Energy Portfolio Committee Public Hearings on Cogeneration of Electricity 25 July 2013 K.M. Nassiep CEO-SANEDI General Introduction to Cogeneration (Context.

Slides:



Advertisements
Similar presentations
Leaders in the design, implementation and operation of markets for electricity, gas and water. Portfolio Generation Investment Under Uncertainty Michael.
Advertisements

Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
Key Issues: Plenary Sessions
Energy for a low-carbon economy 11 November 2010 Presentation by Ernst Venter Executive General Manager Business Growth.
Bent Ole Gram Mortensen Legal framework as a core element of district cooling success – the case of Denmark HE 2014, Wuhan.
KZN Pre-COP17 Summit – Climate Change Finance0 KZN Pre-COP17 Summit Inkosi Albert Luthuli ICC, Durban 26 September 2011.
Donors’ Conference on Sustainable Energy for Kosovo
RENEWABLE ENERGY FEED – IN TARIFF REGULATORY GUIDELINES Waste-to-Energy Seminar 17 July 2009 Cape Town By Bianka Belinska.
Tenth Annual Midwest Energy Conference March 7, 2007 How Best Satisfy Midwest Electric Load Growth? Thomas R. Casten Chairman Recycled Energy Development.
11 Energy Policy in Denmark MONGOLIAN ENERGY DELEGATION 9 September 2013 Danish Energy Agency.
Black Business Council 7 June South African partner : 40 % 2. Local content, job creation & BEE: 30 % 3. Contribution towards local community.
Darden School Social Responsibility and Entrepreneurship April 2, 2007 Recycling Energy: Profitably Mitigating Climate Change Tom Casten Chair, Recycled.
Environmental Sustainability in the Extractive Industry: The Case for Climate Change Mitigation Dr Uwem E. Ite.
THE DEVELOPMENT OF THE BRONKHORSTSPRUIT BIOGAS PROJECT
Encouraging Green Power: Cooperation between the Private Sector and Government Avi Brenmiller, May
Green investment scheme and climate change mitigation policy in Ukraine Stavchuk Iryna Climate change program coordinator National ecological centre of.
Marek Kras. A combined cycle gas turbine power plant, frequently identified by CCGT shortcut, is essentially an electrical power plant in which a gas.
Special Report on Renewable Energy Sources and Climate Change Mitigation IPCC WORKING GROUP 3.
1 Renewable Energy Options for the Indian Railways Amit Kumar TERI, New Delhi December 21, 2011.
Euroheat & Power Why is there not more combined heat and power?
Africa Energy Challenges and Opportunities By Atef Marzouk Energy, Senior Policy Officer Department of Infrastructure and Energy African Union Commission.
Rory McIlmoil, Downstream Strategies. Introduction to distributed energy The case for distributed renewable energy Opportunities for developing distributed.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
Energy Policy Levers. 2 State as a Taxing Authority Income tax credits or deductions Income tax credits or deductions Residential Alternative Energy Tax.
Regulatory Flexibility Committee Competitive Procurement September 18 th Joe Kerecman Director Government and Regulatory Affairs
ENHANCING THE POLICY FRAMEWORK FOR SUSTAINABLE ENERGY INVESTMENT Guidance from the OECD to developing and emerging economies Karim Dahou, Investment Division,
Biomass “Struggling to make it work”- the Canadian Experience IEA Task 38 Meeting Doug Bradley- Domtar Edinburgh, Nov 12, 2001.
Discussion of Feed-in Tariff Pilot Programs September 18, 2013 Presentation to the Regulatory Flexibility Committee of the Indiana General Assembly 1.
An electricity strategy for South Africa Hein Reyneke Country Manager, South Africa October 2014 PCTI/ /CoB/MRP/79.
Experiences as a ER buyer and a general outlook Olle Björk Swedish Ministry of Sustainable Development Washington
Co- and Poly- generation Martin Hannemann Andi Prah Nuri Feichtinger Paul Polterauer.
Energy Efficiency – The First Fuel The Danish Experience Jiangsu - May 21st 2015 Counsellor Christian van Maarschalkerweerd – Embassy of Denmark.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 9 Renewable Energy Module 9: REGULATORY MEASURES AND POLICY OPTIONS TO ENCOURAGE DEVELOPMENT.
Energy situation & Energy policies in South Africa Presented by: Thembani Bukula.
GE Energy Financial Services Policy Options Shaping Private Investments in Clean Tech Kevin Walsh Managing Director, Power & Renewables May 1, 2009.
How to deliver a Renewable Energy Project Jemma Benson CO2Sense Yorkshire.
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
And the Technologies to use it. Tina Kaarsberg, PhD House Science Committee, Energy Subcommittee For For Producing Energy:
1 Distributed Energy Resources: Bringing Energy Closer to Home Presentation by the Industry Task Force on Distributed Generation July 28, 2005.
Key Industry Challenges Regulatory Perspective Michael G. Tutty Chairman Commission for Energy Regulation 13 October
1 Click to edit Master subtitle style 5/24/12, Version Control South African Electricity Supply Sector ISMO Bill Independent System and Market Operator.
ENERGY INTENSIVE USERS GROUP Ian Langridge Chairman January 2010 Eskom’s Revenue Application for Multi Year Price Determination MYPD (2)
RDL Utility Based Financial Incentives for Renewable Energy & Energy Efficiency in New Zealand EGNRET Workshop Honolulu, Hawaii, USA 30 March – 1 April,
Submission on the cogeneration of electricity 25 July 2013.
BI Marketing Analyst input into report marketing Report TitleElectricity in California Report Subtitle State profile of power sector, market trends and.
Intermediation of Small-Scale Carbon-Financed Clean Infrastructure Projects – The Development Bank of Southern Africa’s Experience and Prospects Rob.
SMART ELECTRICITY Planning and building a modern infrastructure for South Africa SMART Electricity Planning a healthy, modern, affordable electricity supply.
Combined Heat and Power Workshop Report and Next Steps Power Committee Briefing 7/15/03.
15 November 2011 Response to NCCRWP EKC 1 Response to the NATIONAL CLIMATE CHANGE RESPONSE WHITE PAPER 2011 Presented to The Portfolio Committee on Water.
Weyerhaeuser CHP Project NWPPC CHP Roundtable June 24, 2003.
1 Cogeneration in the Forest Products Industry January 2008 by Phil Zirngibl.
11/4/02 NW Energy Coalition Clean Electricity Options for the Pacific Northwest: An Assessment of Efficiency and Renewable Potentials through the year.
Presentation to Select Committee on Economic Development
Legal, Regulatory and Financial Incentive Framework to Support Landfill Gas Power Generation Project Development Presented by Leiping Wang Senior Energy.
An embedded cogenerators response Andrew Carr
SHP – Columbia University
BI Marketing Analyst input into report marketing Report TitleElectricity in Namibia Report Subtitle Country profile of power sector, market trends and.
Proposed framework for charges for generators connected to the Distribution network Please note that the contents of this presentation are proposals at.
A Presentation to the: Portfolio Committee on Minerals and Energy (30 August 2001) Given by: Barry Bredenkamp Bonesa Electricity (Pty) Ltd Efficient Lighting.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
BIDDER’S CONFERENCE: Eskom Grid Connection Process and related matters Date: 16 August 2012.
Here Renewable Energy Independent Power Producer Programme Bidder’s Conference 16 August 2012 Andrew Etzinger Senior General Manager Eskom.
Energy and Environmental Policy Renewable Energy: Wind Presented by: Adam Smith Damien Hammond Veera Kondapi Jeff Gruppo.
Heat Network Demonstration SBRI: policy context & objectives for the competition Natalie Miles Heat Strategy and Policy (Heat Networks)
The Role of TSO. Madrid, 7-8 Feb The Role of TSO2 The roles of industry players First vision of role of TSO in GTE position paper Industry players.
Clean Power Purchasing Meeting April 24, H OW S UPPLY D E - CARBONIZATION F ITS I N City Deep Decarbonization Goals Electricity and Combustion Emissions.
MELBOURNE RENEWABLE ENERGY PROJECT
DRAFT IRP Public Hearings Presented by Sisa Njikelana
Integrated Resource Plan 1
MELBOURNE RENEWABLE ENERGY PROJECT
Presentation transcript:

Energy Portfolio Committee Public Hearings on Cogeneration of Electricity 25 July 2013 K.M. Nassiep CEO-SANEDI General Introduction to Cogeneration (Context and Clarification)

SANEDI The National Energy Act, 2008 (Act No. 34 of 2008), Section 7 (2) provides for SANEDI to direct, monitor and conduct energy research and development, as well as undertake measures to promote energy efficiency throughout the economy. mandate The South African National Energy Development Institute The South African National Energy Development Institute 2

(1) What is cogeneration ? (1) International Definition “where a fuel source (eg. gas, biomass), produces energy (electricity), at the same time as producing thermal energy (heat), in one process”. Cogeneration = COGEN = CHP, (Combined Heat & Power)

(2) What is cogeneration ? (2) International Definition, (interpreted) 58 %. Should not be confused with Waste Heat Recovery technology, with an efficiency of approximately 58 %. trigeneration. Production of cooling is also possible under CHCP = trigeneration. to 90%, (vs 35% COGEN will achieve an overall efficiency up to 90%, (vs 35% of a conventional coal power plant). Typically generated on-site at industries, or off-site for district heating (cold climates) and/ or district cooling, (hot climates) and needs a fuel source that may be procured separately, eg. piped gas or available on- site, eg. bagasse at sugar mills, which has some value, (can be fossil- based or renewable)!

