2 Who Is Carter-Hoffmann? 3 Carter-Hoffmann n Holding n Transporting n Rethermalizing n Serving.

Slides:



Advertisements
Similar presentations
Hoshizaki America has built a legacy of quality design, reliability and customer commitment. In our Commercial Series refrigeration line, youll see solutions.
Advertisements

Good Loading Practices Carrier Transicold and PLM Trailer Leasing.
Equipment for Assembly Fluke Multimeter 115 True RMS Glue Ring Jig Flathead screwdriver 60 Watt desk lamp HIOS Cl 4000 Electric screw driver Anti-static.
inFire HTC speed Furnace Webinar
Kenmore Front Load Washer & Dryer
Refrigerators.
WIRED TYPE MULTI ZONE FANCOIL CONTROL SYSTEM MODEL : WSF- 700 SYSTEM
Digital Non-Programmable Thermostat. Digital screen Setpoint indicator- Appears when the Setpoint temperature is displayed Low battery warning Temperature.
LogTag Training January 2015
HVAC Commercial Ref.
Fridges © PDST Home Economics. Standard  Has a separate ice box which usually has star rating of  or   Has a variety of moulded shelves.
① The output signal of a room thermostat is ON or OFF according to changes of room temperature ② The power supply to a motorized valve is ON or OFF according.
Heating Control Devices
EVOLUTION® Hands-On Demo This guide is meant to help lead a hands-on demo or presentation. The items listed are a suggestion for things to review, please.
Keeping Milk Cold.
DR-2000 Customer Benefits Security; Tamper resistant programming protects your customer and you! Low maintenance, long battery life & long squeeze tube.
4/14/2017.
SGI Confidential Copan 400 Installation. SGI Confidential Installation Overview The approximate minimum time to complete this procedure is.
Field Challenges with DCV Systems Dr. Andrey Livchak, Derek Schrock and Jimmy Sandusky Halton Group Americas
Clean Air Box Usage & Care CABs RAMs CO Monitors.
KLINGE’S NMR 262 Two Independent Systems Integrated into one Unit This Requires Special Features:  Total Redundancy of Refrigeration Components  Total.
Trevor Thompson Senior Project II Vermont Technical College Spring 2011.
1 VACUUM ATMOSPHERES Co NEW PRODUCT ANNOUNCEMENT November 28, 2001.
2013 Microwave Service Training All models. Samsung HA Warranty ALL Warranties are subject to change, always verify. 1 Year Parts & Labor Base Warranty,
Installing Fridge-tag® 2
Combi Oven A Proposal.
McDonald’s Heated Landing Zone
AccuMax Multi-Point Injection Mechanics
Chapter 3 Manual Starters.
Introduction ► Scope:- Service Diagnostics Routines can use for XXL, Side by Side products with STEALTH user interface with single evaporator fan product.
Domina PLUS B WORKING DIAGRAMS TROUBLESHOOTING INTERNAL VIEWS WIRING DIAGRAMS INSTALLATION 03 PREVIOUS MODEL.
On/Off Temp Holiday Select Fan Air clean Operation Auto SwingRoom Temp Week Select SET/CLR Hour MIN Timer Program Set Fan Speed Jet Cool Cancel RESET E_Heater.
Batteries The purpose of the battery is to act as a reservoir for storing electricity.
Air Handler Terminology
Continue The information provided in this training module covers the schematic flow charts for all ovens and ranges that utilized a preheat board, Self.
Convection Oven Overview  Duke’s Line Includes  Two Full Size Lines o Economy Series o 613 Series  Half Size  Baking Stations  Superior Performance.
Identify and Distinguish Standard Oven Thermal, radiant heat is not circulated throughout the oven cavity
Air Handler Terminology
BAKE BROIL - SELECT PROGRAM - CONV BAKE CONV BROIL SELF CLEAN On any diagram screen, double click any of the following components to bring you to a description.
Automated Equipment LLC
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
VAV Box Control Loop The purpose of the VAV Box control loop is to adjust airflow through the box to maintain a space temperature. The difference between.
Thermometers.
MODEL : EDF-102 SERIES 1. APPLICATION The EDF-102 thermostat is designed to provide temperature control of heating or cooling systems in villas, hotels.
Digital Temperature Switches The materials included in this compilation are for the use of Dwyer Instruments, Inc. potential customers and.
ACCU-CHEK Inform II Operator Training
To complete installation on electronic models run one wash cycle then click the DIP switch setting no.4 to the on position DIP switch settings.
CLM Maintenance. Covers : 1 - Side cover, 2 - Back cover, 3 Top cover, 4 - Lamp door, 5 - Side cover input and communication side, 6 - HEPA dust filter,
Service Section Technical Training December 2005.
DS200 PROCEDURES SPEAKER TOUCH SCREEN DISPLAY
Multiple Module Vacuum Oven Productivity Enhancement System.
Last updated: 6/6/2016www.alto-shaam.com Halo Heat Training Cook & Hold OvensHolding Cabinets.
NN-CS596S Steam Microwave Oven. NN-CS596S Oven Specification.
AEON 4000 Including the SMPS 4000 rectifier and the AEON Gold Alarm & Monitoring Unit.
All Freezer Advance. When the Freezer is first supplied with power or if a power outage occurs, the display will indicate this by flashing the temperature.
Using a Digital Data Logger North Carolina Immunization Program (NCIP)
Service Section Technical Training. Sequential Controller SQ 1.0.
WASHING MACHINE Prepared by: DHAVAL MODI PANKAJ SAINANI
Last updated: 6/28/2016www.alto-shaam.com Rotisserie Training Rotisserie.
Coffee Dispenser Set Up and Operation. Set up and Operation Start Up following installation Assuming all installation requirements have been met and the.
Chapter 4: The Flow of Food
Delta’s Contribution for OCP Solution 2014
Bell Ringer What is the temperature danger zone?
Air Distribution Control
Voyager II and III – Energy Recovery Modules
Troubleshooting 11/14/2018 Water King Service Seminar.
Overview of HVAC control panel
The HACCP System.
AUTOMATIC AIR-CONDITIONING SYSTEM OPERATION
Presentation transcript:

2 Who Is Carter-Hoffmann?

3 Carter-Hoffmann n Holding n Transporting n Rethermalizing n Serving

4 Many of the world’s top foodservice companies. Among them: A&W Chi-Chi’s Dairy Queen Dom-Dom’s Don Pablos El Chico Friendly’s Hilton Who Depends on Carter-Hoffmann? Hyatt Jack In The Box Jollibee Lotteria Marriott McDonald’s Morrisson’s Nathan’s Olive Garden Pizza Hut Radisson Taco Bell Taco John’s Taco Maker TGI Fridays Whataburger

5 Bone-In-Chicken Process Chicken Pieces + Fully cooked + Breaded + Flash frozen + Packed in 8-12 piece bags + Delivered frozen to restaurants

6 Bone-In-Chicken Process Heated + From 0 o to _ 10 o F ( _ 18 o to _ 23 o C) to a prefry temperature in 2 1 / 2 hours 120 o F (49 o C) or higher.

7 Bone-In-Chicken Process Held + Up to 3 hours)

8 Bone-In-Chicken Process Fried + In open fryer for 100 seconds

9 Bone-In-Chicken Process Served hot, fresh, and crispy!

10 Current Markets Taiwan

11 Current Markets Singapore

12 Current Markets Northern Ireland

13 Test Markets n Germany n Malaysia n Mexico n Puerto Rico n Thailand n Turkey

14 Why? n Current restaurant procedures take too long. Some markets cannot advertise. Some don’t have the space to install more fryers. n Eliminates possible food handling contamination. n Simplifies operations. n More consistent product. Only 100 seconds away from delivering product to the customer.

15 Old Process n Product arrives at store fully breaded and frozen (other markets receive fresh product and must bread in store). n Product is removed from a secondary freezer and placed into fryer. n Product is fried from minutes in a pressure fryer.

16 Old Process

17 New Process Success Criteria n Product is loaded into a Carter-Hoffmann Rethermalizer.

18 New Process Success Criteria n Gently heated to a prefry temperature in 2.5 hours that when flash fried at 360 o F (182 o C) for 100 seconds the internal temperature reaches 155 o F (68 o C) post fry 90% for the time.

19 New Process Success Criteria n Post fry temperature is measured after a 3-minute wait. n Prefry temperature varies from market due to product size and recipe. n Markets must determine prefry temperature through testing.

20 New Process Success Criteria n Product must pass through the 40 o F to 140 o F (5 o C to 60 o C) danger zone within 4 hours. n Assume the product takes 1 hour to reach 40 o F (5 o C). n The product must reach 140 o F (60 o C) by the time the hold timer reaches 2:30 minutes.

