Sunday 17.04 03:00 injection 336 bunches, ramp, squeeze luminosity. 03:19 Stable beams #1718. Duration: 9h08.  Peak lumi ATLAS/CMS: 3.8/3.6e32.  Int.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
5/11/2012LHC 8:30 meeting Summary of Week 44 Coordination: Mike Lamont & Jan Uythoven.
Weekly summary Summary Week /19.07 M. Lamont & J. Wenninger for the OP team and for all colleagues from the various groups 8:30 meeting 1.
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
LHC 23 June :07: Started injection cleaning with B1. 08:13: Fault on MKI B2. –MKI Beam 2 in P8 had a breakdown at 07:49 during the SoftStart process.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
LHC progress Report LHCC Wednesday 23 rd March 2011.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
Monday h34: beam (1020b) lost after 10 Hz RF trim. Fill h56: XPOC to be reset by expert. 08h18: Masked QPS_STATE SIS interlocks for RB.A12.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
07:30 – 10:30 Asynchronous dump test with Beam 2. No issue found. FIDEL update. Now chromaticity decay corrected. 12:13 Beam dump due to problem in the.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
LHC Machine Operational Status and Plans LHCC, 22nd September 2010 Steve Myers (On behalf of the LHC team and international collaborators)
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Production running 1 pb-1Lost to Mon h2062e32EOF studies Tue h17.152e32UFO Q8.L5 Tue h e32OP request Thu h e32OP.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
MD Planning Fri – Sat (26. – 27.8.)
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Machine Coordinators: G. Arduini, J. Wenninger
Wednesday September 14th
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
Summary of Week 11: 14 – 21 March
LHC Status Su Morning 17-April R. Assmann, B. Holzer et al
Monday – recovery from MKI flashover
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Summary of Week 16 G. Arduini, J. Wenninger
Lost at 12:05 to power converter (RTQX2.R1) problem
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Friday March 4th 08h32: Access for beam dump system.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Planning at 5 o’clock meeting Friday
Finally.... We had to wait a long time.... We had many problems....
Friday Morning 7:30 injection for fill 2908
Sunday
(on behalf of the LHC team)
Summary Thursday h21: Stable beams fill #1303.
Sunday/Monday & :30 Stable beams. Fill #1851.
Saturday :42 stable beams fill 3541
LHC Morning Meeting - G. Arduini
Thursday 30th September De-bunching test
Thursday
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Another Immortal Fill….
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
Saturday 15th May One bunch 1 e11 per beam 09:57: start ramp
Tuesday
Thursday 10:00 Fill 1986 in stable beams.
Presentation transcript:

Sunday :00 injection 336 bunches, ramp, squeeze luminosity. 03:19 Stable beams #1718. Duration: 9h08.  Peak lumi ATLAS/CMS: 3.8/3.6e32.  Int. lumi ATLAS/CMS/LHCb/ALICE: 10.1/9.6/4.3/0.06 pb-1. 11:27 Lost QPS OK on RQD and RQF sector 3-4. Will reset at the end of next rampdown. 12:28 Beam dump. No orbit data > 10 min, SIS interlock. 13:29 incorporating lumi scan:  IP1 is working and IP5 in H only. IP5-V: request is out of range. 13:39 Access started in CMS and US15 for ATLAS.  14:58 CMS access completed. 15:01 Electron stopper relay at Pt 4 not working  access to UJ43 not possible.  access piquet called. LHC 8:30 meeting 18/04/2011

