SNS Integrated Control System MPS - Commissioning Plans 1. Quick MPS System Overview 2. Run Permit System 3. Fast Protect Auto Reset 4. Fast Protect Latched.

Slides:



Advertisements
Similar presentations
Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
Advertisements

01/11/2002SNS Software Final Design Review1 V123S Event Link Encoder, Transmission System and PLL Receiver Thomas M. Kerner (BNL) SNS Global Controls.
André Augustinus 16 June 2003 DCS Workshop Safety.
CLS Machine Status Displays System Analyst - Controls Canadian Light Source Inc. web: Perimeter.
Experience with Bunch Shape Monitors at SNS A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
SNS Machine Protection System Final Design Review Introduction
Patrick Krejcik LCLS April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience.
SNS Integrated Control System SNS Machine Protection System EPICS Workshop April 27, 2005 Coles Sibley.
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
ORNL-SNS Diagnostic Group SNS Beam Loss Monitors and HARPs Machine Protection System FDR September 11,2001 Presented by Saeed Assadi.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
Tuning an Accelerator for 1 MW C. Peters WAO 12 August 8 th, 2012.
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
CRIO as a hardware platform for Machine Protection. W. Blokland S. Zhukov.
SNS Integrated Control System SNS Timing Master LA-UR Eric Bjorklund.
Beam diagnostics control for J-PARC LINAC Guobao SHEN J-PARC Center Japan Atomic Energy Agency Mar
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
RF voltage and frequency interlocks A. Butterworth MP review 17/6/2010.
F Antiproton Source Apertures Steve Werkema DOE Tevatron Operations Review March 22, 2006.
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
November 18, 2002Richard Talaga1 Target Hall Instrumentation NuMI Neutrino Beam Devices Instrumentation Review Instrumentation &Communication Overview.
G2p/GEp Beamline Tim Michalski Project Lead. Beamline Overview Slow Raster Tungsten Calorimeter Upside Down Girder (correctors, BCM, superharp) FZ1 Magnet.
Post Mortem Collimators and Movable Objects Michel Jonker Post Mortem Workshop Cern, 16 & 17 January 2007.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
Managed by UT-Battelle for the Department of Energy SNS BLM System Overview Detectors, Measurements, Simulations Alexander Zhukov Saeed Assadi SNS/ORNL.
LHC Collimation Project Integration into the control system Michel Jonker External Review of the LHC Collimation Project 1 July 2004.
Issues in Accelerator Control Bob Dalesio, December 23, 2002.
1 BROOKHAVEN SCIENCE ASSOCIATES Integrated Testing George Ganetis Integrated Testing ASAC Review October 14-15, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
MP Questions for LE eCooling. Why talk about this now? Is there additional equipment needed, not yet considered? (nor costed) Interfaces to systems that.
Timing Requirements for Spallation Neutron Sources Timing system clock synchronized to the storage ring’s revolution frequency. –LANSCE: MHz.
Managed by UT-Battelle for the Department of Energy SNS Injection and Extraction Systems Issues and Solutions by M. Plum for the SNS team and our BNL collaborators.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
T. Fleck, GSI, Darmstadt, Germany ICALEPCS Status of the Control System for HICAT at an advanced stage of Commissioning Functions, Restrictions.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Beam on Target Diagnostics Beam on Target Meeting 2013 March Tom Shea.
Estimates of required MPS reaction time In the merger (at the centers of respective 20deg dipoles and in between 2 lenses) rms R=250 um In the
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
SNS linac beam commissioning By Michael Plum Spallation Neutron Source Oak Ridge National Laboratory ESS Workshop on beam commissioning April 8-9, 2014.
LCLS MPS Upgrade Gasper Jansa, Luciano Piccoli, Jeff Olsen, Garth Brown, Sonya Hoobler, Stephen Norum, Stephanie Allison, Kim Kukhee Adding BSA.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Machine Protection Systems (MPS) Arden Warner, and Jim Steimel Project X Machine Advisory Committee March 18-19, 2013.
BIS main electronic modules - Oriented Linac4 - Stéphane Gabourin TE/MPE-EP Workshop on Beam Interlock Systems Jan 2015.
HB2008 – WG F: 27 Aug. S. Childress – Diagnostics_2MW 1 NuMI Beam Diagnostics and Control Steps to 2 MW S. Childress Fermilab.
PXIE warm front end status A. Shemyakin PIP-II technical meeting 3 May 2016.
MI Shielding Machine Protection Credit D. Capista March 7,2010.
NMLTA Protection System Update -Loss Monitors- Arden Warner September 2 nd, 2009.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
Failure Analysis Tools at DESY. M. Bieler, T. Lensch, M. Werner, DESY ARW 2013, Melbourne,
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
SNS Integrated Control System ORACLE –JERI DB Generation April 27, 2004 Coles Sibley Jeff Patton.
ESS Beam Diagnostics Overview Andreas Jansson / BI Group Beam Diagnostics Mini-workshop
Reliability and Performance of the SNS Machine Protection System Doug Curry 2013.
RF acceleration and transverse damper systems
Data providers Volume & Type of Analysis Kickers
2007 IEEE Nuclear Science Symposium (NSS)
Injectors BLM system: PS Ring installation at EYETS
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
SNS Timing System EPICS Workshop April 28, 2005 Coles Sibley
Thursday morning – optics correction
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
Interlocking of CNGS (and other high intensity beams) at the SPS
RF Local Protection System
The LHC Beam Interlock System
(Beam) Commissioning Plan
Operation of Target Safety System (TSS)
SPS Injection BIS - Draft requirements
Presentation transcript:

SNS Integrated Control System MPS - Commissioning Plans 1. Quick MPS System Overview 2. Run Permit System 3. Fast Protect Auto Reset 4. Fast Protect Latched 5. High QA (Hard Wired) MPS System

SNS Integrated Control System MPS Design Assumptions l Four layers of protection! »High QA (Hardware)PLC »Hardware / Software(Fast Protect System) »Software (Run Permit System) l Machine Protection System is not a “Safety Class” or “Safety Significant” System. l SNS will be built and commissioned in Phases, MPS must accommodate this schedule, (Flexible and Reliable). l Reliability – The Machine Protection System must inhibit the beam when required. It must fail in a SAFE state. l Availability – The machine availability should be as high as possible. The MPS must be easy to configure and have a “friendly” operator interface. False trips must be minimized.

SNS Integrated Control System MPS - Layered Protection

SNS Integrated Control System MPS Commissioning (Verification, systems checked previously without beam, Commissioning and testing) l Run Permit System (1 second) »Verifies IOC configuration and beam line equipment status. »MPS masking, Beam Power limit verification l Fast Protect Auto Reset (20 microseconds) »Beam Loss Monitors »Beam Current Monitors l Fast Protect Latched System (20 microseconds) »Power Supply status, RF, Kicker status »System cooling status (Collimators, dumps, etc) »Etc. l High QA MPS (~ 33 msec) »Magnetic Field limit(s) verification »Beam Diagnostics verification, calibration, testing

SNS Integrated Control System MPS Fast Protect System Layout

SNS Integrated Control System MPS Shutoff Equipment l Hard Wire Protect »RF drive to RFQ Power Supply interlocks »65 KV Power Supply Interlocks l Fast Protect – Auto Reset »RF drive to RFQ »LEBT Chopper l Fast Protect - Latched »65 KV Power supply »RFQ Power Supply l Run Permit »Fast Protect - Latched »Fast Protect - Auto Reset l ( Time Line Decoder (un-schedule all beam) )

SNS Integrated Control System MPS - Fast Protect Inputs LLRF Inputs could be auto reset (FPAR) ~50% of corrector supplies will not initially be MPS inputs HEBT 12/18, RING 12/126, RTBT 12/19 BLM’s could be Latched, as determined during commissioning

SNS Integrated Control System Bypassing MPS Inputs l Allow easy bypass (Software Masking) »Different rules for commissioning and operations »Commissioning, FPAR devices can be masked »Commissioning, FPL – subset of Quads and correctors can be masked, all dipoles and rest of quads need ASD Radiation safety approval. »Commissioning team – ASD-RS should agree on list before commissioning. l Easy OPI for verifying, changing software MASK. l MODE masks are defined by ASD-RS, not easily changed.

SNS Integrated Control System

Run Permit System – Tasks l Machine Mode Setup »Machine Mode (Dump) and Beam Mode (Power, Width restrictions) Selection (From High QA System) »Longitudinal pulse profile verification and selection »Verifies machine setup before changing mode l Schedules Machine Sequence »Keeps Beam, RF, Modulator gates in sync »Schedules Pulse Profiles at requested rate »Calculates / verifies table checksums (pulse to pulse) l Operator Interface to MPS »Control and Status Displays »Software Masking of inputs / Trip limit Controls l Hardware configuration verification »SNL task scans IOC hardware configuration for verification

SNS Integrated Control System Run Permit System – Mode Definitions l Machine Modes »Ion Source »D-Plate »Linac Dump »Injection Dump »Ring »Extraction Dump »Target l Beam Modes »Beam Off »Diagnostics (10 usec) »Diagnostics (50 usec) »Diagnostics (100 usec) »Full Pulse Width (1 msec) »Low Power (7.5 kW) »Medium Power (200 kW) »Full Power (2 MW) l Machine mode selected by Key switch in control room, Beam Mode selected by Key or software. Switches read by High QA MPS system.