21 New Process Success Criteria n Product must pass sensory evaluations as determined by the individual market.

22 Restaurant Procedures n Load cabinet with frozen product following restaurant’s build to system.

23 n Load cabinet with frozen product following restaurant’s build to system. Restaurant Procedures

24 Restaurant Procedures n After 2.5 hour cook, load basket with product.

25 Restaurant Procedures n Flash fry for 100 seconds.

26 Restaurant Procedures n After flash fry, empty basket and package.

27 n Some markets will hold the product for an additional period of time in a heated holding cabinet. Restaurant Procedures

28 Equipment Model MD1144(ce) Model MD832(ce) Model MD2832

29 Airflow Air inlet ring (includes screen) Air intake grid

30 Airflow Model MD832(ce) Model MD1144(ce)

31 Controller 40-Character LED Display Heater On Indicating Light Shelf Timer Buttons Red/Green Status Indicating Lights 4-Segment Digital Display Calibration Probe Connector Program Button Product Level Button Cancel Button Down Arrow Up Arrow ON/OFF Switch

32 Compensating Controller Features n Easy-to-use recessed touch pads. n Programmable cook and hold temperature/time set points. n Inside mounted. n Temperature can be displayed in Celsius or Fahrenheit. n 30-minute battery backup retains operating memory. n 40-character LED display. Controller

33 Compensating Controller Features n Time programmable “Check Cabinet Levels” status reminder. n “Check Cabinet Level” can be manually accessed for current product levels. n Front mounted calibration port for calibration probe. n Controller can be calibrated at any time after preheat. n “REG” or “SPCY” alpha display available for 2-flavor chicken markets. n Cabinet malfunction displays “error messages.” Controller

34 Compensating Controller Features n Inside mounted. n Individual modules can be serviced/replaced independently. n Individual shelf timers countdown in 4-segment display. n Timers automatically switch from cook to hold. n Red/Green status indicating lights. Timers

35 Compensating Controller Features n Temperature increases as shelf timers are activated. n Temperature decreases when shelf timers switch from cook to hold. n Programmable high and low temperature set points. n Programmable drop and add temperature set points for one heating cycle per occurrence (temperature boost). Automatic Temperature Compensation

36 Parts I.D. Corner Gasket Insert Tray Duct/ Assembly Strike Plate Silicone Gasket Shelf/Duct Assembly Latch Plate Front View of cabinet with door open

37 Parts I.D. Cooling Fan Screen Rear 4” Swivel Casters Outside Top Cover Side View of cabinet

38 Parts I.D. 12/3 Rockbestos Power Cord Plug 320P6W 20A/250 VAC Rear View of cabinet

39 Parts I.D. Air Intake Grid Air Inlet Ring Inside View of cabinet

40 Parts I.D. Inside View of cabinet Cooling Fan Fan Motor Air Duct Thermocouple Cooling Fan Fan Motor Air Return Thermocouple

41 Parts I.D. Inside View of cabinet with heater removed 3 Position Terminal Block 300 o F Auto Reset Hi Limit Thermostat 120 o F

42 Parts I.D. Inside View of cabinet with heater removed Relay Controller Transformer

43 Start-Up Check List

44 Controller Programming Verify the controller programming. Refer to page 14 of the Equipment Manual. The following set points should be used: n Set low temperature to 155 o F (68 o C). n Set high temperature to 200 o F (93 o C). n Set heat time to 2:30. n Set hold time to 3:00.

45 Controller Programming Verify the controller programming. Refer to page 14 of the Equipment Manual. The following set points should be used: n For Model: MD set drop to _ 5 o F ( _ 3 o C). n For Model: MD set add to +10 o F (+6 o C). n For Model: MD832 - set drop to _ 5 o F ( _ 3 o C). n For Model: MD832 - set add to + 10 o F (+6 o C).

46 Monthly Cabinet Calibration Verify the monthly cabinet calibration. Refer to page 13 of the Equipment Manual.

47 Monthly Heat Capacity Verification Test Expected Minimum Rise Time Actual Temp Actual Rise From Actual Starting Temp 0 min. XXXXXX XXXXXXXX 15 min. +15 o from 0 time 30 min. +23 o from 0 time 45 min. +28 o from 0 time 60 min. +33 o from 0 time NOTE: A higher than expected rise in temperature is OK. If the minimum temperature is not met, check for cabinet malfunctions in the heater system.

48 Scheduled Cleaning Shelf duct studs

49 Scheduled Cleaning

50 Trouble- shooting

51 Wiring Diagram MD1144ce

52 Wiring Diagram MD832

53 Wiring Diagram MD832ce

54 Wiring Diagram MD1144

55 Wiring Diagram MD2832 Top Heater

56 Wiring Diagram MD2832 Bottom Heater