Presentation Overview

Slides:



Advertisements
Similar presentations
Commissioning Approach Integrated Service Solutions
Advertisements

Antero Punttila Analyzing most typical energy saving measures Energy Efficiency of Steam and Condensate Systems Antero Punttila, Motiva Oy.
Energy Efficient Steam Systems
Oil and Gas Industry Presentation Activities, GHG Emission Sources, and Potential Reductions January 14, 2009.
Process Units.
In India 65% of total power is generated by the Thermal Power Stations. Main parts of the plant are 1. CHP.
Gas Processing Methods
KHABAROVSK REFINERY HYDROPROCESSING PROJECT TROUBLESHOOTING APRIL 29th – MAY 3rd 2013, MADRID, SPAIN TRAINING COURSE.
State of the Art Combustion Equipment for Emissions and Energy Reduction November 2009.
Thermal Power Station Plant. Introduction 150 MW Thermal power station plant, produce 450t/hr steam at full load The max steam pressure is 150 bar with.
ITK-233 Termodinamika Teknik Kimia I
Please click on our logo or any link in this presentation to be redirected to our website & . Thank You! 17A Marlen Drive  H amilton, NJ 
HYDROPROCESSING PROJECT ARU / SWS – CONTROL SYSTEM and ESD
MANUFACTURING PROCESS
SPENT CAUSTIC TREATMENT OPTIONS Hadi M. Al-Daghman, 2014
Power Plant Construction and QA/QC Section 2.4– Boiler Auxiliaries
Vapor and Combined Power Cycles
Objectives: Understand importance of utility and maintenance system in industry/plant.
Group Meeting #1 January 29 th, 2013 Michael Bentel Jeremy David Erik Peterson Arpit Shah 1.
Pharos University جامعه فاروس Faculty of Engineering كلية الهندسة Petrochemical Department قسم البتروكيماويات PE 330 ENERGY CONSERVATION LECTURE (9) ENERGY.
Advanced Biomass-based Combined Heat and Power System Combined Heat & Power in the Pacific Northwest October 15, 2002 Nathan E. Carpenter Manager, Energy.
Steam Power Plant.
Acid Gas Removal Options for Minimizing Methane Emissions Lessons Learned from Natural Gas STAR Processors Technology Transfer Workshop Gas Processors.
1 Acetone, 2-Propanol H 2 Acetone 2-Propanol L2 Acetone, 2-Propanol L201 L101L1 L3 L4 L10 L9 Condenser Reboiler Distillation Column Endothermic Reactor.
HDS-1 Low Sulfur Gasoline Project
The international pipeline contractor for landmark project JCV/vs rev 0 1 IPLOCA 2008 Environment Award.
Chris, Stephanie, Kyle, Mariam
Lesson 7 Steam Power Plant.
Defining the Upstream Oil and Gas Sector: Exploration, Production, and Natural Gas Gathering and Processing Western Climate Initiative – Oil & Gas Collaborative.
Oxy Enrich Process for Capacity Enhancement of Claus Based
HYDROPROCESSING PROJECT PROCESS DESCRIPTION
Canada Chemical Corporation 24, Street S.E. Calgary, Alberta, Canada T2B 2X3 (403) , Conrad Ayasse, Ph.D., FCIC,
Emerging Technology Acid Gas Removal
Evaluation of performance of various alkanolamines for CO 2 capture from a pulverized coal-fired power plant Sumedh Warudkar PhD Candidate Chemical and.
KHABAROVSK REFINERY HYDROPROCESSING PROJECT BASIS OF DESIGN APRIL 29th – MAY 3rd 2013, MADRID, SPAIN TRAINING COURSE.
Gas Turbine Power Plant
Multi-Stage Flash Desalination (MSF)
Process Overview After a gas well is completed the gas is typically drawn from the well via a self containing portable skid containing a driver, compressor.
1 MHI's Commercial Post Combustion CO2 Capture Experiences in a Carbon Constrained World Ronald Mitchell Mitsubishi Heavy Industries, Ltd. International.
Miscellaneous Organic NESHAP Compliance for a New Countermeasure Flare Production Facility at the Milan Army Ammunition Plant FRANKLIN engineering group,
KHABAROVSK REFINERY HYDROPROCESSING PROJECT TEST RUN APRIL 29th – MAY 3rd 2013, MADRID, SPAIN TRAINING COURSE.
KHABAROVSK REFINERY HYDROPROCESSING PROJECT NORMAL OPERATION APRIL 29th – MAY 3rd 2013, MADRID, SPAIN TRAINING COURSE.
Corrosion Control on Amine Plants: New Compact Unit Design for High Loadings Michel BONIS, Total Jean KITTEL, IFP Gauthier PERDU, Prosernat Good afternoon.
Plant Utility System (TKK-2210) 14/15 Semester 4 Instructor: Rama Oktavian Office Hr.: M-F
Objectives -Discuss Final Project -
Ansaldo Ricerche S.p.A. Carbon Dioxide capture Berlin, March 2008.
Lecture Objectives: Finish with absorption cooling Power generation Rankine cycles Connect power generation with heating and cooling –CHP –CCHP.
STEAM POWER PLANTS.
Hazrul Adzfar Bin Shabri Nur Irdani Idris Siti Norlaila Faeizah Binti Mohd Rudin CPB PLANT UTILITIES AND MAINTENANCE.
A seminar on Practical Training taken at KOTA SUPER THERMAL POWER STATION.
HYDROPROCESSING PROJECT PROCESS THEORY
Training Presentation On Suratgarh Super Thermal Power Station (Raj)
Presentation on Steam Power Plants R.C.Chaturvedi
Novel Post Combustion CO2 Capture (PCC) Process - MU Static Spiral Perforated Wings (MU-SSPW) Mixing Element - December 11, 2015 Mu Company Ltd. & K-Coal.
HEAT-GENERATING EQUIPMENT INTRODUCTION SELECTION EFFICIENCY FURNACES BOILERS CENTRAL HVAC SYSTEMS.
NAME :- ARUP RAY CLASS :- B.CHE (IV) ROLL : SEC :- A1
Lesson 7 Steam Power Plant.
By Mohamed Elfeki, September 2000, Saxion University, the Netherlands
HOSTED BY: SUPPORTED BY:.
SPE Introduction to Exploration and Production :
Natural Gas Production Chapter 6 Misc. Gas Conditioning
TUGAS K3 DALAM INDUSTRI KIMIA
In the name of Allah, The most Merciful & Beneficent.
Simulation Of Gas Sweetening Process
Boilers & Thermic Fluid Heaters
Crude oil Treatment process
carbon capture and storage (CCS)
Crude oil Treatment process
Saskatchewan Measurement Directive PNG017 DRAFT CHANGES
Lecture Objectives: Finish with Sorption cooling
Presentation transcript:

New Upstream Gas Treating Facilities To Maintain LNG Production Plateau

Presentation Overview Introduction Offshore Facilities Description Onshore Facilities Description Onshore Facilities Study and FEED Project Status Conclusion

Introduction The Qatargas 1 LNG facility is divided into two sections: Upstream facilities (offshore facilities, onshore receiving and condensate loading facilities). Downstream facilities (LNG Plants). There are now 4 Qatargas LNG ventures and this project relates only to Qatargas 1. Qatargas 1 shareholders are; Qatar Petroleum (QP), Total, ExxonMobil, Marubeni and Mitsui. LNG Trains 1 & 2 started in 1996 and Train 3 in 1998, The LNG plant also produces condensate and sulfur.

Offshore Facilities Reservoir: North Field (Khuff) reserve > 900 TSCF 2 production platforms accommodate 3 Trains 1 Living Quarter platform 3 Wellhead platforms with a total of 20 wells & 1 Flare platform.

Offshore Facilities To maintain the present LNG production plateau, it requires drilling 4 new wells and re-completion 2 existing wells. The new wells have higher H2S content and it will result in 2.0 % mol of H2S in the combined feed gas to onshore Drilling of new wells are implemented in 2007 and 2011.

Onshore Facilities Existing Facilities: LNG Train 2 LNG Train 1 LNG Train 3 Existing Facilities: 3 LNG Trains, 2 Acid Gas Enrichment Units, 2 Sulfur Recovery Units. 4 LNG storage tanks and utilities.

Onshore Facilities Study A Study was conducted to determine the impact of increasing H2S in the feed from its original design of 0.8 % mol to 2.0 % mole. Two approaches were studied: 1- Revamp existing AGRU by adding pre-Absorbers. 2- Avoid revamping existing AGRU, provide Pretreatment Acid Gas Removal Unit (PAGRU) as a new unit. Approach 2 was selected based on safety, construction, cost, schedule and plot plan utilization.