Start Stable Beams #1718 LHC 8:30 meeting 18/04/2011

Peak Luminosity ~ 3.6 x cm -2 s -1 LHC 8:30 meeting 18/04/2011

Sunday/Monday 17/ :19 Electron stopper problem fixed (micro switch).  Patrol lost. Pt 4 ( sectors 1,9,11), organize re-patrol within OP  21:19 RQD QPS: MQ.33R3 reset by the MPE piquet.  21:20 Vacuum valve fault on VVGSW.160.5L4.B fixed. 00:06 Beams dumped injecting third 72b batch for beam 2. Injection had ~1.2e11 p per bunch (was lowered).  Kicker had a spark after 1.5 micro-s, while injecting the 72b batch. First 36b part OK, wrong kick for second 36b part.  Many BLM’s interlocked, LHCb BCM triggered, ~20 magnets tripped (heaters fired), vacuum valves closed, cryo lost 78 & 81 Since then: Recovery without beam.  Cryo OK. Vacuum OK. Collimators OK. Beam after kicker flash-over has been fully analyzed.  For the moment it seems that protection, collimation and MP reaction was OK (designed for this). LHC 8:30 meeting 18/04/2011

Intensity when kicker flashover LHC 8:30 meeting 18/04/2011 Was lowered by ~10% for filling scheme

Flashover on B2 MKI magnet D (1 st magnet seen by beam) after passage of 1 st 36b and before 2 nd 36b – 1 st 36b injection oscillations OK on IQC – 2 nd 36b with +/-5.5 mm oscillations on IQC (TDI edge) – 1 st 36b correctly deflected on BTVDD – 2 nd 36b too high on BTVDD, with reduced intensity 88% of total intensity dumped – had already 2x72b plus 1x12b circulating, lost 1x36b on TDI/TCLIs Losses extensive through P8 and arc 78 – Quench heaters fired on 11 magnets – Vacuum valves closed MKI D vacuum activity for preceding injections – did not recover fully before last injection (unlike other kickers) – precursor? – Vacuum recovering slowly – Experts needed to reset and recondition MKIs Brennan Goddard

Magnet quenches? (Markus Z.) Quench heaters:  9 dipoles + 2 quads Real quenches?  Looks mostly like real quenches.  1-2 doubtful cases To be analyzed in detail Cryo recovered in 10 minutes Access required for QPS (global detector of the three main circuits) More info in MPP logbook LHC 8:30 meeting 18/04/2011

Magnet quenches? (Markus Z.) LHC 8:30 meeting 18/04/2011 See heater discharges + RQ6.L8 + RQX.R8

Magnet quenches? (Markus Z.) LHC 8:30 meeting 18/04/2011 Q2 resistive voltage Heater discharge Q3 side effect

The week #15: Part I Monday - Wednesday:  e-cloud studies continuing  Systematic tests at injection energy, test ramp  Scrubbing shown to be very effective  50ns beam touchy  various strong beam losses (all safe)  BPM systematics solved. Different calibration modes to avoid offsets.  Uncaptured beam minimized.  Betatron loss maps at 3.5 TeV re-done (requalify every 4 weeks). LHC 8:30 meeting 18/04/2011

Orbits differences after 50 ns calibration LHC 8:30 meeting 18/04/2011

Summary of BPM test (BPM team, Joerg) Injected an individual bunch with BPM calibration for individual bunches and corrected back to the normal 450 GeV reference, Downloaded the calibration factors for 50 ns spacing: the measured orbit moved up by an amount consistent with the difference measured between trains and individual bunches (~ mm). Injected 12 bunches after the individual bunch (with 50 ns BPM calibration). The orbit offset disappeared and the orbit in both planes was again centered. After a light correction the rms difference came back to ~60 microns. The conclusion is that if the orbit is calibrated in a mode that is consistent with the bunch filling (single bunch, 50 ns, etc) the orbits measured with the different filling scheme agree within ~60 microns rms, and the shift of the mean values are at the level of microns maximum. Until a sequencer task can be made operational (before the weekend - we hope), the shift crews have been instructed on how to calibrate the BPM system for 50 ns operation. For individual bunch operation, use the existing sequencer task! LHC 8:30 meeting 18/04/2011

current beam 1 current beam 2 ΔI ≈5*10 -4 improved capture & abort gap cleaning (Phillippe) Capture losses 18/04/2011 LHC 8:30 meeting

Losses Start of Ramp LHC 8:30 meeting 18/04/2011 Philippe:Capture losses B1:1.5E10 out of 2.8E13 (0.05%). Capture losses B2: 2.0E10 out of 2.8E13 (0.07%).

