Thanks to all the presenters who made this an excellent meeting 1 Meeting Summary CFS-ADI Tokyo 2014 Mike Harrison.

Slides:



Advertisements
Similar presentations
Kitakami IR Access Discussions T. Markiewicz/SLAC 13 May 2014 SiD Meeting / AWLC Fermilab.
Advertisements

Nov. 19, 2008 ILC08 Global Design Effort 1 Status Report Alternative Siting and Tunnel Design Tom Lackowski.
Homework of HLRF 1 Shigeki Fukuda KEK 2012/4/23 HLRF Homework1 in KILC12 (Fukuda) 1.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas Tunnel Life Safety and Egress Accelerator.
CFS near term & Required ADI input CFS near term & Required ADI input 6-12 month activities, required ADI information 10. AUG 2014CFS-ADI Joint Meeting1.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
ILC Status Report Mike Harrison AWLC14 1 AWLC14 Fermilab May 2014 Mike Harrison.
Construction and Installation of the CLIC Experimental Area
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
ILC CFS / CLIC CES Studies for the Interaction Region : - An action was given at the Geneva Linear Collider Meeting for CFS to develop a more in-depth.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
Global Design Effort - CFS SiD Collaboration Meeting - SLAC 1 VERTICAL ACCESS ILC IR LAYOUT for SiD and ILD CONVENTIONAL FACILITIES AND SITING.
LCWS14 - Belgrade October 6-10, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, M Miyahara, J Osborne.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
LINEAR COLLIDER COLLABORATION Designing the world’s next great particle accelerator Detector Hall Configuration Overview New baseline (Hybrid A’) proposed.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas CFS AD&I Status Report Conventional.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
TILC08 - WG1 Summary Global Design Effort 1 TILC08 仙台 GDE 会議 WG-1 活動報告 GDE 活動報告会 3月11日10:00- 3号館7階会議室 設楽
More than an idea not yet a project 1 Meeting Issues & Goals CFS-ADI Tokyo 2014 Mike Harrison.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
Report from ILC CFS and Cryogenics Workshop
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
Global Design Effort - CFS ILC10 Beijing, March, Single-Tunnel Accelerator Configuration Of Asian Region Atsushi Enomoto (KEK)
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Conventional Construction Working Group Meeting Tom Lackowski L2 Conventional Facilities Mu2e Working Group.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Thickness of the Kamaboko Tunnel Shield Wall under Different Assumptions Ewan Paterson ADI Meeting July 2, ADI Meeting Ewan Paterson 7/2/15.
Assembly scenario of ILD Si trackers 2015/4/21 Yasuhiro 1.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
CFS-ADI Joint Meeting University of Tokyo April 8-10, 2014 Session 8 - Power Usage and Site Requirements V Kuchler, A Enomoto.
Summary: Site Discussion Jonathan Dorfan SLAC Plenary Session, June 6, 2008.
Global Design Effort Working Groups A & C Parallel Session Summary IRENG07 A. Herve, T. Markiewicz, T. Sanuki, Y. Sugimoto V. Kuchler, A. Enomoto, J. Osborne.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
The categories for ILC budget planning are: R&D – work done in laboratories to develop and verify subsystem components. This supports the cost reduction.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
An idea of ILD general assembly plan 2015/10/8 Yasuhiro Integration Meeting 1.
Experimental Hall in Mountain Regions
Installation Global System
CLIC Civil Engineering Update
Introduction and Meeting Objectives
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Marco Oriunno (SLAC), March 12, 2014 MDI WG
Summary of WG2 :CFS for staging
Current Site Status at IP Preliminary survey of campus
ILC GLOBAL SYSTEMS MEETING
CLIC Civil Engineering Update
Change Request Panel report
Central Region Working Group
Barry Barish Paris ICHEP 24-July-10
Presentation transcript:

Thanks to all the presenters who made this an excellent meeting 1 Meeting Summary CFS-ADI Tokyo 2014 Mike Harrison