SNS Integrated Control System RPS – Operating Envelope Calculations

SNS Integrated Control System User Beam Profile Request

SNS Integrated Control System MPS Top Level Screen

SNS Integrated Control System Run Permit System – Operator Interface

SNS Integrated Control System Typical Top Level Screens l Global Software Mask Status Display l BLM Trip Point Display l Time / Fault display line »Post Mortem playback, Loss verses RF, etc l Time Line Recorder »Timing system faults, missing events, extra events, etc l PPS Status, Beam line readiness, etc l Fault by system, Fault by area l Beam Profile scheduling, Rate requests, etc. l Requests for specific displays seen elsewhere appreciated, a quick hand sketch is useful.

SNS Integrated Control System

Fast Protect – Auto Reset l ALARA – Pulse Width Modulation, Tuning Aid l Concentrates Permit Inputs l Beamline Inputs Bypassed by Mode l Inhibits carrier link to disable Beam l Typical Inputs: »Loss Monitors »Time Line Recorder (Noise detected on Event Link) »Differential current monitors l Auto resets for next beam pulse, Latches to FAULT state after N trips in M pulses l Auto mask sets(MODE MASK) (Wire Scanners) »Mode allows WS to be bypassed, SW Mask bypasses WS input

SNS Integrated Control System SNS BLM SYSTEM DESIGN CRITERIA Upper end signal: (Fast Protect Auto Reset) – Maximum beam loss of 1 % at a single location –35-50 kHz signal BW –Beam interrupt via MPS based on integrated loss during pulse ( 10 μsec response) Lower end signal: (Beam Loss Accounting System) –Set by 1 W/m requirement for maintenance –Must resolve 1% of 1 W/m but at BW of < 1 Hz –Warning only after extended period of loss (1 minute) –(Saeed Assadi, MPS FDR slides)

SNS Integrated Control System BLM-- Specification: Fast Loss : (Determine thresholds during commissioning) 1)10 µsec Detect-to-Beam Inhibit time. 2) Programmable threshold, each detector, level changes/macro-pulse 3) Each detector maskable (eliminate bad channels, permit studies resulting in higher than normal losses) Single output line/analog crate Long-term: (Calibration Studies) 1) Low level loss: "Soft" alarm through network or 2) Programmable threshold, each detector, 3) Each detector maskable (eliminate bad channels, permit studies resulting in higher than normal losses) Single output line/analog crate Local Data Storage: "Flight-Recorder Mode, 60 (1-second) records of "Detailed Losses" for each detector. Available for read-back on beam abort. In-Situ System check: On-line check of all detectors, connections and electronics by cycling HV Off/On.

SNS Integrated Control System BLM AFE Configuration

SNS Integrated Control System Beam and Loss Display (Simulated data II)

SNS Integrated Control System LINAC Dose Rate: ** Data is provided by Franz X Gallmeier.

SNS Integrated Control System LINAC Dose Rate (Simulated data) Distance along LINAC  Time 

SNS Integrated Control System Beam Loss Monitors (Commissioning) l Verify BLM Operation (Part of BLM / Diagnostics commissioning plans) l MPS »Measure (Verify) Integration Times (1 % Loss) »Determine Trip Point Limits for each BLM »Determine Radiation Dose Calibration »Calibrate losses in units of W/m »Verify Masking Capabilities (Software masks) »Verify Wire Scanner Masks (BLM Mode masks) l BLM Accounting »Calibrate low loss measurements –Change vacuum by order(s) of magnitude? l See Saeed’s slides from Ring commissioning meeting in Dec and slides from MPS FDR: »

SNS Integrated Control System Commissioning activities l Select device and mask (or desensitize) adjacent devices l Loose beam, verify time response »Log MPS input fault time »Log Front end shutdown time »Verify response time with diagnostics: –Current monitors, analog signal, scope mode –Fast Loss Monitor(s) –BPM Power (Amplitude) l Verify Loss mechanism (Change vacuum, monitor response) l Determine appropriate trip levels for commissioning, operations »Poor vacuum conditions, Energy changes, Tune changes (Instabilities) l Calibrate differential current monitors vs. Beam loss monitors l Identify, Eliminate(minimize) sources of false trips »Beam noise (50 1MHz), Kicker noise, etc.

