N. BlaskovicFONT Meeting1 ATF February-March 2014 shift plan N. Blaskovic.

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez.
N. BlaskovicFONT Meeting1 Preliminary resolution study results N. Blaskovic.
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
N. BlaskovicFONT Meeting1 November 2013 week 2 FONT shift summary N. Blaskovic.
FONT Meeting1 Calibrations over IP LO power scan N. Blaskovic.
FONT Meeting1 Waveforms with and without BPFs N. Blaskovic.
IPBPM piezo-mover system and plans for in situ monitoring of calibration and stability Current status and plan for ATF2 Philip Bambade Laboratoire de l’Accélérateur.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
N. BlaskovicFONT Meeting1 FONT5 board #2 DAC tests N. Blaskovic.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
CERN, BE-ABP (Accelerators and Beam Physics group) J. Pfingstner Beam jitter studies at ATF and ATF2 Jürgen Pfingstner Hector Garcia Morales 25 th of January.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
Analogue BPM data analysis Calibration & resolution results.
FJPPL-FKPPL Workshop on ATF21 FONT digitisation studies of IP BPMs D. Bett, N. Blaskovic, P. Burrows, G. Christian, M. Davis, Y. I. Kim, C. Perry John.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
Philip Burrows ATF 15/03/05 FONT Group Progress + Plans 2005 Philip Burrows, Christine Clarke, Glenn Christian, Hamid Dabiri Khah, Stephen Molloy, Glen.
IP BPM Shift Report FONT Meeting: 22 December 2014 Talitha Bromwich.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
FONT Hardware Processing electronics and current beam tests Stephen Molloy Queen Mary, University of London.
FONT Meeting1 Charge normalisation and IP LO power scan N. Blaskovic.
N. BlaskovicFONT Meeting1 ATF October 2014 shift plan N. Blaskovic.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Feedback On Nanosecond Timescales (FONT) Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis**, Colin Perry.
IPBPM issues (Limitation of resolution) Siwon Jang (KNU)
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
ATF DR BPM Upgrade Janice Nelson, Doug McCormick, Justin May, Andrei Seryi, Tonee Smith, Mark Woodley.
FONT Meeting1 3-BPM resolution with digital filtering N. Blaskovic.
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
Philip Burrows ATF2 project meeting 1/07/101 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
NumberMikey Davis02 November 2012 Roundup of ATF Trip.
Jitter Monitor – Overview and Status Report Glenn Christian, Alexander Kalinin 30 May 2005.
FONT GROUP MEETING ATF JUNE SUMMARY Neven & Talitha Talitha Bromwich - Friday, 26 June 2015.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
Low-Q IP BPM Y. I. Kim *, A. Heo, E-S. Kim (KNU) S. T. Boogert (JAI) D. M. McCormick, J. May, J. Nelson, T. Smith, G. R. White (SLAC) Y. Honda, N. Terunuma,
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
Overview of progress at FONT Neven Blaskovic TMD technologies CASE student John Adams Institute Oxford University.
ATF Meeting1 IP BPM studies with Honda’s electronics Neven Blaskovic with Wunghoa Park Oscar Blanco Alexis Gamelin N. Blaskovic.
1/33Mikey Davis24 January 2013 Review of 23 rd of January Shift.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
N. BlaskovicFONT Meeting1 Feedforward runs N. Blaskovic.
FONT Oxford FONT REPORT NOVEMBER Neven Blaskovic Kraljevic and Talitha Bromwich Friday, 27 November
D. BettATF Operations Meeting - 15 June IP C. Perry G. Christian Y. Kim D. Bett N. Blaskovic Kraljevic.
N. Blaskovic, T. Bromwich, R. Ramjiawan
Roundup of Week at ATF Mikey Davis 19 April /26.
Expected hardware status and Priority of the commissioning task
Further Tracking Studies and March Trip Plan
N. Blaskovic, T. Bromwich, P. Burrows, G. Christian, C. Perry, R
ATF cable plan N. Blaskovic N. Blaskovic FONT Meeting.
Firmware Update 29/03/2017 Rebecca Ramjiawan.
Analysis of March ATF Run
N. Blaskovic, T. Bromwich & G. Christian
ATF Shift Plans Rebecca, Talitha 08/09/2017 Friday, 08 September 2017
March Trip Plan Mikey Davis 01 March /7.
Revised ATF Shift Plans
Progress towards nanometre beam stabilisation at ATF2
Progress towards nanometre level beam stabilisation
FONT stripline BPM resolution
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Extraction kicker scan & feedback results
Presentation transcript:

N. BlaskovicFONT Meeting1 ATF February-March 2014 shift plan N. Blaskovic

Contents FONT trip dates Set-up –Required hardware –Requested cables DR study EXT stripline study IP BPM study FONT Meeting2N. Blaskovic

FONT trip dates Young-Im: already at KEK Glenn:22 February – 1 March Neven:22 February – 15 March Mikey:26 February – 6 March Doug:27 February – 15 March FONT Meeting3N. Blaskovic

Set-up Two FONT5 boards, both in P2 area: –Board 1: Monitor MQF1X, MQF3X, MQD5X –Board 2: Monitor DR BPM, P2, P3 Instrument DR BPM: –With local processor –With asymmetrically variably attenuated strips SLAC/FONT switches on MQF1X, 3X, 5X FONT Meeting4N. Blaskovic

Hardware required Instrument DR BPM: –BPM processor (borrow from MFB1FF?) DR BPM variable attenuators: –2 Agilent 1 dB step variable attenuators –1 Agilent variable attenuator controller SLAC/FONT switches on MQF1X, 3X, 5X: –6 RF switches, with power cords –1 24 V power supply, with two T-connectors FONT Meeting5N. Blaskovic

Cable request Instrument DR BPM local processor: –1 Heliax (LO) from P2 area to DR BPM –3 RG58s (Δ, Σ I, Σ Q ) from DR BPM to P2 area DR BPM variable attenuator controller: –1 Ethernet cable connected to atf-local SLAC/FONT switches on MQF1X, 3X, 5X: –1 RG58 from power box to each of the BPMs FONT Meeting6N. Blaskovic

DR study Firmware options: –DR 2 17 turn firmware –Glenn’s new ~1000 sample firmware –Standard feedback firmware Calibrate DR BPM: –Bump scan with symmetric attenuation to verify /um calibration constant –Use calibrated bump scan to calibrate BPM with optimum asymmetric attenuation FONT Meeting7N. Blaskovic

DR study Other than the calibration, the program is parasitic in 1-bunch mode: –Measure pulse-to-pulse jitter in DR –Measure turn-to-turn jitter in DR –Establish multi-turn DR BPM resolution –Monitor multi-turn DR BPM with P2 and P3 –Establish DR BPM, P2 and P3 resolution using different DR turns FONT Meeting8N. Blaskovic

EXT stripline BPM study In collaboration with Juergen: –Measure beam position correlation and jitter in extraction line using our BPM processors –Introduce large orbit bumps; monitor at BPM with SLAC electronics and elsewhere with our BPM processors (where instrumented) –Save DR BPM data FONT Meeting9N. Blaskovic

IP BPM study On shift, put FONT5 board 1 in S-band hut Instrument: –IPA (Y) I & Q –IPB (Y) I & Q –IPC (Y) I & Q –IPC (X) I & Q –Reference (Y) Slow orbit feedback on if in 1-bunch mode FONT Meeting10N. Blaskovic

IP BPM study Start by looking at one BPM only, e.g. IPC Iterate at 40 dB, then 20 dB, then 0 dB: –Rough calibration with waist close to BPM –Waist scan to find current for waist on BPM –Fine mover calibration with waist on BPM –Jitter run with waist on BPM Check calibration scaling with attenuation Check calibration using QD0FF mover FONT Meeting11N. Blaskovic

IP BPM study Whilst 2 FONT5 boards are available, instrumenting DR*, P2, P3 and IP allows: –Upstream-downstream position correlation –Upstream-downstream position resolution (only if resolutions are comparable!) –Upstream nominal coupled-loop feedback (requiring upstream kicker scans, and waist and second-bunch centre at given IP BPM) * Replace DR BPM by MFB1FF? FONT Meeting12N. Blaskovic