Solar Probe Plus FIELDS ICU/FSW Peter R. Harvey Dorothy Gordon –ICU Will Rachelson – FSW Dec 1, 2012.

Slides:



Advertisements
Similar presentations
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) GSE Timothy Quinn.
Advertisements

IO Controller Module Arbitrates IO from the CCP Physically separable from CCP –Can be used as independent data logger or used in future projects. Implemented.
Instrument TrainingIDPU - 1 UCB, Dec 6, 2006 THEMIS INSTRUMENT TRAINING IDPU.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Pre-Environmental Review May , 2012 Flight Software Peter R. Harvey Mars Atmosphere and Volatile.
Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
Telecom 1 9/17/2012 SPP/FIELDS Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
SwRR 4/28/ Telecon MAVEN Particles and Fields Flight Software Requirements Review SwRR Peter R. Harvey April 28, 2010.
Selda HeavnerFIELDS iPDR – Antenna Electronics Board Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Board Selda S. Heavner U.C. Berkeley
Solar Probe Plus FIELDS Quarterly Management Nov 15, 2012.
Revised: Aug 1, ECE 263 Embedded System Design Lesson 1 68HC12 Overview.
ISUAL Instrument Software S. Geller. CDR July, 2001NCKU UCB Tohoku ISUAL Instrument Software S. Geller 2 Topics Presented Software Functions SOH Telemetry.
Barbara PlanteFIELDS iPDR – DCB Flight Software Solar Probe Plus FIELDS Instrument PDR DCB Flight Software Barbara Plante UC Berkeley SSL
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
D. GordonFIELDS iCDR – DCB Solar Probe Plus FIELDS Instrument CDR DCB Dorothy Gordon Space Sciences Lab, UC Berkeley 1.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y Earth Atmosphere.
P. Earle p1 November 16, 2001Electrical SNAP Electrical Design Estimates November 16, 2001 C. Paul Earle Super Nova/Acceleration Probe.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes Sept. 2008EFW INST+SOC PDR253 Data Controller Board FPGA Dorothy Gordon UC Berkeley.
TIM Phase A 1 SSL, 8/15/2007 Electric Field and Waves Instrument (EFW) Technical Interchange Meeting EFW Digital Electronics Digital Control Board (DCB)
IES Flight Software J. Hanley / P. Mokashi May 29, 2013.
1 Dec SPP-Fields Antenna Electronics Board (AEB) Concept Status Report J.W.Bonnell, S. Harris, S. Heavner Space Sciences Laboratory UC Berkeley.
Other Chapters From the text by Valvano: Introduction to Embedded Systems: Interfacing to the Freescale 9S12.
TRIO-CINEMA 1 UCB, 2/08/2010 Instrument Interface Board Dorothy Gordon CINEMA - EE Team Space Sciences Laboratory University of California, Berkeley.
1Sep 30-Oct 1, 2009EFW I-CDR Instrument Critical Design Review EFW Flight Software Peter R. Harvey 2009 Aug 31 RBSP Radiation Belt Storm Probes RBSP Radiation.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n t e g r a t e d D e s i g n C a p a b i l i t y / I n s t r u m e n t S y n t h e s i s & A.
21-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : Flight Software Peter R Harvey Mars Atmosphere.
GLAST LAT ProjectDOE/NASA Peer Review, March 19-20, 2003 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument Flight Software Flight.
TRIO-CINEMA 1 UCB, 2/08/2010 Cinema Stein Interface FPGA (CSI) [Part II] Karthik Lakshmanan CINEMA - EE Team Space Sciences Laboratory University of California,
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR217 RBSP Electric Field and Waves Instrument (EFW) Instrument.
THEMIS IDPU FSW 11/29/ UCB THEMIS IDPU FSW V4 Mission Profile Tests Peter Harvey Michael Ludlam.
C. Ingraham5-7 March 2001Data Processing Unit IFR1NCKU UCB Tohoku ISUAL Data Processing Unit (DPU) C. Ingraham.
Solar Probe Plus FIELDS RFS Peter R. Harvey Oct 25, 2013.
Flight Software Overview
GoetzPre-PDR Peer Review October 2013 FIELDS TDS FPGA Peer Review Keith Goetz University of Minnesota 1.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 12/25/20151 Flight Software Template for Instrument Critical Design Review Gary M. Heiligman.
SDR 7 Jun Associated Electronics Package (AEP) Curtis Ingraham.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
NameFIELDS iPDR – Subject Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Box Selda S. Heavner U.C. Berkeley 1.
Solar Probe Plus FIELDS Quarterly Management DCB_RFS-ADC July 18, 2013.
Status 1 Telecon MAVEN PFFSW STATUS 8/14/2012 Conf: #
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Flight Software Summary Peter Harvey Space Sciences.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB FSW Requirements Peter Harvey University of California 1.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
Timothy QuinnFIELDS SOC CDR – CTG Solar Probe Plus FIELDS SOC CDR Command, Telemetry, and Ground Support (CTG) Timothy Quinn UCB 1.
GoetzPre-PDR Peer Review October 2013 FIELDS Time Domain Sampler Peer Review Keith Goetz University of Minnesota 1.
Solar Probe Plus FIELDS MAG Peter Harvey. MAG FSW Requirements.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB Flight Software Design Peter Harvey University of California 1.
Solar Probe Plus FIELDS RFS Peter R. Harvey. RFS FSW Requirements.
11-1 MAVEN PFP ICDR May 23-25, 2011 PF Flight Software Critical Design Review May , 2011 Peter R Harvey Mars Atmosphere and Volatile EvolutioN (MAVEN)
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Environment Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
THEMIS Instrument PDR 1 UCB, October 15-16, 2003 ESA & SST (ETC) Interface Board Preliminary Design Review Robert Abiad University of California - Berkeley.
ISUAL System Design H. Heetderks. PDR 31 August 2000NCKU UCB Tohoku ISUAL System Design H. Heetderks 2 ISUAL Operations Overview.
THEMIS CDR 1 UCB, June 16, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
THEMIS Instrument CDR 1 UCB, April 20, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
Timothy Edward Quinn FIELDS iPDR – GSE Solar Probe Plus FIELDS Instrument PDR GSE Timothy Edward Quinn UCB 1.
TRIO-CINEMA C&DH- 1 KHU, 10/19/2009 Command & Data Handling System (C&DH) Peter Harvey David Curtis David McGrogan Space Sciences Laboratory University.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 647 Ground Support Equipment Will Rachelson University of.
Pre-PDR Peer Review 1 UCB MAVEN Particles and Fields Flight Software Peer Review RFAs and Recommendations Peter R. Harvey.
Solar Probe Plus – FIELDS Main Electronics Package
Operational Flight Software
Simulink Interface Layer (SIL)
Solar Probe Plus FIELDS MEP iPSR SOC Marc Pulupa April 10, 2017
Particles and Fields Package (PFP) SWEA Pre-CDR Peer Review
INSTRUMENT DATA PROCESSING UNIT (IDPU) REQUIREMENTS
Command & Data Handling
University of California - Berkeley
SP+ DFB REE 12/01/12.
ISUAL Associated Electronics Package
Solar Probe Plus FIELDS Instrument PSR - MEP Introduction
CoBo - Different Boundaries & Different Options of
CubeSat vs. Science Instrument Complexity
Presentation transcript:

Solar Probe Plus FIELDS ICU/FSW Peter R. Harvey Dorothy Gordon –ICU Will Rachelson – FSW Dec 1, 2012

Main Electronics Package (MEP) Development Interface Concept with Spacecraft Needs an ICD Internal Electrical Concept Being Revised for RFS Working on Box Mechanical Specifications Basic Concept Uses Board Slices (similar to MAVEN) Board Size Must be Common Among all Boards Mass Estimate Used THEMIS-sized Boards (6”x9”)  AEB (THEMIS) is adding floating supplies, reducing 6 to 5 channels, RB interface, 3D+  ICU (MAVEN) adding 3DPlus Flash memory, reducing SRAM, will fit in 6x9” format.  DFB (THEMIS) has to add circuitry and needs smaller A/D’s to fit. The smaller A/Ds need radiation testing (in the works at LASP). Possibly use “SideCar” chip  MAG (MAVEN) is expanding heater filtering, will fit in 6x9”.  RFS will be less than a single board, replacing 2-board HFR-TNR.  TDS (STEREO) is expected to fit in 6” x 9” footprint ICU/FSW

Instrument Control Unit (ICU) Development Intend to Use MAVEN Heritage Design (ColdFire IP) Extending Flash Memory from 8 GB to 32 GB Reducing SRAM from 3 MB to 2 MB (512KB x 32) or less Removing Interface Logic from 8 instruments to 5 MAG will Re-Use Interface Hardware and Software from MAVEN DFB will Re-Use Interface Hardware and Software from MAVEN RFS will use the MAVEN messaging protocol. TDS may use the MAVEN messaging protocol (TBD) AEB will Re-Use Interface Logic from RBSP May need to add Deployment controls Based upon MAVEN performance, CPU clock should be reduced ICU/FSW

ICU Breadboard (daughter card not shown)

Flight Software (FSW) Development FSW Development Plan is Complete SPF_FSW_001 & NHB_7150 compliant Have Code Warrior Development License, 2 Workstations at SSL Have ColdFire IP Core License Breadboard built (MAVEN design) and operating Priorities: [1] Derive Flow Down & Traceability of Requirements in SPF_FSW_002 [2] Determine DPU memory size which will set the board size [3] Determine DPU processor speed which will set the power required ICU/FSW

FIELDS FSW ORGANIZATION (DRAFT)

