Safeguards Workshop October 30, 2008 Moldova, Chusinau Day 2 – Quiz Mitigation Dmytro Glazkov.

Slides:



Advertisements
Similar presentations
PennDOT Strategic Environmental Management Program by Kenneth Thornton, PG, Ileana Ivanciu, PG, and James Heeren, PE 2011 TRB Waste Management and Resource.
Advertisements

Environmental Impact Assessment for Waste Treatment Options
Environmental Impact of Coal- Fired Power Stations by Rob Glaser.
What are Ecosystem Services? Goods and life supporting services provided by natural ecosystem. Goods timber fisheries pharmaceuticals Services pollination.
ENVIRONMENTAL MONITORING AT SOLID WASTE (SW) LANDFILLS QUIZ Ruxandra Floroiu, Environmental Engineer, ECSSD WB Safeguards Workshop Chisinau, Moldova October.
Chris Dandurand, P.Eng Kiewit Infrastructure Group Large Hydro Perspective on the Permitting Process & Environmental Approvals.
Environmental Scoping Guidance Jerry Vogt Region Environmental Coordinator ODOT – Region 3.
Sustainable Construction
By Chris Ford and James Hughes ( ) ( )
MINING OPERATIONS ON NATIONAL FOREST SYSTEM LAND APPROVING, MONITORING, AND RECLAIMING OPERATIONS MINING OPERATIONS ON NATIONAL FOREST SYSTEM LAND APPROVING,
Earth Science 4.4 Protecting Resources
Environmental Health Unit: Lesson 1 - Introduction Objective: TSWBAT identify issues of how the environment affects our personal health on a daily basis.
OHIO STATE UNIVERSITY EXTENSION Ohio Pesticide Applicator Training Unit 5 Special Environmental Concerns.
Range Practices 1 Objectives and Range Practices under FRPA & Objectives & Objectives The Focus is on Results.
Overview of Environmental and Social Safeguards Environmental Management Plan Checklist for Simple Civil Works Zagreb, May 6-8, 2009 Presenter: Natasa.
Investing in the logistics necessary for Africa's Oil and Gas Industry.
PC Meeting July 1, 2015 CUP 15-02/DR 15-06/DR
OP/BP 4.01 Environmental Assessment Zagreb, May Presenter: Natasa Vetma Presentation prepared by Ruxandra Floroiu.
4.3 Water, Air, and Land Resources
Storm Water Pollution Prevention Training
Management of Spills & Leaks Two areas of focus: Prevention: Taking steps to minimize the potential for a spill and properly maintaining equipment to eliminate.
Waste Reduction and Pollution Prevention in Solid Waste and Construction and Maintenance “Putting Waste in its Place” Steve Brachman UW- Extension Solid.
EIA’s Environmental Impact Assessments. EIA’s Required in many countries before any kind of development takes place Determines The type and degree of.
Landfill. ESSENTIAL COMPONENTS 7 essential components are: (a) A liner system at the base and sides of the landfill which prevents migration.
WasteSection 3 Section 3: Hazardous Waste Preview Bellringer Objectives Types of Hazardous Waste Resource Conservation and Recovery Act The Superfund Act.
SL Village Hall June 24, 2002 Village of Freeport, New York Freeport Electric Village of Freeport, New York Freeport Electric.
Basic Concepts for Assessing Environmental Impacts.
Synopsis EIA Purpose of EIA Origin Key Elements NGO Participation Content Analysis 1.
Section 3: Mining Regulations and Mine Reclamation
I-90 Snoqualmie Pass East Project Tanya Lamb Urban Geography, GEOG 481 Description 15-mile stretch Hyak (MP 55.1) to Easton (MP 70.3) 2010 scheduled to.
At the last Steering Team meeting… Goals (Rule-level) EPS (Measurable and Reportable) Natural Resources Human/Cultural Environment Administrative Avoid,
WasteSection 3 Types of Hazardous Waste Hazardous wastes are wastes that are a risk to the health of humans or other living organisms. They may be solids,