Pre-Construction 2 Pre-project scope of work – Masanobu Miyahara The CFS pre-project work scope will determine the readiness for a construction project hence we need to understand the elements of the work scope and their individual schedules. Can any items be delayed with compromising the effort ? Can the 5-year estimate for this work be shortened in any way ? Since non trivial funding will be needed to complete this work then this implies some kind of budget before the anticipated GO-NOGO decision in How much money is needed and when, if we try and minimise a pre-project request Three basic phases, basic planning, schematic design, and detailed design. – Need a price breakdown of the various pre-construction elements – Vic Who provides oversight for this – the KEK project office ? The project controls the design work but not the land acquisition, environmental assessment etc…. An environmental assessment is not legally required for the ILC – Masanobu Need a scope & budget proposal for the LCB in July then MEXT (Japanese or English ?) How to proceed on the campus ? Cannot shorten the 5 year period much. CFS-ADI Tokyo 2014 Mike Harrison

Accelerator Systems 3 Issues pertaining to CFS for each system – Nick Walker Discussion There remains” loose ends” in several systems in regard to CFS requirements. Ascertaining these issues will help determine the systems groups work scope and remaining CFS uncertainty. Electrical loads are erratic in quality, documentation is lacking in certain areas. Are they good enough for now ? Lattice files needed for “conventional” positron source and 10 Hz operation. Guaranteed energy – how do we implement this The BDS is probably the most critical area man-years needed for the next few years. What is the primary deliverable for the LCC phase (site dependant design ?) - Nick CFS-ADI Tokyo 2014 Mike Harrison

Tunnel & below ground 4 Cryomodule & Waveguide installation, LHe inventory control, Radiation shielding, Safety - Tomoyuki Sanuki & Masanobu Miyahara Discussion This session will examine issues related to the tunnel and access-tunnel X-sections and input penetration layout. Is the generic tunnel layout including accessibility and safety now stable ? There is no estimate for worst case radiation accident scenario Concrete shielding thickness looks conservative – does one save money by reducing the tunnel size by 1 m. The concept of cryogenic refrigerators underground (thus the penetration buildings) needs to be reviewed. Questions raised about air flow, power outage conditions. Request CERN help for a cryogenic system review. Power distribution waveguide system preinstalled on the cryomodules. Need a vertical shaft for each access hall (safety), ground water disposal from the access hall. Tunnel layout is stable from installation & layout, not stable from safety and ground water – Tomo. CFS-ADI Tokyo 2014 Mike Harrison

Interaction Region design 5 Detector Requirements both SiD and ILD minimum needs – Karsten Buesser Discussion Do we understand the Detector design well enough to determine the CFS Detector Hall requirements ? Is there risk that significant Detector changes could still remain ? Can we identify the major technical cost drivers arising from the Detectors in terms of the CFS, including comparisons of effects with vertical shaft and horizontal access? Detector assembly models are not finally determined – what is the role of the central lab complex The various arguments are not cut and dried, surface preassembly helps to decouple CFS from the detector critical path. In the end the site will dictate - Karsten 7% slope is a lot. If required either detector can live with either approach. The detector design could/would reflect the access method. Commissioning scenarios with and w/o the detectors in place are not well developed. Heavy lifting device ~4M CHF from John Osbourne Arup Detector anaiysis soon CFS-ADI Tokyo 2014 Mike Harrison

IR Concepts 6 Interaction Region Solutions including Hybrid, Detector Hall impact on Overall Construction schedule – Yoshinobu Nishimoto ARUP Study Status – John Osborne Discussion Can we conclude the horizontal – vertical access debate ( at least conceptually) ? Hybrid model – positives/negatives. When do we need to resolve this ? What needs to be done in the near term to facilitate this decision ? All hybrid designs have some form of vertical shaft All solutions meet the basic experimental requirements Baseline has a 60 month timeline – beneficial occupancy ~ 48 months – detectors in 11.5 years. Hybrid A is 48 months, hybrid B is 60 months, hybrid C is 60 months. Need to evaluate the heavy lowering cost Need to have at least one borehole to confirm geology at the IP – can we get Iwate to do it ? Baseline & Hybrid A – general agreement. CFS-ADI Tokyo 2014 Mike Harrison