ICU/FSW RBSP FSW MODULES (Z80 Assy)

ICU/FSW RBSP FSW MODULES (Z80 Assy)

ICU/FSW MAVEN FSW (C code)

ICU/FSW FIELDS FSW

Program : MAVEN Processor : 16 MHz Coldfire IP, Language: C Memory : 32K PROM, 256K EEPROM, 3 MB SRAM, 8 GB Flash Requirements: 273 SLOC : ~3777 in 11 modules (Boot), in 19 modules (Op) RTS, LMs, Moments: ~5500 SLOC Test Software: 245 Scripts/Programs, more than SLOC Major Functional Requirements: – Command Reception & Distribution – 381 commands, 32 Hz execution rate – Relative Time Command Sequences – 64 4Hz processing each – Engineering Housekeeping Telemetry – 13 APIDs, 28 Tables – On-Board Limit Monitoring, Fault Response – 128 limits checked at 4 secs – Real-Time Data Collection and Telemetry – 2.4 Mbps in, up to 37 kbps telemetry – Archive Data Collection and Playback – 4 Mbps read/write concurrent – Data Compression - ~360 kbps on Real-Time and Archive Playback packets – Controllers for Six Science Instruments – 66 APIDs, 17 LUTs – High Voltage Controls – 6 HV Ramps concurrent – Attenuator Controls – 5 Actuators, 3 Automatic, All Concurrent – Fault Protection – 8 Alerts, 6 Enables, 3 Apertures, 3 HV, 3 Power Switches ICU/FSW

Program : FIELDS Processor : 8 MHz Coldfire IP, Language: C Memory : 32K PROM, 256K EEPROM, 2 MB SRAM, 32 GB Flash Requirements: tbd SLOC : tbd DATABASES: RTS, ATS, LMs, DFB, RFS Major Functional Requirements: – Command Reception & Distribution – tbd commands, 32 Hz execution rate, 6 Hz input rate – Relative Time Command Sequences – Up to 64 4Hz processing each – Engineering Housekeeping Telemetry – Up to 16 APIDs, Up to 32 Tables – On-Board Limit Monitoring, Fault Response – Up to 128 limits checked at 4 secs – Real-Time Data Collection and Telemetry – tbd Mbps peak, up to 512 kbps telemetry – Archive Data Collection and Playback – 4 Mbps read/write concurrent – Data Compression - ~360 kbps on spectra only – Controllers for Science Instruments – tbd APIDs, 1 Look Up Table – High Voltage Controls – none – Attenuator Controls – none – Fault Protection – none ICU/FSW

AEB Module Requirements: Command AEB DACs and Preamp Biasing Relays Telemeter State of AEB DACs and Preamp Biasing Relays Perform Periodic Ibias Sweeps (Rate Selectable) Modify IBIAS currents based upon either [1] solar distance or [2] Absolute time DEP Module Requirements: Command Antenna Stepper Motors Out or In to Target Length Telemeter Position for Each Antenna Store Antenna Positions in Non-Volatile Memory RFS Module Requirements: Command RFS configuration using LUT Telemeter RFS engineering data Accumulate RFS Spectra Reduce RFS Spectra in programmable frequency bands Generate Separate RFS Survey and Archive Telemetry ICU/FSW

DFB Module Requirements: Configure DFB using LUT Route Commands to DFB Send Time and Mode Selection to DFB Receive Messages from DFB Transfer CCSDS packets to Survey/Archive Compression already applied by DFB MAVEN performance < 1msec/second, 3msec when loading LUT MAG Module Requirements: Route Commands to MAG1 or MAG2 Send Time to both MAG1 and MAG2 Receive Messages from MAG1 and MAG2 Average data over 2^N samples for Survey, 2^ M samples for Archive Reduce to 8-bit delta-modulated mode when enabled and possible Transfer CCSDS packets to Survey/Archive MAVEN performance <1msec/second/MAG ICU/FSW

TDS Module Requirements: Route Commands to TDS Send Time to TDS Receive Messages from TDS Transfer CCSDS packets to Survey/Archive Compression already applied by TDS Compression applied by ICU SCI Module Requirements (for discussion): Combine “Burst” information from DFB, TDS, RFS, MAG, S/C Transmit “Burst” data back out to DFB, TDS, RFS, MAG, S/C RFS could identify peaks in spectra and provide to TDS or DFB RTS, ATS Databases Requirements (for discussion): RTS, ATS scripts 4Hz Up to 64 concurrent scripts RTS and ATS are stored in EEPROM Should we have Solar Distance based Scripts? ICU/FSW

FIELDS ICU MEMORY – SCALING BACK SRAM MAVEN

ICU/FSW FIELDS ICU EEPROM – THIS SPACE AVAILABLE!

Technical  Where do the deployment controls go? On ICU board?  Who will develop the algorithm for determining “interesting” data? Schedule  Early delivery of GSE for TDS ICU/FSW