West of England Joint Waste Development Plan Document Allan Davies Planning Policy Officer North Somerset Council West of England Partnership Office North.
Social Benefits Improve public health of work force and community. Create more walkable, accessible, and livable neighborhoods by incorporating Smart Growth.
Case study: SEA for land-use plan amendments of Krasna Hora municipality.
Policy and Legal Framework on Soil Contamination Management in Thailand Workshop on Strengthening Contaminated Soil Monitoring in Vietnam, November.
Case Study – Preparation of an EMP Integrated Ecosystem Management of Sunshine-Moon River Basin (SMRB) Project.
Mini-Case / Quiz Topic: EA Categorization and EMP Requirements By Victor B. Loksha ECA Safeguards Team Europe and Central Asia Region The World Bank Discussion.
ERT 319 Industrial Waste Treatment Semester /2013 Huzairy Hassan School of Bioprocess Engineering UniMAP.
Understanding Activities, Aspects, and Impacts in the EMS.
Waste Management and Research Center Waste Management and Research Center l Formed in 1984 l IL Dept of Natural Resources l Located at University of Illinois.
Environmental Commitments/Tracking. Environmental Commitments Federal Agencies Shall –Use all practicable means consistent with the requirements of.
Impacts of Mining, Mining Regulations & Mine Reclamation.
Training on the Facilitation of Environmental & Social Management Framework (ESMF)
Overview of Environmental and Social Safeguards Environmental Management Plan Checklist for Simple Civil Works Chisinau, October 28-31, 2008 Ruxandra Floroiu,
Consultant: CMDC Joint Venture 1 Evaluation and optimisation of alternatives Two cases - Criteria of judgement - Matrix evaluation, including costs - Mitigating.
PORT OPERATIONS AND THE ENVIRONMENT. Port construction and operation are compulsory development activities with potentially massive economic, social and.
24 August 2007 EDR Effort 1 CF&S Environmental Process for an Americas Regional Effort EDR Planning Jerry Aarons & Rod Walton.
Ukraine Petro Nakhaba All-Ukrainian Public Organization “ Chysta Khvylya ” Deputy Head Kyiv, Ukraine Contaminated Sites Management Joint UMOE-DEPA Project.
Environmental Protection Agency (EPA)  Founded by U.S. government (under Richard Nixon) in 1970  William Ruckleshaus was first EPA administrator  a.
Bellringer. Types of Hazardous Waste Hazardous wastes are wastes that are a risk to the health of humans or other living organisms. – They include: solids,
16.3. Bellringer The Environmental Impacts of Mining Because of the potential environmental impact of mining on a large scale, mining is one of the most.
Socially Acceptable Costs for Municipal Solid Waste Management Services Vojtěch Doležal, SEWACO s.r.o 24 June 2015 ISWA Study Tour WASTE-TO-ENERGY.
Table 1. Environmental impacts associated with upstream and downstream petroleum operations Aniefiok E. Ite et al. Petroleum Exploration and Production:
Environmental Safeguards
SAFE 101 NSC Chapter 14.
How to Protect the Local Environment
TSCHUDI COPPER MINE.
Waste Planning Case Studies Exeter Energy from Waste Facility
4.4 Protecting Resources.
Classroom Catalyst.
Scientific or Engineered Landfilling of Waste
Environmental Protection Agency
First draft – for discussion, not to be cited
A new financial instrument
Mitigation.
CONSTRUCTION REGULATIONS AND CODES
Chapter 4.4 Protecting Resources.
Environmental Impact Assessments
Relationship between World Bank and Romanian EA requirements
Presentation transcript:

Safeguards Workshop October 30, 2008 Moldova, Chusinau Day 2 – Quiz Mitigation Dmytro Glazkov

Case Study Presentation: Environmental Assessment and Environmental Management Plan were developed for Ukraine Power Transmission Project financed by the Bank. EMP included a range of mitigation issues which are devoted to removing or reducing adverse impacts on environment and natural habitats or their functions, keeping such impacts within socially defined limits of acceptable environmental change. Based on local environmental legislation and applicable international standards Ukraine Power Transmission Operator hired Local Institute which developed a comprehensive EIA and EMP You are a representative of local NGO which received an invitation to Public Consultations planned next week and devoted to review of EA/EMP. You should review publicly available EA/EMP, paying attention to proposed mitigation issues and during Consultations ask questions.

MITIGATION QUIZ What is Environmental Mitigation (choose all that apply): 1. Avoiding the impact altogether by not taking action. 2. Minimizing impacts by limiting the degree or magnitude of the action and its implementation. 3. Neglecting minor impacts and paying attention to major negative ones. 4. Softening the impact by repairing, rehabilitating, or restoring the affected environment. 5. Reducing or eliminating the impact over time by preservation and maintenance operations during the life of the action. 6. Compensating for the impact by replacing or providing substitute resources or environments. 7. Compensating people who are negatively affected by impacts 8. Demonstrating that negative impacts are outweighed by positive economic impacts

MITIGATION QUIZ Which one is a correct statement? Does The Bank favors preventive measures over mitigatory or compensatory measures? or The Bank favors mitigatory or compensatory measures over preventive measures?

MITIGATION QUIZ Project's environmental management plan (EMP) consists of? (choose all that apply): Financial Indicators Set of mitigation measures Monitoring Actions Project Screening Criteria Procurement Plan Institutional Measures Public Disclosure info

MITIGATION QUIZ Please Match Activity and Impacts to appropriate Mitigation Measure Activity / Potential Impact Mitigation Measure Potential Impacts during Construction 1Transportation of Materials to the site / Noise, Emissions, Dust1 Provision of rain/storm water sewage / treatment 2Substation Rehabilitation / Wastes accumulation2Provision of chance find options 3Vegetation Removal within the right of way3 No blockage for wildlife passage /provision of special passage corridors 4Visual Aspects for adjacent buildings4 Traffic Rerouting / Work during Day time / Using Better car fleet with low emissions / Road Watering Potential Impacts during Operations Stage 5Surface Water Contamination5 New vegetation planting. Landscaping, protective fencing 6Blockage of wildlife passage / Species impacts6 Provision of special noise protection screens, usage of low noise/low vibration trains 7Noise, vibration7Proper Wastes collection and disposal 8Churches, monuments8 Proper sitting of proposed rout, proper public consultations

MITIGATION QUIZ During Rehabilitation of High Voltage Power Transformer Consulting Company identified and filed that cooling oil containing PCBs spilled into the ground. What measures should be included in EMP on how to deal with PCBs? (choose all that apply): 1. Call for Public Consultation Process 2. Hire qualified company to identify source of contamination and Removing Sources of Contamination 3. Dispose contaminated land with PCBs at nearby landfill 4. Set institutional controls which can prevent intrusion into the contaminated zone that could lead to increased movement of those PCBs to surface waters 5. Do site sampling of soil and groundwater quality to identify further leaching of PCBs 6. Call to sanitary inspection to clean it up 7. Call to sanitary inspection to report on PCB contamination

MITIGATION QUIZ Select activities performed by Contractors during the construction phase of project (construction of transmission line and 550kV substation) to prevent and mitigate possible negative impacts on the environment and people? Waste management/handling; Land, soil and water control; Air emission control; Control of energy efficiency measures; Cultural resources/chance find; Traffic rerouting; Natural habitats control; Occupational and health safety of workers; International water ways control;

MITIGATION QUIZ What are the institutions responsible during reconstruction of Power Transmission Network for Implementation of Proposed Mitigation Measures? 1. Contractors 2. Power Transmission Company (PTC) 3. Pest Management Expert 4. Laboratory hired for soil sampling 5. Prime minister 6. Transport Authority 7. Environmental Inspection 8. General Population leaving nearby Power Transmission Line 9. Chief Engineer 10. Company hired for removal of PCBs

MITIGATION QUIZ Planned Transmission line passes through ~ 50 years old Forest (select Mitigation Measures which are applicable): Cut Forest without any compensation; Propose an underground cable instead of power line; Replant Trees into new location as a compensation/mitigation measure; Sacrifice this site and find new site which is equaly important and create a natural biodiversity area; Select a New site and plant new trees (of same sort) as a compensation to old forest plantation; Change pass for Transmission Line;

MITIGATION QUIZ Power Transmission Line also encountered a pile of obsolete pesticides (select Mitigation Measures which might be used): Transport this pesticides to a site 200 meters away from the planned pass of Transmission Line and dispose their; Send to Incineration Facility; Application of the pesticides to the farms located near the site; Call to the waste management company and get them remove pesticides to the landfill; Collect Pesticides and transport them to the proper storage site (i.e. concrete floor, no leaching, guarded for theft, etc.);