Residential Refrigerator & Freezer Decommissioning Measure Update May 13 th, 2014 1.

Slides:



Advertisements
Similar presentations
©2011 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY.
Advertisements

Will CO2 Change What We Do?
Refrigerator Decommissioning: Brother In Law Factor April 23,
E3 Calculator Revisions 2013 v1c4 Brian Horii June 22, 2012.
Estimating Key Parameters for the Retail Plug-Load Portfolio (RPP) Program: Recommended Methodological Approaches EM&V, Residential Programs, Products.
Residential Refrigerators and Freezers UES Measure Update Regional Technical Forum October 14, 2014.
Residential Single Family Clothes Washer UES Measure Update Christian Douglass Regional Technical Forum February 18, 2015.
Residential Refrigerators and Freezers UES Measure Update Regional Technical Forum October 14, 2014.
Oregon Energy Star Homes Measure Update New Measure Proposal April 22nd,
Variable Frequency Drives (VFDs) for Potato/Onion Shed Fans UES Measure Update Regional Technical Forum April 23, 2014.
Grocery Measure: LEDs for Reach-In Display Cases Regional Technical Forum July 21 st, 2015 Mohit Singh-Chhabra.
CHEAPER AND CLEANER: Using the Clean Air Act to Sharply Reduce Carbon Pollution from Existing Power Plants, Delivering Health, Environmental and Economic.
Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30,
Advanced Power Strips (APS) Planning UES Measure Proposal Regional Technical Forum August 20, 2013.
Methodology for Energy Savings claim for Incentive Programs and Codes & Standards(C&S) accounting Presented by: Armen Saiyan P.E. For the California Technical.
Northwest Power and Conservation Council 6 th Plan Conservation Resource Supply Curve Workshop on Data & Assumption Overview of Council Resource Analysis.
Pre-Rinse Spray Valve Small Saver UES Measures Regional Technical Forum September 17, 2013.
Residential Single Family HVAC UES Measures Proven and Planning UES Measure Proposals Adam Hadley Regional Technical Forum December 16, 2014.
Northwest Power and Conservation Council The Northwest Energy Efficiency Market 2007 NAESCO Northwest Regional Meeting June 15, 2007 Tom Eckman Northwest.
Scientific Irrigation Scheduling provisional analysis and research plan BPA December 2014.
Northwest Power and Conservation Council Regional Conservation Update: News From the Front January 24, 2007 Tom Eckman Northwest Power and Conservation.
Residential Behavior Programs RTF Subcommittee Ryan Firestone September 17, 2015.
Northwest Power and Conservation Council Slide 1 Direct Use of Natural Gas Economic Fuel Choices from the Regional Power System and Consumer’s Perspective.
Grocery Measure: EC Motors for Display Cases Regional Technical Forum July 21 st, 2015 Mohit Singh-Chhabra.
Grocery Measure: EC Motors for Display Cases Regional Technical Forum June 16 th, 2015 Mohit Singh-Chhabra.
Development and Deployment of A Standardized Savings and Economic Valuation System for Tracking Conservation Resource Acquisitions in the PNW Presented.
Washington Energy Star and Built Green Homes Measure Update New Measure Proposal August 12th,
Refrigerator Decommissioning: Measure Status Update Regional Technical Forum October 16, 2013.
Anti-Sweat Heater Control Small Saver UES Measure Regional Technical Forum September 17, 2013.
Deemed Savings Update: ECMs in Display Cases Ben Cartwright PECI January 5, 2009.
N ETWORK PC P OWER M ANAGEMENT June 28, 2011 Regional Technical Forum Presented by: Bob Tingleff SBW Consulting, Inc.
UES Measure Updates: Refrigerator and Freezer Recycling Adam Hadley Regional Technical Forum June 16, 2015.
SEEM Calibration: Phase II Single Family Heating Energy Regional Technical Forum September 17, 2013 Presented By: Josh Rushton and Adam Hadley Subcommittee.
SEEM Calibration: Phase II Single Family Heating Energy Regional Technical Forum August 20, 2013 Presented By: Josh Rushton and Adam Hadley Subcommittee.
Commercial Showerhead UES Measure Update Regional Technical Forum April 16, 2013.
Northwest Power and Conservation Council Residential Conservation Resource Assessment Overview of Analytical Process and Major Assumptions April 21, 2009.
Ultra-Premium Efficiency Motor Standard Protocol Recommendation Regional Technical Forum November 19, 2013.
Beyond NEMA Premium Using CEE Motors List 1. Savings Summary Worksheet 2.
UES Measure Updates: Refrigerator and Freezer Recycling (Continued from June) Adam Hadley Regional Technical Forum June 16, 2015.
Overview of DSM Cost Tests June 25, Background Parties developed demand side resource performance standards for post 1994 program cost recovery.
Evaluation of Wood Smoke Quantification and Attribution RTF PAC October 17, 2014.
Guidelines Revisions Defining What RTF Means by “Savings” December 17,
Residential New SF Energy Star Homes UES Measure Update December 17th, 2013.
Residential: Appliances Refrigerator/Freezer Decommissioning: Early Retirement and Recycling May 15, 2012 Measure Status Change Recommendation.
Northwest Power and Conservation Council The Role of Energy Efficiency in the Northwest Power and Conservation Plan Tom Eckman Manager, Conservation Resources.
Ductless Heat Pumps (DHP) in Single Family Homes with Zonal Electric Heat Proven UES Measure Proposal Regional Technical Forum October 16, 2013.
Refrigerator Recycling UES Measure Subcommittee Adam Hadley Subcommittee of the RTF September 1, 2015.
Residential Behavior Programs Ryan Firestone October 20, 2015.
1 Cross-Cutting Analytical Assumptions for the 6 th Power Plan July 1, 2008.
Display Case Motion Sensors Small Saver Measure Update July 16th, 2013.
Refrigerator Decommissioning: Next Steps for Measure Update March 18th,
Refrigerator and Freezer Decommissioning: Deemed Measure Review and Update Regional Technical Forum June 1 st, 2010.
Commercial Clothes Washer UES Measure Update Regional Technical Forum April 16, 2013.
Residential Refrigerator UES Measure Update Regional Technical Forum April 16, 2013.
Idaho and Montana Residential Single Family New Construction Measures Mohit Singh-Chhabra Regional Technical Forum October 20 th, 2015.
ENERGY STAR Commercial Refrigerators and Freezers Regional Technical Forum January 21 st, 2016 Mohit Singh-Chhabra.
1 Summary of Reviews: Workpapers Approved by the California Technical Forum Part 2 Meeting: California Technical Forum January 28, 2016 Jeff Hirsch/Kevin.
Planning UES Measures: Prescriptive Duct Sealing SF Performance-based Duct Sealing SF Performance-based Duct Sealing MH Adam Hadley & Josh Rushton Regional.
Non-Residential Network Computer Power Management Christian Douglass Regional Technical Forum January 21, 2016.
Wood Smoke: Monetizing Health Benefits Regional Technical Forum August 23, 2013.
Residential Single Family Clothes Washer UES Measure Update Regional Technical Forum September 16, 2014.
Commercial Efficient Tank Water Heater UES Measure Update Regional Technical Forum December 17, 2013.
Cost-Effectiveness Analysis of BGE’s DSM Programs Marshall Keneipp, PE Summit Blue Consulting, LLC Prepared for: Energy Efficiency and Conservation Stakeholders.
Residential Refrigerator Decommissioning Subcommittee Meeting “Brother In Law Factor” April 16th,
Residential Behavior-based Programs Measure Development Update Ryan Firestone Regional Technical Forum March 15, 2016.
Northwest Power and Conservation Council The Role of Electric Energy Efficiency in Reducing PNW Carbon Emissions Tom Eckman Manager, Conservation Resources.
Northwest Power and Conservation Council Slide 1 Direct Use of Natural Gas Economic Fuel Choices from the Regional Power System and Consumer’s Perspective.
Existing Condition Baseline Programs & Codes and Standards
Key Findings and Resource Strategy
EM&V Planning and EM&V Issues
Presentation transcript:

Residential Refrigerator & Freezer Decommissioning Measure Update May 13 th,

Measure background Measure Name: Residential Refrigerator & Freezer Decommissioning. Measure Type:UES Measure Category:Proven Measure Sector:Residential Sunset Date:June, 2014 Reason for Update:Update to R2/ Brother-In- Law Factor, Additional Evaluation Data, ProCost Template 2

Staff Highlighted Areas Inclusion of Non Energy Benefits. Guidance on R2 / Brother-In-Law Factor. 3

Measure Update Summary Transferred analysis into latest ProCost template. Updated previous program data (PY '10-'11) with latest data from JACO and ETO (PY '12-'13). Inculcated latest evaluation data from the PNW (ETO, PacifiCorp WA & ID) NEB calculated and applied to TRC 4

Refrigerator Decommissioning Methodology: A primer. 5 Total no. of units recycled Sold/ Donated Kept and used If the refrigerator was not recycled……but it was recycled, so energy savings depend on the counterfactual. Left on grid: % of total units recycled Left off grid: 1 - % of total units recycled Recycled unit would have been off-grid without the program Induced Replacement No Replacement Induced Replacement

Measure Update Summary 6

Non Energy Benefits (NEB) A Southern California Edison (SCE) evaluation conducted by Cadmus (2013) estimated that net-NEB in CA range from $19 to $79 per recycled unit. NEB occur due to added societal benefit from disposing refrigerators via EPA recommended methodology as opposed to baseline disposal practice. Baseline determined via customer survey of program participants. ETO administered similar survey, this data was applied to calculate numbers pertinent to the NW. 7

Non Energy Benefits (NEB) – Northwest Specific Values Surveyed customer baseline disposal practices in the absence of the program divided into four bins. Bin 4 is closest to EPA compliance; bin1 is farthest from EPA compliant disposal practice. ETO data used to develop NW specific values 8