Onshore Facilities Study (approach 2) Existing Facilities AGE 1 SRU 1 Sulfur Acid Gas AGE 2 SRU 2 Sulfur Feed Gas From Slug Catcher AGR 1 AGR 2 AGR 3 Lique. 1 Lique. 2 Lique. 3 620 MMscfd 0.7 % H2S 2.3 % CO2 LNG 1720 MMscfd 2.07 % H2S 3.30 % CO2 0.06 % H2S 1.8 % CO2 Acid Gas Sulfur 880 t/d AGR 4 SRU 4 1100 MMscfd PAGRU : Solid line denotes new facilities

Onshore Facilities Study – Process Selection The objective is to select the most suitable process for the new AGRU in terms of technology, experience, and process guarantee. Other criteria are selectivity in removing H2S from 2.07 % mol to 600 ppm mol and removing CO2 from 3.3 % mol to 1.8 % mol. Also, selective H2S removal from tail gas from new SRU to have H2S < 250 ppmV in treated tail gas. One third of feed gas will bypass the PAGRU. Treated gas from PAGRU is mixed with one third of raw feed gas. The recombined gas stream will contain 0.8 % H2S and 2.3 % mol CO2 (same level as current feed gas quality). Four process Licensors were evaluated. Process scheme proposed by Prosernat met the above objectives, criteria and minimum solvent circulation rates.

Onshore Facilities Study – Process Selection Qatargas selected the AdvAmine™ MDEAmax process, developed by Total and licensed by Prosernat for the Acid Gas Removal Unit. KTI technology was used for the new Sulfur Recovery Unit and Tail Gas Treatment Unit. New SRU require H2S in acid gas of 54 % (min.) and also minimal aromatics present in the acid gas. Prosernat proposed modified process configuration (hot pre-flash low BTX scheme) consist of: High Pressure Absorption Section Hot Pre-Flash Column Tail Gas Absorption Section Amine/MDEA Regeneration Section

New Acid Gas Removal Unit - FEED PAGRU Process Scheme with Hot Pre-Flash low BTX Configuration

New Acid Gas Removal Unit - FEED PAGRU Process Scheme with Hot Pre-Flash low BTX Configuration

New Acid Gas Removal Unit - FFED PAGRU Process Scheme with Hot Pre-Flash low BTX Configuration

New Acid Gas Removal Unit - FEED PAGRU Process Scheme with Hot Pre-Flash low BTX Configuration

New Sulfur Recovery Unit - FEED The Sulfur Recovery and Tail Gas Treatment Unit Consist of: Claus Section Tail Gas Treatment Section Thermal Incinerator Section Liquid Sulfur Degassing Section Sour Water Stripper (SWS)

New Sulfur Recovery Unit - FEED Rich Amine to AGR 4 LP Flash Gas from AGR 4 Lean Amine from AGR 4 CLAUS Tail Gas Acid Gas from AGR 4 CLAUS SRU 4 TGT SRU 4 Sour Water SWS SRU 4 Stripped Water To Neutralization Facilities TGT By-Pass Liquid Sulfur TGT Tail Gas SULFUR DEGASSING SRU 4 Flue Gas To ATM Vent Gas INCINERATOR SRU 4 Liquid Sulfur To Storage Tanks

New Sulfur Recovery Unit – CLAUS Section Claus Reactors Feedstock Pre-heating Main Combustion Chamber 1st CLAUS REACTOR 2nd CLAUS REACTOR COMB. AIR FIRED HEATER 1st STEAM REHEATER 2nd STEAM REHEATER COMB. AIR CLAUS TAIL GAS COMB. AIR PREHEATER FUEL GAS 1st SULFUR CONDENSER 2nd SULFUR CONDENSER 3rd SULFUR CONDENSER CLAUS BURNER THERMAL REACTOR WASTE HEAT BOILER SULFUR SULFUR SULFUR ACID GAS ACID GAS PREHEATER Sulfur Condensers

Project Status FEED work will complete in September 2008 Engineering Procurement Construction (EPC) will be developed after Contractor selection Project completion date in the first half of 2012 Long Lead Items (LLI) procurement will be initiated 4 months prior to EPC award.

Conclusion The installation of pretreatment acid gas removal unit and related sulfur unit will  limit the H2S content in feed gas to the existing trains at the current levels (approx 0.8 % mol). This will enable Qatargas to  continue to saturate the  LNG plant capacity and maintain its current  LNG production  rates  plateau.