Tracker QA Test Station Status. 29/08/2015Imperial College 2 Updated QA Scan Definition Scan definition: 1 –One 300 mm scan  r to V (1) 25 –Two 75 mm.

Slides:



Advertisements
Similar presentations
Welcome to the Montreal MIS Tutorial. MIS Tutorial What is an MIS What is the MIS role in JDF Introduction Gray Boxes MIS Requirements – Job Costing.
Advertisements

HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
Setup/Installation/Operation of an Environmental Control Unit (ECU)
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 27, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
MICO 1 st February 2010 Terry Hart (MOM). MICO 1 st February June 2015 Decay Solenoid DS will not be ready for Machine Physics. Matt Hills spent.
Status of Electronics & Control System P J Smith University of Sheffield 16/12/2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO May 5, 2009.
Target Controller Electronics Upgrade Status P. Smith J. Leaver.
Problems with UPS racks last week... During the DSS tests on the weekend Jun 1-2 all racks connected to „interruptable“ UPS were cut by DSS at some point.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
Antiproton Lens Replacement (Unfortunately Part 2) Keith Gollwitzer Antiproton Source Department for the Experts and Mechanical Support Department Target.
MICE Tracker Update Alan Bross NFMCC Friday Meeting November 10, 2006.
Cryo Update and Power Distribution Alan Bross Tracker Parallel – MICE CM October 7, 2007.
Takashi Matsushita Imperial College T. Matsushita 1 Tracker Status.
MICE Decay Solenoid Quench Detector Trevor Hartnett Daresbury Laboratory.
Imperial College Tracker Slow Control & Monitoring.
MICE MICE Target Mechanism Control Electronics Upgrade P J Smith – University of Sheffield James Leaver – Imperial College 2 nd March 2009.
Magnetic Shielding Roy Preece. Issues Cooling channel initially designed without return yolks. Current North and South shielding walls designed to encapsulate.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
IPM status and plans 1.Yellow vertical detector has extremely low coupling to beam and to signal-gating grid. It also has improved resolution due to reduced.
Overview of Tracker Interlocks Designed to protect tracker equipment, in particular the VLPC cassettes, from damage due to failure in part of the tracker.
1M. Ellis - MICE Tracker PC - 19th October 2007 Station QA Analysis (G4MICE)  For details of software see my previous talk here: u
Sci-Fi Tracker: Progress Report Malcolm Ellis, MICE Video Conference Wednesday 6 th October 2004.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
MICO July 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Overview – Hardware status o Installation at RAL o DAQ workshop o Current Activities Jean-Sebastien.
Tracker Summary Alan Bross MICE CM October 10, 2007.
1M. Ellis - MICE VC - 1st November 2007 Cosmic Ray Test Preparations  The cosmic ray test was initially planned to be held in R12, but this proved to.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
Dmitri Denisov D0 Weekly Summary: August 18 to August 24  Delivered Luminosity and operating efficiency u Delivered 6.9pb -1 u Recorded 6.0pb -1 (87%)
PHENIX STATUS Stefan Bathe, Time Meeting, June 1, 2010.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
André Augustinus 9 October 2006 Interlocks update.
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
SPHENIX MECHANICAL D. Lynch & R. Ruggiero July 31, /29/2014sPHENIX Mechanical Design.
TC meeting P2 planning wks 3&4 A.Tauro
Pixel Action Matrix C. Newsom July 15, Overview Critical Parameters Initial Discussion – Top 6 critical failures Discussion - Detailed Documentation.
S A Griffiths CM42 June 2015 Electrical & Control.
Status CO2 Cooling IBBelle: Reconnection after Belle II Roll in
5 Day Forecast Mon Tues Wed Thu Fri.
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Tracker Station QA Acceptance Test Rig Status
MON TUE WED THU
January MON TUE WED THU FRI SAT SUN
January MON TUE WED THU FRI SAT SUN
VITALITY Large Splits Johnson Controls PowerPoint Guidelines | July 21, 2009.
January Sun Mon Tue Wed Thu Fri Sat
January MON TUE WED THU FRI SAT SUN
January MON TUE WED THU FRI SAT SUN
November technical stop activities:
Testing Plan and Status
January MON TUE WED THU FRI SAT SUN
Sun Mon Tue Wed Thu Fri Sat
January MON TUE WED THU FRI SAT SUN
January MON TUE WED THU FRI SAT SUN
Sun Mon Tue Wed Thu Fri Sat
1/○~1/○ weekly schedule MON TUE WED THU FRI SAT SUN MEMO
January MON TUE WED THU FRI SAT SUN
S M T W F S M T W F
2016 | 10 OCT SUN MON TUE WED THU FRI SAT
Sun Mon Tue Wed Thu Fri Sat
1 January 2018 Sun Mon Tue Wed Thu Fri Sat
Presentation transcript:

Tracker QA Test Station Status

29/08/2015Imperial College 2 Updated QA Scan Definition Scan definition: 1 –One 300 mm scan  r to V (1) 25 –Two 75 mm scans  r to X (2, 5) 34 –Two 75 mm scans  r to W (3, 4) –Absolute minimum required for full channel coverage QA parameters: –Triggers/step: 50k –Step size: ~27 mm –No. of steps: 28 –DAQ rate: 38 Hz –Duration: ~11 hours V W X

29/08/2015Imperial College 3 Data Acquisition Schedule TUE 30/10/07 WED 31/10/07 THU 1/11/07 FRI 2/11/07 SAT/SUN MON 5/11/07 TUE 6/11/07 WED 7/11/07 THU 8/11/07 StationAMPMAMPMAMPMAMPMAMPMAMPMAMPMAMPMAMPM Install Station:~3-4 hours QA Scan:~11 hours 5 stations scanned by the afternoon of Thursday 8 th November

29/08/2015Imperial College 4 Safety Interlock Systems (1) Power Supply: –Currently, mains equipment individually protected with circuit breakers but compressor running from unprotected 3 phase supply When power restored after blackout, mains equipment remains off but compressor restarts – potentially harmful –IC electricians asked to provide solution: New high capacity 3 phase line installed Split into ‘normal’ 3 phase and mains supplies at breaker box Blackouts cause breaker box to trip – switches off ‘root’ 3 phase supply, protecting both mains equipment and compressor N.B. Only one particular type of trip switch will work with compressor! IC electricians will provide details of setup, for replication at RAL… –New supply installed in parallel with existing one – no disruption to data taking –Work complete on Wednesday 31 st October, but intend to continue using old supply during current intensive 5 station QA run

29/08/2015Imperial College 5 Safety Interlock Systems (2) Smoke Detector: –Craig has ordered Vesda Laser Focus 250 smoke detector system Should arrive by the end of the week –Alarm signal will turn off AFEIIt power supply –IC electricians propose additional (standalone) relay switch between main 3 phase breaker box & AFEIIt PSU All electricians busy at the moment, so haven’t yet identified suitable relay (should be able to start looking by the end of the week…?) –Will also need to request Mechanical Workshop time for installation of Vesda tubing system (for ‘sniffing’ AFEIIts)…

29/08/2015Imperial College 6 Safety Interlock Systems (3) Cassette Pressure, Lid Temperature/Water Alarms: –Should just turn off AFEIIt PSU & compressor –However, in order to shut down compressor, must be wired into main switch of 3 phase breaker box Will therefore turn off all equipment (but should not be a problem…?) –Request technical documentation for alarm signals, as electricians will need to build interface control logic –Installation will most likely require significant downtime of breaker box supplies Either switch back to unprotected supply for duration of work, or move over to the new protected mains & 3 phase supplies after alarm control logic has been fitted

29/08/2015Imperial College 7 Summary Time-optimised scan pattern defined First 5 stations to be QA scanned by the 8 th of November Power supply safety interlock in place Work progressing on remaining safety interlock systems