SNS Integrated Control System Conclusions: 1)SNS expects to maintain losses below 1Watt/meter over most of the Accelerator in order to allow hands-on maintenance. As such the BLM system will play a major roll in commissioning. 2)Important loss mechanisms include gas stripping, magnetic stripping and Halo generation from “mismatches”. We hope to use the BLM system to confirm the models and set the limits for the BLM-to-MPS trip levels. 3)Loss Monitor system will provide signals to the MSP system which are not modifiable by software (a layer of protection). 4)HARPS and specialized edge loss detection diagnostics are under studies but not included in the base-line systems yet.

SNS Integrated Control System

Fast Protect - Latched System l Concentrates Permit Inputs l Latches carrier link in FAULT state to disable beam l Input bypassing allowed with Jumper, Key or PLC l Beam line inputs bypassed by machine mode (event link) l Equipment maintained in locked racks l Documentation control of changes l System verification after changes l When MPS inputs need bypassing for beam studies, Software masking will be available as required. (Masking some devices will need the approval from Radiation safety committee)

SNS Integrated Control System Fast Protect - Latched Inputs l Power supply status (Fault when PS is not ON) l Valve Status (Fault when valve is not OPEN) l LLRF RF Status (Fault when PS is not Enabled) l Target Status »Response should be faster than target shutdown signal. »Time Stamp verifies MPS ACTED FIRST l Dump Status (Fault when all dump sensor not OK) l Loss monitors (High QA chipmunks) l Timing System Status »Ring RF required for IDMP, RING, EDPM, and target modes »Local Oscillator allowed for LDMP, D-plate, and Ion Source modes l PPS Input »PPS search status will latch off beam

SNS Integrated Control System Vacuum Level – MPS trip levels Vacuum Level Requirements SystemDesign ConditioningOperational(1)DocumentTrip FE5x x x10 -6 Front End Systems SRD DTL1x x x10 -6 Linac Systems SRD CCL5x x x10 -7 Linac Systems SRD SCL1x x x10 -8 Vacuum System Interrupts (2) Coupler1x x x10 -7 Vacuum System Interrupts (3) HEBT5x x x10 -7 Ring and Transfer lines (4) Ring1x x x10 -8 Ring and Transfer lines RTBT1x x x10 -7 Ring and Transfer lines (1) Actual trip points can vary and will be set during commissioning. (2) Gate valves close if vacuum > 1x10 -9 longer than 3600 seconds or > ASAP. (3) Inhibit RF and Beam if pressure >10 -8 for 10 seconds, for 1 second, or ASAP. (4) Estimated losses due to H- stripping (50% H  ~ cm 2 /atom, 50% Oxygen, Nitrogen  ~ cm 2 /atom) is 0.3 nA/m at 5x10 -8 Torr. l Vacuum Status – Valve closures operate trip defined below. Integrated vacuum levels produce EPICS Alarms, which could shut off the beam (MPS). MPS trips on VALVE Closure.

SNS Integrated Control System Fast Protect - Latched Inputs l Injection Kickers l Extraction Kickers l Ring RF l Current monitors l HARP – Backup to HQA-MPS l SEM »Possible backup to HARP l Beam Position Monitors »Beam off target/dump violation

SNS Integrated Control System Fast Protect - Latched Inputs l EPICS Alarm Inputs »EPICS Alarms for any PV can trigger latched input on a board level or input signal level. l MPS Verification Software »SNL program verifies jumper settings, Latches beam off in case of discrepancy. l Beam Loss Accounting »Integrated loss sets Alarm, could trip beam l Beam Current Accounting

SNS Integrated Control System

Injection Kicker l 2 Horizontal, 2 Vertical pairs, 8 power supplies l Power supply status inputs to MPS-FPL l Each kicker in a pair should be matched l Fault on unmatched waveforms ? »Run Loss studies on unmatched waveforms. »Sensitivity studies on painting schemes l 2 kHz comparators for Reference and Shunt

SNS Integrated Control System Injection Foil l Foil Failure »Beam Loss Monitors »HARPS »Integrating Current Monitor »Peak Current Monitor »Foil Video monitor l Foil Motion »Low power mode required? (LANSCE allows) »LVDT – Motion range available »Limit Switches l Foil Position »Use Mode Mask to allow beam for BLANK foil position or Phosphorous screen in place

SNS Integrated Control System Ring RF MPS Considerations l RF Power Supply l RF Cavity Field Error Signals l Reflected Power l RF Phase Error monitoring l RF – Beam phase monitoring? l RF Power Ramping (Amplitude modulation?) l Commissioning studies to determine acceptable losses verses RF parameters.