Steps to Calculate NEB per unit Compile list of waste materials from refrigerator, freezer disposal. Calculate weight/ count of each raw material per appliance. Each discard scenario represents a different combination of material-specific disposal methods. Estimate the monetary benefit from EPA compliant disposal (as opposed to no compliance) for each material. Expressed as high, medium, low benefit per appliance. Gross benefits = sum of all benefits under program scenario Net calculated as gross benefits less baseline. 9

Per Unit NEB – Mid Scenario Majority of benefits come from GHG emissions GHG benefits calculated by converting GHG emission to equivalent CO 2 (global warming potential). CO 2 cost taken from council’s forecast of CO 2 prices Cost $ 27 / ton in

Decommissioning Per Unit NEB Net NEBs are $ 53 for the mid scenario. Inclusion of NEBs is dependent on the following questions: Are re-sale costs of recovered material considered in the incremental cost of the measure? What happens to the recovered refrigerant post recycling? These NEBs are currently used to offset incremental measure cost. Staff requests RTF guidance on how to account for these NEBs 11

Brother In-Law/R2 Factor (history) Subcommittee met in April, did not reach consensus. Staff proposal: R2 = 75 % Justification on following slide. Motion made to update R2 to 75% in April meeting. Result: 11 Yes, 1 No, 3 Abs. Motion needs 12 Yes to pass, did not have a quorum. Presentation from April meeting available as backup slides. 12

Staff Recommendation R2 = 75% Justification: Would-be non-opportunistic acquisitions are likely to get acquired anyway (i.e. R2 = 100%). 55% could be the lower limit of R2, based on: Initial Cadmus analysis from 4 extra-regional surveys estimates that 55 % of non-participant recycled units would have ended up as an non- opportunistic acquisition. Assuming all would-be opportunistic acquisitions do not acquire a unit. 100 % is the theoretical upper limit of R2. Assuming all would-be opportunistic acquisitions do acquire a unit. 75 % is in the middle. 13

Early Retirement Treatment New federal standard will be effective in New refrigerators in 2015 may be more efficient than those available now. Recycling refrigerators induces some early replacement. In cases where a recycled refrigerator gets replaced with a new refrigerator, the program could lead to a less efficient replacement. Should the analysis take this effect into consideration? This issue applies to all early retirement measures. 14

Risk Mitigation Credit Risk mitigation credit is the credit for system risk reduction due to conservation. Should the risk mitigation credit be applied to a short lived measure? 15

Decommissioning Energy Savings (kWh) 16

Decommissioning Incremental Cost 17

Decommissioning TRC 18

Proposed Decision “I _________ move that the RTF approve the refrigerator and freezer decommissioning UES measures as proposed with a sunset date of June 2015.” 19

Backup Slides Brother In Law Factor Presentation, RTF April Meeting. 20

Subcommittee Meeting Attendees Jaco: Bob Nicholas, Phil Sisson (Consultant) PSE: Bobbi Wilhelm KEMA: Ken Agnew Cadmus: Josh Keeling, Doug Bruchs CleaResult: Mark Jerome. RTF: Adam Hadley, Mohit Singh-Chhabra CADMUS: Doug Bruchs, Josh Keeling Avista: David Thompson. 21

Brother In Law Factor/ R2 As Per UMP: Percentage of the would-be acquirers of avoided transfers that found an alternate unit are referred to as “R2”. Note, Percentage of the would-be acquirers of avoided transfers that did not find an alternate unit are “(1-R2)”. 22

R2 Option- 1 (UMP/ Status Quo) R2 = 50% Justification: Midpoint between extreme values (0% and 100%) We don’t know and can’t measure this factor accurately. Votes: Bob Nicholas (JACO) Concerned that this factor needs to be studied more before we decide to modify it. 23

R2 Option-2. (PSE Study) R2 = 97 % Justification: Based on survey data. Vote: Bobbi Wilhelm (PSE) “Concerned that because energy savings estimates feed into the adjusted load forecast for DSM that we would over adjust if not taking 97%. Need to be absolutely certain that savings exist because they impact how we plan for supply side and demand side resources. “Worried that voting on savings vs. using best available data limits our ability to optimize our portfolio.” David Thompson (Avista) Agrees with Bobbi’s concern that we need to be certain about savings for load forecasting. 24

R2 Option 3: Meet in the Middle R2 = 75% Justification: Would-be non-opportunistic acquisitions are likely to get acquired anyway (i.e. R2 = 100%). 55% could be the lower limit of R2, based on: Initial Cadmus analysis from 4 extra-regional surveys estimates that 55 % of non-participant recycled units would have ended up as an non- opportunistic acquisition. Assuming all would-be opportunistic acquisitions do not acquire a unit. 100 % is the theoretical upper limit of R2. Assuming all would-be opportunistic acquisitions do acquire a unit. 75 % is in the middle. 25

R2 Option 3: Meet in the Middle Votes: Adam Hadley (RTF) This is a very difficult thing to study; we’re close enough. Mark Jerome (CleaResult) Agree with above logic Doug Bruchs & Josh Keeling (Cadmus) Agree with above logic Phil Sisson (JACO Consultant) Provisionally agree with above logic – but want to review nonparticipant surveys and instruments. 26