ISAT 211 Mod 4-1  1997 M. Zarrugh Product Development Process Types  Market Pull Process begins with recognition of a market opportunity  Technology-Push.

Slides:



Advertisements
Similar presentations
Ch 3 System Development Environment
Advertisements

EYYUP ORAK Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Resource Planning Chapter 14.
Flexible Manufacturing Systems (FMS)
Computer Integrated Manufacturing CIM
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Strategy, Balanced Scorecard, and Strategic Profitability Analysis.
Industrial Engineering Program King Saud University
Chapter 3 - Product Design & Process Selection
Design, pageRaffoBA Design and Technology Design, pageRaffoBA Scope of Operations Support from Accounting, Finance, Human Resources, Information.
INDUSTRIAL & SYSTEMS ENGINEERING
Strategy, Balanced Scorecard, and Strategic Profitability Analysis
Operations Management and Technology Ross L. Fink.
Product Design and Process Selection
POM - J. Galván 1 PRODUCTION AND OPERATIONS MANAGEMENT Ch. 15: Material Requirements Planning (MRP)
Ken Youssefi Introduction to Engineering – E10 1 Design Process Concurrent Engineering.
Manufacturing Engineering Department Lecture 1 - Introduction
Product Development. Major Topics The product portfolio of a company concretizes its mission A description of the product selection and development process.
ISAT 211 Mod 3-1  1997 M. Zarrugh ISAT 211: Module 3 Product Design and Product Development Process  The learning objectives of Module 3 are to –Define.
Hasan Oben Pullu Dokuz Eylul University Industrial Engineering Department COMPUTER INTEGRATED MANUFACTURING (CIM)
© 2014 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Production Planning and Control Introduction
Dr. Osama Al-Habahbah Automation Chapter 1 Introduction.
How does ISAT331 fit in the curriculum?
SUBJECT  Industrial facility design. GROUP MEMBERS H.Hammad Ali 11-IE-32 S.Hammad shah 11-IE-21 Hammad Hassan 11-IE-41.
ISAT 211 CIM-1  M. Zarrugh Computer-Integrated Manufacturing (CIM): What It Is and Key Issues* Definition: The use of computer control and information.
Introduction to Computer Aided Process Planning
Chapter 15: Computer-Integrated Manufacturing Systems
Goal: Understand the stages in design process and the role of computer aided design. Objectives: After this chapter, you should understand the following.
Process Planning and Computer Aided Process Planning
Tech 149: Unit 3 Computer-Aided Engineering and Other CIM Subsystems.
COB 300C Product and Service Design. Reasons for Product or Service Design Be competitive Increase business growth & profits Avoid downsizing with development.
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
Chapter 3, Part 1 Product Design
ISQA 407 Introduction to Global Supply & Logistics Management Winter 2012 Portland State University.
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc. Upper Saddle River, N.J Material.
© 2007 Wiley Chapter 3 - Product Design & Process Selection.
Inventory/Purchasing Questions
ISAT 211 Mod 2-1  1997 M. Zarrugh ISAT 211 Module 2: Competitiveness and Operations Strategy  The learning objectives of this module are –To explain.
Lecture Outline 5 Manufacturing Systems (Production and Operations Management) p. 304+
Part 3 Managing for Quality and Competitiveness © 2015 McGraw-Hill Education.
Ken Youssefi Mechanical Engineering department 1 Design Process Concurrent Engineering.
Product Architecture, Industrial Design, Design for Manufacturing.
Producing World Class Goods and Services Chapter 12.
Technology and Productivity. What Are the Potential Benefits of Technology?
Chapter 18 Inventory and Production Management Cost Accounting Foundations and Evolutions Kinney and Raiborn Seventh Edition COPYRIGHT © 2009 South-Western,
Chapter 20 Managing inventory and quality. The importance of inventory management §Cope with uncertainties in customer demand and in production processes.
EM 420 Production and Operations Management Eng. Rodger L. NKUMBWA Dept. of Electrical Engineering Copperbelt University
Copyright © 2005 by South-Western, a division of Thomson Learning, Inc. All rights reserved. Part 3 Management: Empowering People to Achieve Business Objectives.
Foundations of Information Systems in Business. System ® System  A system is an interrelated set of business procedures used within one business unit.
UTA/ARRI. Enterprise Engineering for The Agile Enterprise Don Liles The University of Texas at Arlington.
Design of Goods and Services Chapter 5. Designing Goods Form design: Appearance and other sensory aspects of a product Contributes to customer expectations.
Production management Content – Core work process – 6 W – Production classification – EOQ – Lean Manufacturing – Systems of Management production.
Computer Integrated Manufacturing Department of Industrial & Systems Engineering.
Introduction to Computer Aided Process Planning
MOS 3330 Operations Management Professor Burjaw Fall/Winter
1 Block 3 Session 2 Continue.. & Session 3 Distribution systems, EDI and the organization: –Major developments over the last 30 years have been achieved.
Industrial Automation and Robotics Mr. Muhajir Ab. Rahim School of Mechatronic Engineering UniMAP.
DESIGN FOR MANUFACTURING AND ASSEMBLY
ISLANDS OF AUTOMATION.
Definition of CIM “CIM is the integration of the total manufacturing enterprise through the use of integrated systems and data communications coupled.
Design of Operations.
Advanced Manufacturing Technology
Chapter 7 The Conversion Cycle 1.
The University of Jordan Mechatronics Engineering Department
Flexible Manufacturing Systems
Components of Computer Integrated Manufacturing: CAD/CAM
Procurement’s Impact on Logistics.
MODERN TRENDS IN PRODUCTION ENGINEERING
Design for Manufacture and Assembly (DFMA) BDD 4013
Product Design & Development: Definitions
Presentation transcript:

ISAT 211 Mod 4-1  1997 M. Zarrugh Product Development Process Types  Market Pull Process begins with recognition of a market opportunity  Technology-Push New technology pushes new product development  Technology Platform Extension of existing expensive technology to new products  Process-Intensive Strong process requirements severely constrain the product and its development  Customized Generic product and processes are customized to meet specific requirements

ISAT 211 Mod 4-2  1997 M. Zarrugh ISAT 211 Module 4: Design/Manufacturing Interface  The learning objectives of Module 4 are to –Explain key processes linking product design (engineering) and manufacturing (production) –Itemize and explain the contents of the product definition file –Analyze manufacturing costs into its component parts –Recognize and illustrate design for manufacturing (DFM/DFA) and assembly methodology –Discuss computer-based technology in manufacturing industry Engineering Manufacturing ?

ISAT 211 Mod 4-3  1997 M. Zarrugh Engineering/Manufacturing Interface: DFM/DFA and CAD/CAM Engineering (Design) Manufacturing (production) ENG/MFG Interface  Product definition/ change control  DFM/DFA (cost)  CAD/CAM (time)  Group Technology (GT)  Computer-Aided Process Planning (CAPP)

ISAT 211 Mod 4-4  1997 M. Zarrugh Some Terminology: Alphabet Soup  CAD/CAM (more on this in the lab): –Computer Aided Design (CAD) is a computer-assisted process for the electronic capture of geometry (form and fit) of parts and their arrangements into complete products. –Computer Aided Manufacturing (CAM) refers to all automated processes in manufacturing, such as computer control of machine tools and materials handling equipment.  Group Technology (GT) is the grouping of parts by similarity in geometry or manufacturing processes (ISAT 331)  Computer Aided Process Planning (CAPP) is the use of computers to generate process plans (detailed instructions for making a part) from CAD data. (ISAT 331)

ISAT 211 Mod 4-5  1997 M. Zarrugh Design For Manufacturing (DFM) and Design For Assembly (DFA) or DFM/DFA  The object of DFM/DFA process is to generate a product definition (form, fit and structure) consistent with minimum cost.  DFM/DFA is iterative and requires cross-functional teams (concurrent engineering) so that form, function, cost and process are considered and optimized simultaneously.  Reduced manufacturing cost is the primary consideration in DFM/DFA.  Many rules have evolved to guide DFM/DFA.

ISAT 211 Mod 4-6  1997 M. Zarrugh DFM/DFA: Product Definition File  A modified product definition file is the main output of the DFM/DFA process. The file specifies: –Form/Fit: detail and assembly drawings –Structure: how parts fit together (Bill of Material, BOM) –Materials: raw materials properties and heat treatment –Process: how parts are to be made: welded, machined, cast –Specifications: governing standards and critical items –Test procedures: instructions for testing components, subassemblies and full products –User manual: instructions on how the product will be used –Disassembly/Repair manual: instructions for disassembly, repair and maintenance

ISAT 211 Mod 4-7  1997 M. Zarrugh DFM/DFA: Methodology Initial product definition file Release modified file Estimate MFG Costs Modify file to: Reduce Components Costs Reduce Assembly Costs Reduce Overhead Costs Consider Impact on Other Factors Compute MFG Costs OK? Y N Modify File

ISAT 211 Mod 4-8  1997 M. Zarrugh DFM/DFA: Manufacturing Cost Analysis Manufacturing Cost Component Cost Assembly Cost Overhead Cost Standard Parts Custom Parts Labor Cost Equipment/ Tooling Support/ Engineering G & A ProcessingTooling Raw Material

ISAT 211 Mod 4-9  1997 M. Zarrugh Manufacturing Cost: Fixed vs. Variable Costs  Fixed Costs: independent of how many units produced –Tooling and other nonrecurring expenses (NRE) –Investment expenses –Overhead costs (burden) –Selling expenses (G & A)  Variable Costs: –Material –Direct labor (including benefits) –Machine time