Beam Loss with 1020b at 450 GeV Analysis loss with 1020 bunches (50 ns). Fill  Beam lost during +10Hz frequency trim of RF frequency.  Dumped by BLM interlocks (loss limits violated).  Fast loss developed over ~70ms  Highest losses at TCP.B6R7.B2 (skew primary, probably due to losses on upstream H and V primary collimators), reaching 23 Gy/s in 40 us scale and 0.6 Gy/s in 1.3s.  Integrated losses in 1.3s bins went from 5e-4 Gy/s to 6e-1 Gy/s in one second.  Peak losses in 40us bin went from smaller 0.2 Gy/s to 23 Gy/s  Factor ~1000 increase in losses within 70 ms.  Interlocks from various BLM's, including TCP.B6R7.B2  Nice exponential take-off for losses initially. Then saturating.  Started from ~48.5h beam lifetime. Loss reduced lifetime to around 3 minutes.  Power loss went from 46 W to about 46 kW. LHC 8:30 meeting 18/04/2011

 f RF = 10 Hz  Radial orbit change LHC 8:30 meeting 18/04/2011

 f RF = 10 Hz  Beam instability LHC 8:30 meeting 18/04/2011 Losses BBQ beam2

Losses in IR7: up to 23 Gy/s (saturation) LHC 8:30 meeting 18/04/2011

+/- 10 Hz but... LHC 8:30 meeting 18/04/2011 e-cloud checks continued with fewer bunches RF frequency trimmed by +10Hz beams dumped - high losses in IP7

loss pattern: LHC 8:30 meeting 18/04/2011 Tue Morning: the 10 Hz problem revisited b1 b2 Loss occuring ~5 minutes after the frequency trim The lossess affect initially B2 then B1 again and finally B2 The first loss is affecting all bunches while the second only some of the bunches of the tail of the trains No sign of instability is observed either in the BBQ nor from the damper pick-ups Losses at TCPs are consistent with an increase in abort gap population

en detail: b2 LHC 8:30 meeting 18/04/2011 Tue Morning: the 10 Hz problem revisited beam current frequency abort gap intensity bbq amplitude y

The week #15: Part II Wednesday – Saturday:  Ramp with 228b  strong beam losses (all safe)  Fixed by reduced chromaticity, increased damper gain, stronger octupoles in ramp.  Establishing physics with 228b, 50ns. 3 fills, 20h.  Losses at start of collision fixed by doubling transverse damper gain (200 turns damping time). Saturday – Sunday:  Establishing physics with 336b, 50ns.  Trials with 72b injection given up: e-cloud activity, beam losses during going into collision.  Switched to 36b trains.  Doubling transverse damper gain (100 turns damping time). LHC 8:30 meeting 18/04/2011

Ramp with 228b, 50ns: Losses at ~1.5 TeV LHC 8:30 meeting 18/04/2011 TCSG.A6R7.B2 close to dump value

Loss: ~5e10 p/s   ~9 min  ~12 kW LHC 8:30 meeting 18/04/2011

Tune excitation LHC 8:30 meeting 18/04/2011

Intensity around ring LHC 8:30 meeting 18/04/2011

Fixing losses in ramp with 50 ns (13/14.4.) Changes in ramp functions…  Reduction of the chromaticity by 2 units for beam 1 and beam 2 - Horizontal plane in the middle of the ramp.  Increased octupoles.  Increased damper gain. LHC 8:30 meeting 18/04/2011

Betatron Collimation Checked (Loss Maps) LHC 8:30 meeting 18/04/2011

Losses in squeeze LHC 8:30 meeting 18/04/2011

14.4.Beam 2 intensity in lumi opt. (IP1) LHC 8:30 meeting 18/04/2011 2e11 p lost in 5 s  22.4 kW   = 12 min

Beam losses in IR7 LHC 8:30 meeting 18/04/2011 OK for cleaning at 22 kW but one bunch dropped below sensitivity range  IR6 BPM interlock. Logic must be adapted (see also 1.38 TeV experience).