Cogeneration, in the SA context?  NERSA’s COFIT originally included the concept of cogeneration, including industrial biomass, waste heat and waste fuels.  DOE reinforced this by excluding all Cogen (even from renewable fuels), from the RE-IPP programme. Any industrial onsite power generation, such as waste heat/ energy/ fuel recovery, to produce power (bottom cycling cogeneration), is regarded as cogeneration. This can and should be considered clean (renewable) energy, but is more in line with the generally accepted definition/s for Energy Efficiency.

SA COGEN-type Opportunities Presentations to follow by industry sectors, will probably cover : a)On-site fuel used to generate power and heat – eg. fuel mainly produced from waste, such as Sugar, Pulp & Paper & the Food Processing industries, etc., ca 1500 MW potential; a)Purchase of fuel such as natural gas, biomass or even coal, to produce power and heat (and sometimes cooling: trigen), with very high potential! and requirements –These have different features and requirements for investment. All have an improved efficiency (to ca %), as compared to stand-alone Eskom or other IPP condensing power, (ca 35 %)!

Common Features of COGEN Far higher energy efficiency (up to 90%), than standalone Eskom, or other IPP condensing generation ( %), with:- –lower greenhouse gas emissions; and –lower water usage. Grid connection infrastructure (transmission,) already in place. Generally far quicker implementation than green fields projects. Higher load factors (typically 80 to 85%), as opposed to base load power generation. No (or little) physical export (wheeling) of the power and hence no or low transmission and distribution losses. Reliant on host operating fuel and/or heat/steam off-take. Private sector will generally own and fund at a lower cost to consumers, (at a lower cost than other renewable energy solutions).

Why has there been little movement in SA? South Africa has great potential for COGEN, which is the most efficient form of heat -associated power generation. Why has very little happened – as compared to most other industrially developed nations?  No mechanism to incentivise industry, to make significant capital investment that is typically repaid over ca years;  Difficulties (lack of clarity,) regarding grid access;  An ‘off-taker’ is required for any plant that goes into export;  There is no clear national long-term programme to procure cogeneration;  NERSA will not grant a COGEN license, unless it is part of IRP 2010 (although the IRP 2010 doesn’t explicitly recognise cogeneration), which then needs special DoE Ministerial permission for a Generating Licence;  Government has not made the regulatory environment ‘wheeling-friendly’;  Eskom’s charges for use of the networks for wheeling are far too high;  NERSA have not dealt with the issues around ‘wheeling rules’; and  No standard approach exists, to deal with ‘wheeling’ power though municipalities!

What should make COGEN work in SA ? Looming power shortages and the shorter implementation period for COGEN. Eskom historically has NOT been supportive, as COGEN competes with their generation capacity/ pricing. Recent establishment of the Independent Power Producer (IPP) office is focussing on 20 year Power Purchase Agreements (PPAs), with all available supply having to be ‘sold’ to the Independent System Market Operator (ISMO):- – for guaranteed power is not preferred, as cogen linked to host operation cycles; –for delivered power like wind, solar has risks (& increases costs), as cogen plant may at times not operate; and –In any case, all or most power, will be used onsite to reduce grid demand!

What should make COGEN work in SA, cont’d ? Special Purpose Vehicle (SPV) projects prefer some form of capacity payment for availability of power (to cover fixed costs), and separately, for variable power delivered; Hosts can independently fund the investment, through ‘on balance sheet’ financing; IDM (Capital Grant), has been effective and offers a much lower cost (42 c/kWh for 3 years), but has dropped as NERSA MYPD 3 assumes that Cogen will simply happen! It has not and will only happen ‘naturally’ when power prices are at peak, with the alternative option of industry shutting down operations, as power is a major cost in most cases, leading to loss of economic value-add, beneficiation, jobs etc.. Finance and cash flows need more money upfront and then support can eventually be phased out, over time.

Recommendations Broadly speaking, two clear enablers are needed : Procurement Programmes - Power Purchase Agreements (PPAs), and/ or Capital Incentives eg, Tax Incentives for Cogeneration Projects. General Areas to Consider: 1.Fixed capital grant as was done by Eskom-IDM office to accelerate investment at a low cost to SA, for embedded generation – REINSTATEMENT; 2.Fast tracking of PPA’s through the IPP office (recent RFR/I), to get projects to financial close asap, (before June 2014) – IN PROCESS; 3.Sector-based, standard PPA’s to enable sectors to have clarity and certainty of medium-to-long term policy direction and supporting regulations, to develop projects - LINK TO IRP & PLAN FOR COGEN; and Deal with the stumbling blocks identified, that are stopping good (low-cost, efficient, quick), projects, by providing certain, clear, timely & simple/ user-friendly guidelines, (especially for small projects/ companies, such as biogas from waste) – ideally upfront!