ISAT 211 Mod 4-10  1997 M. Zarrugh DFM/DFA: Guidelines for DFM  Use modular design  Use commercial and standard components  Reduce the number of processing steps  Eliminate unnecessary tight tolerances  Avoid smooth finish if not needed  Consider processing alternatives to machining such as casting and welding  Simplify and optimize process plans

ISAT 211 Mod 4-11  1997 M. Zarrugh DFM/DFA: Guidelines for DFA  Reduce part count  Simplify parts handling  Assemble in the open from the top  Work with gravity  Make parts easy to identify and orient  Use parts that are self aligning and do not tangle up  Eliminate fasteners  Assembly requires only one hand

ISAT 211 Mod 4-12  1997 M. Zarrugh DFM/DFA: Typical Reported Improvements* Users Reporting Improvements (%) *Based on survey results by Boothroyd and Dewhurst Reported Improvement

ISAT 211 Mod 4-13  1997 M. Zarrugh DFM/DFA: A Case Study (Adapted from D. L. Shunk,” Integrated Process Design and Development”, 1992, pp ) Because of significant backlog of microwave components, ma DFM project was initiated to speed up production.  Preliminary analysis of the current process “As Is” identified a component, the waveguide, as the bottleneck.  The “As Is” process for the waveguide consisted of –23 steps –10 stations –17 weeks to complete  Step 1 is sawing which could not be controlled to produce desired tolerance. By standardizing lengths, holding fixtures were introduced to provide the desired accuracy.

ISAT 211 Mod 4-14  1997 M. Zarrugh DFM/DFA: Waveguide Case Study “As Is” Process n Step # 1 n Station #

ISAT 211 Mod 4-15  1997 M. Zarrugh DFM/DFA: Waveguide Case Study Continued  A reliable supply of raw stock is critical for on-time production. A strategic alliance was formed with a vendor who became the primary source of the stock.  Through process simplification, the processes were consolidated into one dedicated cell (area).  Certain part routings were changed to improve flow.  The new “To Be” process flow consists of: –12 steps (vs. 23 before) –2 stations + 1 cell (vs. 10) –2 weeks completion (vs. 17 weeks)  The positioning strategy of “make-to-stock” was replaced with “make-to-order” because of increased responsiveness  Cost was reduced by 28%

ISAT 211 Mod 4-16  1997 M. Zarrugh DFM/DFA: Waveguide Case Study “To Be” Process (Wave Guide Cell) 9+3 steps 2 stations + 1 cell Cell

ISAT 211 Mod 4-17  1997 M. Zarrugh Why Do Companies Acquire New Technologies? To accomplish the following strategic goals:  Reduced cost of product, service or process  Faster product development or shorter time-to-market  Improved quality of product or service  Increased flexibility and improved responsiveness to changing customer needs or market climates

ISAT 211 Mod 4-18  1997 M. Zarrugh Computer-Based Technology In Manufacturing Industry: Recent Trends  Automation of manufacturing processes using computer control technology (CAM: NC/CNC)  Integration of automation islands via information technology (CIM, MRP, DBMS, PIM)  Industrial robotics  Flexible (cellular) Manufacturing Systems (FMS) CAM MRP DBMS PIM FMS CAD

ISAT 211 Mod 4-19  1997 M. Zarrugh Benefits of Implementing Computer-based Technology in MFG Industry Reduction in engineering design cost Reduction in overall lead time Increased product quality (yield) Increased engineering effectiveness Increased production productivity Increased equipment utilization Reduction in work-in-process Reduced labor cost Benefit Extent 15-30% 30-60% 2-5 times 3-35 times 40-70% 2-3 times 30-60% 5-20%

ISAT 211 Mod 4-20  1997 M. Zarrugh Recent Computer-Based Technology Innovations In Production Managenet  Office automation: word processing, spreadsheets, , voice mail and fax  Product data management systems: electronic capture and distribution of documents  Electronic data interchange (EDI): electronic exchange of data between systems and firms  Decision support and expert systems: analysis of decision alternatives and selecting the “best”  Communication: networked computer systems linking all units within an enterprise

ISAT 211 Mod 4-21  1997 M. Zarrugh Operational Benefits of New Technologies in Manufacturing Benefits are strategic and difficult to quantify:  Increased labor productivity: leveraging  Decreased material cost: fiber optics vs. copper  Reduced inventory cost: better scheduling and JIT  Improved process quality: consistency from automation  Improved product quality and reliability  Reduced cycle times and shorter delivery times

ISAT 211 Mod 4-22  1997 M. Zarrugh Technology Adoption Risks  Untested technology may disrupt operations  Rapid obsolescence of technology  Delays, retraining and errors caused by the introduction of new technology are disruptive  Management may abandon the technology too quickly due to early problems  Uncertainties of overall economic impact

Questions?