Fixing losses with 50 ns, 228b, collisions Thursday Increasing gain of transverse damper by factor 2. Damping time ~200 turns. LHC 8:30 meeting 18/04/2011

Sa Morning: preparing for 336 bunch operation tunes look strange.... a bit like Christmas in hor.... and no tune in vertical

Peak loss: 3.3e10 p/s   ~20 min  19 kW LHC 8:30 meeting 18/04/ s 1 x p 4 x p

20 kW loss at 3.5 TeV… LHC 8:30 meeting 18/04/2011

Bunch by bunch intensity LHC 8:30 meeting 18/04/2011 losses on many bunches of the 3rd and 4th train always in the second PS injection also specific lumi less (ATLAS) before

Bunch by bunch intensity (Joerg) LHC 8:30 meeting 18/04/2011

Fixing losses with 50 ns, 336b, collisions Saturday Going back to 36b trains Increasing gain of transverse damper by another factor 2. Damping time ~100 turns. LHC 8:30 meeting 18/04/2011

Sa Late: 336 bunch operation switching to 36 bunch trains 16:55h injection / ramp and nice intensity distribution 17:40h Luminosity

Sa Late: Vacuum 18:00h Vacuum during the three 336 attempts beam screen

336 Bunches: Heat load...preliminary First experience with 336 buches: The heat load with the filling scheme with 36 bunches at injection is significantly less than with 72 bunches/injection. 36 bunch trains 72 bunch trains

UFO’s: 90 in 90 minutes LHC 8:30 meeting 18/04/2011

UFO example sector 34 LHC 8:30 meeting 18/04/2011

Lumi leveling test LHC 8:30 meeting 18/04/2011

Understanding I… Beam loss due to small RF frequency trims:  All fully explained by abort gap population and losses?  Not clear to me: go through numbers… Coupled-bunch instabilities kicking in at various instances:  Apparently driven by increase in beam intensity, filling pattern and probably emittance variation from PS.  Equalize bunch intensities and emittances from injectors.  Understand thresholds for coupled bunch instability.  How far can we increase transverse damper gain (20 turn limit  factor 5 still available?).  Look at optimal octupole settings. Vacuum pressures and heat loads:  Stronger for 72b trains than for 36b train.  Understand if this is possible problem.  Define parameters for scrubbing in physics. LHC 8:30 meeting 18/04/2011

Understanding II… Limitations in MP setup:  Single bunch logic for IR6 BPM interlock.  Increase IR7 BLM thresholds for more room in beam loss (20 kW to 500 kW).  No immediate action but needed to go towards design parameters.  Reaction to flaky BPM’s: set SIS interlock values tighter? UFO’s:  Apparently higher rate with 72b trains from e-cloud filling scheme. Why this? Kicker flash-over event:  All fully conform?  Provoked by injection of high intensities? LHC 8:30 meeting 18/04/2011

To be done… Redo periodic loss maps (MP requirement every 4 weeks):  B1/B2 off-momentum Hz, 3.5 TeV (last done 13.4.), 2 ramps  B1/B2 off-momentum Hz, 450 GeV, ~1h Software fix for transfer of feedback reference. Incorporation of lumi scan values. Lumi-leveling for IR8 to be made fully operational. Next intensity step  > 4e32 cm-2 s-1 peak lumi Operational setup of beta* interlock functions for collimation. End of fill scraping  50 ns halo population after lumi fill. Increase coll. BLM thresholds for 500 kW design losses. Handling flaky BPM’s (2.5  offset at TCP, caught by SIS). Single bunch logic for IR6 BPM’s  several dumps. Recurrent HW problems: electron stopper, IR2 compensator 55 LHC 8:30 meeting 18/04/2011

Incoming LHC 8:30 meeting 56 18/04/2011 MondayRecovery from kicker flash-over Loss maps for collimation (2b, 3.5TeV, 450 GeV) Analyze kicker flash-over event. If fully conform:...Physics 336b (another ~10h) and beyond