Energy Staging 7 General Scheme, parameters, CFS impact – Benno List Discussion The proposal to implement the project in stages has implications for the CFS approach and scope. What are these features (transfer lines, cryogenics, installation, storage, test facilities ……) ? There may be a request for energies in excess of 500 GeV as part of the project baseline. How do we approach this ? The concept of installing the 500 Gev infrastructure is correct. Cryomodule storage requirements are actually reduced Energy overhead needs additional consideration (2.5 Gev quantisation step) Need to look at the optimal way to implement the sparse infrastructure. Longer undulator rather than 10 Hz for positron operation Option C is the preferred. CFS-ADI Tokyo 2014 Mike Harrison

Site Issues 8 Power Usage, Site requirements (water etc..) Vic Kuchler & Atsuchi Enomoto Energy Issues – Marc Ross (Alt., Ewan Paterson) Discussion Further information will be required soon on the outside-the-TDR site needs (power, water, roads etc….). How well do we know these requirements ? Are there any significant energy efficiency opportunities ? Power reduction on demand ? Scope for the ILC laboratory power estimates (10 MW) looks low. Water & sanitary, roads is not really understood yet. The ILC laboratory is not well defined. This is a mess ! Energy efficiency is a complicated issue, but there does not look as though there is any “magic bullet” i.e. a factor of 2 anywhere CFS-ADI Tokyo 2014 Mike Harrison

Can we back-end load the pre-project CFS activities to reduce funding needs pre-2016 without impacting the schedule ? Can we determine the ADI requirements for the next 2-to-3 years which at a minimum provides the necessary information for the CFS work? 12 months ? Can we agree on the optimal energy phasing implementation scheme Can we agree on the preferred IP concept Are the tunnel X-section & penetrations OK How do the lab/campus facilities interact with the project – equipment testing, engineering support, equipment staging and storage, offices, power & water infrastructure, etc… Any significant site-specific impact to the TDR design Cost vulnerability – can we identify any potential significant cost risk hidden in the post-TDR environment ? 9 Goals & Questions CFS-ADI Tokyo 2014 Mike Harrison

Can we back-end load the pre-project CFS activities to reduce funding needs pre-2016 without impacting the schedule ? It appears to me at least the our ability to make significant changes to the 5-year plan is limited – thus we should move to the next step of preparing a funding request for MEXT (Via the LCB) 10 Goals & Questions CFS-ADI Tokyo 2014 Mike Harrison

Can we determine the ADI requirements for the next 2-to-3 years which at a minimum provides the necessary information for the CFS work? 12 months ? I think Masanobu first talk showed the framework for these activities. I think we need to digest it first but my impression is that it’s essentially all there 11 Goals & Questions CFS-ADI Tokyo 2014 Mike Harrison

Can we agree on the optimal energy phasing implementation scheme ? Yes – scenario C 12 Goals & Questions CFS-ADI Tokyo 2014 Mike Harrison

Can we agree on the preferred IP concept ? Here the situation gets a little more interesting. Anything beyond the baseline involves a vertical shaft of some kind. There seems to be a concensus for scenario A as the preferred option. We need a better cost estimate but superficially the cost is similar to the baseline. How would both detectors use this layout ? We will select Hybrid A as the concept to move forward with, as well as the baseline. 13 Goals & Questions CFS-ADI Tokyo 2014 Mike Harrison

Are the tunnel X-section & penetrations OK ? Wall thickness looks to big – we need to determine what constitutes a maximum credible accident. An 18 MW fault condition appears not viable to me. – Safety review Cryogenics system also needs a (safety) review – by CERN ? Tunnel stable from installation and infrastructure perspective 14 Goals & Questions CFS-ADI Tokyo 2014 Mike Harrison

How do the lab/campus facilities interact with the project – equipment testing, engineering support, equipment staging and storage, offices, power & water infrastructure, etc… Other than some generic arm waving estimates we have little meaningful information here. We need to decide on the perceived role of the ILC laboratory and start with some form of functional analysis. Principally, but not completely, a domestic issues 15 Goals & Questions CFS-ADI Tokyo 2014 Mike Harrison

Any significant site-specific impact to the TDR design Nothing perceived to date. We need to set the IP location Cost vulnerability – can we identify any potential significant cost risk hidden in the post-TDR environment ? No. The Interaction Region is still more fluid than we would like, but the potentially largest issue appears to me to be the ILC laboratory 16 Goals & Questions CFS-ADI Tokyo 2014 Mike Harrison