Nizich, USEPA   (919)    Susan Bassett, URS Corporation   (303)  

The New Federal NESHAP Air Quality Rule for Oil and Natural Gas Area Sources Susan Bassett URS Corporation