SNS Integrated Control System Ring Collimator MPS Inputs l Temperature sensors l Water Flow l Normal loss monitors? (Dynamic range OK?) l Motion – (Drop to lower beam power?) l Motion out of range (LVDT’s?) l Limit Switches

SNS Integrated Control System Extraction Kicker l “Fast and Slow” Kicker protection will be combined to give MPS one Fault output. (Charging supply status, Kicker Charged, Thyratron supply OK, Filament supply status, temp, flow, etc.) l One MPS signal per kicker. »Allow Operations to mask one kicker out. EPICS App. Does not allow more than one kicker to be masked l Kicker System needs 3 pulses from timing system, Start charge, Stop Charge, and Extract. l False firing – Abort ASAP or synchronous with beam gap. l Storage mode: If kickers are used to abort beam in storage mode additional timing signals are required, charging current goes through kicker magnets (1/e ~1sec), and kickers would need to be masked during storage.

SNS Integrated Control System

High QA MPS Dump, TGT, Window l HQA – Time response, 32 msec (12 msec measured ) »Latched in PLC »Does not rely on Software l Machine Can Take Two Full Pulses l High QA configuration Controls »Hardware normally inaccessible »System Verification, routine testing »Documentation trail »Operational procedures l Redundancy –1 PLC, double up on sensors, use MPS-FPL for redundancy l Redundant shutdown devices

SNS Integrated Control System Control Net Layout

SNS Integrated Control System High QA PPS Inputs and Selection Switches l Personnel Protection System »Linac zone »HEBT Zone »Ring Zone »RTBT Zone »Target Zone l Machine Mode Selection »Ion Source »D-Plate »L_DMP »I_DMP »RING »E_DMP »TGT l Beam Mode Selection »7.5 kW »200 kW »2 MW »10 μsec »50 μsec »100 μsec »1 msec

SNS Integrated Control System High QA Dump, Target PLC Remote Inputs l Target (or Dump) Status »Pressure, Temperature »Flow, Vacuum status l Power supply current monitor’s »Current and Voltage window comparators »Quads – Hi window, Dipoles, Hi and Off windows. »Steering corrector’s – Window (RTBT only) l HARP Status, P-P Permit Signal (Target only, Baseline) l Beam Current Monitor (Not in baseline, Hardware not chosen) »Co-Injection (Pulse-to-Pulse Species Modulation) ? »P-P Pulse Width verification »Beam Power, Integrated Beam Current l Beam Loss Monitor (2 per current monitor)

SNS Integrated Control System Injection Dump inputs

SNS Integrated Control System Target MPS Inputs

SNS Integrated Control System Power Supply Window monitors l Quad (Dipole) Magnet current compared with upper and lower limits, set in PLC Code. Limits determined by Accelerator Physics group. Magnet voltage used as redundant sensor. Commissioning: 1. With any input beam characteristics, quads limit peak current density at window and dump(tgt) below charge density threshold. 2. Upper and lower limits allow tunability from lowest LINAC energy to highest energy. 3. Beam size (density) verified by Wire Scanners and HARPS.

SNS Integrated Control System Power Supply Setting’s – Linac Dump (Data from Deepak)

SNS Integrated Control System Power Supply Setting’s – Linac Dump Window (Data from Deepak) l Problem in this case was percent of beam outside allowable area on dump)

SNS Integrated Control System Harp Commissioning l Target Harp can not operate 1 Yr. Pulse to Pulse l Target Harp is not retractable and is connected to window l Harp will probably survive a few months. l Operating Philosophy »Install set of redundant, retractable HARPS 180º upstream »Commission retractable HARPs with Window HARP »Set comparator limits on Optics »Once a year, verify system HARPS

SNS Integrated Control System Beam Current Monitor l Beam Power on Target (Dump) measurement l Target has maximum charge on target spec l Current monitor used to normalize Harp and WS l Current monitor problems: »Droop (L_DMP, I_DMP) –Use baseline correction for toroids »False signals with beam spray –Use Beam Loss Monitors (2) to monitor loss on toroid core. »Baseline monitors use software –Purchase Bergoz PDCCT or equivalent