LEAN Principles as Management Mindset & Improvement Tool Set.

Slides:



Advertisements
Similar presentations
To Be or Not to Be: Suicide in Shakespeare By Ronjon Siler Tragedy.wikidot.com.
Advertisements

Bringing Sanity to Clinical Work Life Lean in Healthcare Michael Nelson, MD Blue Corn Professional Services, LLC.
LEAN What? How? What helps ? Conclusion. LEAN – What? RETHINKING & REDESIGN OF BUSINESS PROCESS SHORTENED LEAD TIMES REDUCED PROCESS WASTES IMPROVED CUSTOMER.
Hamlet. Analyze Famous Performances Branagh Olivier Hawk Gibson Plummer.
DON’T FEAR SHAKESPEARE
Developing Lean Process Strategies That Work Randy Benson, Ph.D. Executive Director, RHQN.
Your Task: Closely read the passage from Hamlet and write a well-developed, text-based response of two to three paragraphs. In your response, identify.
Going Lean Can it work for the Medical University? Jennifer Hooks MBA Manager, Performance Improvement Six Sigma Master Black Belt Lean Sensei.
Lean Systems Defined Just-in-time (JIT): an older name for lean systems Toyota Production System (TPS): another name for lean systems, specifically as.
Every patient matters STAFF INVOLVEMENT USING LEAN IMPROVEMENT.
Lean Accounting and Value Stream Costing
1 Process Mapping BA 339 Mellie Pullman. 2 Objectives Service Process Differences Little’s Law Process Analysis & Mapping.
Principles of Six Sigma
Lean Six Sigma Knowledge of Lean 6σ Tools can help you in your daily work.
1 © 2005 Superfactory™. All Rights Reserved. Lean Office - 5S and Visual Controls Superfactory Excellence Program™
1 Lean Thinking MGMT Lean Thinking A philosophy Principles Practices For the design, operation, management, control and continuous improvement.
QMS, ISO and Six Sigma It’s all related….. QMS Any Quality Management System must satisfy four requirements: Processes must be defined and their procedures.
Chapter 6, Process-Flow Analysis
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
LEAN MANUFACTURING Jason Prior. Introduction to Lean  Overview of Lean in Toyota video.video  Main Concept: ELIMINATING WASTE  Not an acronym  Not.
Welcome 1 Lean Overview. Housekeeping  Emergencies  Bathrooms  Breaks  Food/drinks 2.
1 Value Stream Mapping Sustainable Operations Professor Mellie Pullman.
Chapter 5 Value Stream Mapping
Overview of Lean Six Sigma
JIT and Lean Operations
The Basics of Lean and Clean Laura Pyzik 2007 Great Lakes/Great Plains P2 Conference March 13, 2007.
Lean Training through IMPLEMENTATION THE WORKSmart! DIFFERENCE.
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 8 Lean Systems McGraw-Hill/Irwin.
LECTURE NOTE. WORLD-CLASS MANUFACTURER Mistake-free ● Fast ● Lean ● Flexible ● Environment-friendly TOTAL QUALITY MANAGEMENT PRODUCTS Delight customers.
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 10 Principles of Six Sigma.
Program Participants: Department Managers, Project Leaders, Senior officers, Black Belt candidates and anyone who desires an understanding of Lean Six.
Workshop A Performance Boosting Tools Reality Check: Are you a Lean, Mean Manufacturing Machine ? The Matrix: Performance Measurement System.
WHA Improvement Forum For December    “Removing Waste and Improving Efficiencies”   Tom Kaster Courtesy Reminders: Please place your phones on MUTE.
Lean and Clean—Friend or Foe? Great Lakes Regional Pollution Prevention Roundtable.
Chapter 1 Enterprise Wide View.
Ten Ways Lean Systems Can Improve Your Organization
CHAPTER BY WALTER ONG, SJ FROM “ORALITY AND LITERACY: THE TECHNOLOGIZING OF THE WORLD” Writing Restructures Consciousness.
Value Analysis/ Flow Analysis
Lean Basics Dewey Warden.
1 Introduction to Value Stream Mapping & Management Major Mark McNabb, USAF.
New Directions Learning & Development  All Rights Reserved. Lean Your Library: How Lean Six Sigma Strategies Can Improve Operations.
Desigh by Parichat1 JUST IN TIME LIMIT JUST IN TIME JUST ON TIME JUST OUT TIME TIME
Philosophy and Key Concepts
LEAN Roger Jones Joe Novello. Introductions Historical Background Baldridge Quality Framework.
1 The Application of Industrial Production Techniques to Health Care Delivery Summary of notes Pittsburgh Regional Healthcare Initiative: Perfecting Patient.
Visual Management Quick Review
Lean Manufacturing Chapter 15 pp June 29, 2012.
Lean Production The elimination of waste in the production process.
Total Productive Maintenance (TPM)
Activity Of The Product. 2freeleansite.com Activity Of The Product Activity of the product focuses the “Product or Thing” from “start” to “finish”. -
The Value Driven Approach
Continuous Improvement (CI) Overview A quick review of principles, methodology, and tools.
Contact Deb Wallace at TMAC (817) or go to for more information Automation & Robotics Research Institute  The University of Texas.
Kaizen Eventing: The process of observation and the elimination of waste in a process.
CPSC 171 Introduction to Computer Science Binary.
AP LITERATURE AND COMPOSITION “IT’S A ‘TO BE OR NOT TO BE’ THURSDAY!” January 12, 2012 – Mr. Houghteling.
Dale Emmerson 75 FSS/FSD Chief, Force Development Flight I n t e g r i t y - S e r v i c e - E x c e l l e n c e Air Force Sustainment Center AFSC Way.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Value Stream Mapping The flow of your business from start to customer March 8, 2012.
Choosing Lean Manufacturing Presented to you by : Vrunda Consultancy Service, Ahmedabad.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
2 You Say Kaizen, I Say “Core Value” Lean Consortium Matthew Schreiber MD VP of Operations for Acute Care Health Spectrum Health May 20, 2016.
DoD Lead Agent: Office of the Assistant Secretary of the Army (Installations and Environment) Department of Defense Voluntary Protection Programs Center.
‘Hamlet’ – Act III. First… Summarise Act III Act III Scene 1 Another soliloquy! Have a look at it and summarise.
LESSON 4 Process Improvement – Lean
Introduction to Value Stream Mapping & Management
Enterprise / Production System Interface Expand Internally/Externally
Hamlet To be, or not to be, that is the question:
An introduction to lean in construction Victoria Shaw Stephen Greenhalgh Both.
Ms. Davis Honor’s British Literature January 9th (B) and 10th (A)
Presentation transcript:

LEAN Principles as Management Mindset & Improvement Tool Set

A system: flow, pull and strive for excellence ◦ Not a set of isolated practices A process, a journey ◦ Not an end state A thought revolution What is Lean? A philosophy that shortens the time between the customer order and delivery by eliminating waste

Lean as a Thought Revolution Traditional Thinking Lean Enterprise Thinking Attack direct laborAttack waste, complexity and variation Quality, cost and cycle time (speed) are addressed individually and often seen as conflicting Quality, cost and cycle time (speed) are addressed concurrently and are seen as highly related Optimize subsystemsOptimize the whole system (including suppliers and customers) Use information technology as “the answer” Use information technology as an enabler of lean processing

Myth or Reality? It’s more efficient to process in batches Zero defects is not a realistic target End of process inspection will always protect patients from harm A healthy clinical practice has a full waiting room and backlog of patients Standard methods (procedures, protocols, methods) stifle creativity and are not a good cultural fit in medicine

Lean Challenges Us to Cut Waste in Half Today! Half the errors Half the cost Half the space Half the labor Half the time Half the complexity Half the steps Half the…….

Requires a Horizontal View Traditional Improvement Approach Value Stream Approach AdmissionEvaluation Ancillary Service DischargeBilling

What Is a Value Stream? Everything, including non-value added activities, that achieves the transformation from raw information/material into what the customer is willing to pay for Network of processes and operations that make materials and information flow Includes the communication of current and future demand throughout the value stream

Types of Waste

Value-Added (VA) Value-Added Timeline Non-Value- Added (NVA) Total time = 70 minutes VA time = 6.5 minutes Percent of NVA time = 91% Travel distance =.25 mile Number of Process steps = 25 Value-added steps = 4 Number of Inspection steps = 4 Number of queues = 11 Write Order Dispense In Pharmacy Enter Data Administer To Patient

Why Focus on Waste? Because most processes are 95–99% non-value-added, a focus on eliminating waste is the best leverage for an improvement effort. NVA 95% VA 5%

Requires Us To Think Differently… VAVA NVA VANVA VA Typical Organization Traditional Improvement With Traditional Investment Strategy Lean Waste Reduction NVA Minor Improvement Original Lead Time Major Improvement Speed up value added steps Add capacity

Is it possible to get all the waste out?

Lean Methods / Language 5S ◦ 5S is a visually-oriented system used to create and maintain greater organization, efficiency and safety while reducing training time, search time, wasted time and resources Rapid Process Improvement Value Stream Mapping

Simplify Sort Separate the needed from unneeded items Create a place for everything and a way to keep everything in its place Visually examine the work area to differentiate normal from abnormal conditions Document and use consistent work methods Hold the gains Sweep Standardize Sustain

Tell at a glance if things are normal or abnormal

Rapid Process Improvement (RPI) A fast-cycle METHOD for implementing lean practices within a particular process Modeled after Toyota workshops for suppliers “Five Days and One Night”

RPI Workshops are…. Focused, intense one week events Targeted process All areas of process represented Vision developed Changes are identified and made during the workshop Little or no money is spent

Four Phases of RPI Workshops

All Areas Represented

Common Goal of Removing Waste

Which Management Problem Would You Rather Have? Problem 1Problem 2 Performance Target

Level 3: Work Unit Inspect Level 2: Company Inspects Level 1: Customer Inspects Level 5: Eliminate Opportunities for Errors Levels of Quality System Prevent Errors Level 4: Self Inspection Check for Defects Detect Errors Level 5 Level 4 Level 3 Level 2 Level 1

.You have 60 seconds to inspect this document..Count the o’s..Score the number at the bottom of the page. To be, or not to be; that is the question: Whether ‘tis nobler in the mind to suffer The slings and arrows of outrageous fortune, Or to take arms against a sea of troubles, And, by opposing, end them. To die, to sleep— No more—and by a sleep to say we end The heartache and the thousand natural shocks That flesh is heir to—‘tis a consummation Devoutly to be wished. To die, to sleep.— To sleep, perchance to dream. Ay, there’s the rub. adapted from Hamlet, William Shakespeare ____ Total

What did we do?  1 st Implementation of RPI at VUMC  Pre-work with planning team  Development of charter  4 day intensive workshop  Includes all segments of Department  Focus on Transition Bundles  Report out to Management Guidance Team  Creation of reliable processes  Measureable metrics for continual improvement

Questions