Project Overview Flemming Videbaek Brookhaven National Laboratory.

Slides:



Advertisements
Similar presentations
US CMS DOE/NSF Review: May 8-10, US CMS Cost & Schedule Mark Reichanadter US CMS Project Engineer DOE/NSF Review 8 May 2001.
Advertisements

HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
HFT Safety --PXL detector September 26, Dana Beavis.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT Plans for the next year A short report on review results and plans for TPC – Time Projection.
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR PXL Detector Project Status.
L. Greiner1SLAC Test Beam 03/17/2011 STAR LBNL Leo Greiner, Eric Anderssen, Howard Matis, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
L. Greiner 1PXL BNL Safety Review– September 26, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal.
HFT PXL Mechanical July 2010 Howard Wieman LBNL 1.
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR Heavy Flavor Tracker Overview With parameters pertinent to the PXL Sensor and RDO design.
HFT & PXL geometry F.Videbæk Brookhaven National Laboratory 13/9/12.
SSD Ritter Review June 20, 2012 The Silicon Strip Detector an overview and introduction Jim Thomas Lawrence Berkeley National Laboratory.
SSD Operations Manual March 2014 SSD: 4 th layer of vertex detector Heavy Flavor Tracker Silicon Strip Detector – Operations Manual PXL Inserted from this.
LBNE R&D Briefing May 12, 2014 LBNE R&D Briefing May 12, 2014 LArIAT and LBNE Jim Stewart LArIAT EPAG Chair BNL LBNE LARIAT-EPAG J. Stewart BNL T. Junk.
HFT Project Overview CD0 Review H.G. Ritter LBNL.
The STAR HFT PXL system is designed to be inserted in situ. Is housed in 2 large frame aligned with rails inside Inner Detector Support. Inserted from.
Engineering Division 1 Mechanical and Integration CD0 Walkthru, 19-Dec, 2007 Eric Anderssen, LBNL.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
1 Jim Thomas - LBL STAR Inner Tracking Upgrades with an emphasis on the Heavy Flavor Tracker presented by Jim Thomas Lawrence Berkeley Laboratory 11 /
H. Wieman1STAR HFT CD1 Review, BNL, November 2009 STAR HFT PIXEL Detector WBS 1.2 Howard Wieman LBNL.
Performance requirements High-Level Key Performance Parameters (KPP) The high-level KPPs cannot be directly measured without beam. The capability to achieve.
HFT project Overview and Status October 14, 2010 F.Videbaek BNL.
1 Jim Thomas - LBL 4.2 Meters ~ 1 Meter The SSD: March Face to Face Meeting Jim Thomas Lawrence Berkeley Laboratory March 14 th, 2012 The SSD.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
1 Jim Thomas - LBL The Mechanical Integration Challenge for New Tracking Detectors in STAR Jim Thomas 07/10/2006.
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
7/26/2006 Wyatt Merritt 1 DECam Preparations for Critical Decision 2/3a Preparations for CD2 Preparations for CD3a DECam MOUs.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Alexei Fedotov Project Management.
STAR RHIC AGS users meeting, May 30, Star Inner Tracking upgrade F. Videbaek STAR collaboration for the HFT upgrade group.
HFT face-2-face F.Videbaek Brookhaven National Lab.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
HFT project Overview and Status May 11, 2010 F.Videbaek BNL 5/11/20101.
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
1 Jim Thomas - LBL HFT Issues that may Bear on the Fate of the SSD & SVT presented by Jim Thomas 07/07/2006.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
1 STAR HFT Pixel Detector Howard Wieman Lawrence Berkeley National Lab.
HFT DOE Review July 17-18, 2012 The Silicon Strip Detector WBS 1.4 Jim Thomas Lawrence Berkeley National Laboratory SSD.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
G. Contin | The STAR Heavy Flavor Tracker (HFT) and Upgrade Plan Quark Matter 2015 – Kobe, Japan Session : Future Experimental Facilities,
LHC CMS Upgrade Project CD-1 Alternative Selection and Cost Range Steve Webster Federal Project Director August 26, 2013 CD-1 Executive Session.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
2007 Run Update for STAR Jeff Landgraf For the STAR collaboration.
Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs Cost Schedule.
Leo Greiner IPHC1 STAR Vertex Detector Environment with Implications for Design and Testing.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
Heavy Flavor Physics in STAR Flemming Videbæk Brookhaven National Laboratory For the STAR collaboration.
Status of the STAR tracking upgrade Gerrit van Nieuwenhuizen STAR Collaboration Meeting BNL, February 24, 2005.
DOE Review of LARP – Feb 17-18, 2014 DOE Critical Decision Process Ruben Carcagno February 17,
LBNL Eric Anderssen, Leo Greiner, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak, Chinh Vu, Howard Wieman UTA Jerry Hoffman, Jo Schambach.
Jim Thomas - LBL 1 SSD News and Integration Notes Jim Thomas Lawrence Berkeley National Laboratory September 11 th, 2007.
Jim Fast Pacific Northwest National Laboratory
HFT project Overview and Status March 10, 2010
HFT Overview Flemming Videbæk BNL 3/14/12 F2F LBNL.
Project Management W. J. Foyt
Software Overview S. Margetis Kent State University HFT CD0 Review.
Face to Face Meeting – March 2012 Sarah Morgan
Preparations for a Lehman Review
Preliminary Project Execution Plan
Presentation transcript:

Project Overview Flemming Videbaek Brookhaven National Laboratory

Overview Project Overview and scope definition –High level technical overview Baseline Project –Deliverables –CD-4 Key Performance parameters –Cost and Schedule, Milestones –Funding Profile, contingency Management –Organization –Reporting, Tracking and project controls Risk Management –Risk Management Plan –Risk registry Readiness for CD-2/3 –Design Status 7/13/ DOE HFT Review

DETECTOR OVERVIEW 7/13/2011DOE HFT Review 3

STAR detector STAR is an existing detector that has operated for 11 years at RHIC. HFT is an upgrade to the inner tracking system of STAR 7/13/2011DOE HFT Review 4

The fine spatial resolution of the tracker will allow direct topological identification of parent particles with very short lifetimes from decays of heavy quarks, such as the D 0 and D* meson and the  c baryon. In addition, the HFT will allow exclusive and inclusive reconstruction of charm and bottom semileptonic decays. HFT Definition 7/13/ DOE HFT Review TPC – Time Projection Chamber (main tracking detector in STAR) HFT – Heavy Flavor Tracker SSD – Silicon Strip Detector r = 22 cm IST – Inner Silicon Tracker r = 14 cm PXL – Pixel Detector r = 2.5, 8 cm

MSC Pixel Insertion Tube Pixel Support Tube IDS East Support Cylinder Outer Support Cylinder West Support Cylinder PIT PST ESC OSC WSC Shrouds Middle Support Cylinder Inner Detector Support 7/13/2011DOE HFT Review 6 Carbon Fibre Structures provided support For 3 inner detector system. All systems highly integrated into IDS E.Anderssen LBL mech engineer D.Beavis, BNL subsystem manager

Cross section View Outside inside tracking with graded resolution. The two inner layers tracking to vertex determines the requirements to PXL. 7/13/2011DOE HFT Review 7 50 cm Beampipe SSD IST Pixel Detector TPCSSDISTPXL ~1mm~300µm~250µm vertex <30µm

PXL Detector Subsystem Mechanical support with kinematic mounts (insertion side) Insertion from one side 2 layers 5 sectors / half (10 sectors total) 4 ladders/sector Aluminum conductor Ladder Flex Cable Ladder with 10 MAPS sensors (~ 2×2 cm each) carbon fiber sector tubes (~ 200µm thick) 20 cm Subsystem manager L. Greiner 7/13/2011DOE HFT Review 8

Intermediate Silicon Tracker subsystem Intermediate tracking layer with good r-phi resolution 250mm Conventional Si strip detector using CMS APD chip for ladders Readout system copy of just completed FGT detector system Subsystem manager Bernd Surrow. Talk by G. v Nieuwenhuizen, MIT 7/13/2011DOE HFT Review cm long ladders at 14 cm radius.

Silicon Strip Detector The ladders and Si-sensors is an existing detector. Upgrade readout system with new ladder cards on detector, RDO cards, and cooling system Subsystem manager: Jim Thomas, LBL 7/13/2011DOE HFT Review 10 LaddersLadder Cards

Project Chronology The Inner vertex tracking upgrade identified as a critical component soon after the start of RHIC and developed into proposal and R&D projects within STAR. Reviewed by BNL Detector Advisory Committee and included in the RHIC detector upgrade mid-term plan Reviewed by BNL Technical Advisory Committee 2008 – pre-CD-0 review 2009 – CD-0 approval - pre-CD-1 review 2010 – CD-1 approval 7/13/2011DOE HFT Review 11

BASELINE PROJECT 7/13/2011DOE HFT Review 12

HFT consists of 3 sub-detector systems inside the STAR Inner Field Cage (IFC) –Pixel Detector (PXL) – 2 layers Removable detector system with insertion mechanism. –Intermediate Silicon Tracker (IST) 1 layer –Silicon Strip Detector (SSD) 1 layer Detector resides in a Inner Detector Support (IDS) that is integrated with the Forward Gem Tracker (FGT) that will occupy West end of the IFC. Online software Not an HFT deliverable but required for integration is a new small diameter beam-pipe (procurement outside project scope) Not an HFT deliverable, but required for physics analysis is offline software. The development is coordinated by the project HFT Detector and Deliverables 7/13/ DOE HFT Review

Performance requirements High-Level Key Performance Parameters (KPP) The high-level KPPs cannot be directly measured without beam. The capability to achieve these parameters can be demonstrated at CD-4 through the measurement of the low-level KPPs plus simulation studies using the full STAR detector simulation package and analysis software. 7/13/ DOE HFT Review

Low-level CD-4 KPPs experimentally demonstrated before installation: 7/13/ DOE HFT Review The achievement of the low-level KPPs will be proven through bench tests, survey measurements and the meeting of design specifications (Appendix A of PEP) Will be addressed in sub-system talks Parameters can be demonstrated and documented before final assembly and installation of HFT in the STAR detector.

HFT project deliverables 3 Si detector systems –PXL sectors, insertion mechanism and spare sectors, sensors and electronics –IST ladders with si, readout system, and spares –SSD upgraded electronics, cooling Global support structures for the 3 detector system integrated into the STAR detector Online and control software The details are listed in PEP 7/13/2011DOE HFT Review 16

Schedule considerations PXL detector can be inserted into STAR in one-day, once the small diameter beam-pipe is integrated with IDS IST and SSD can only be installed during RHIC shutdown periods and requires roll-out of STAR. This period is not always fixed in a given year, but is typically July-November The 3 subsystems will be fabricated, assembled and tested on their respective support cylinder (PXL/PST), (IST/MSC) and (SSD/OSC). This stage allows for verification of most low level KPPs. The final assembly of the detector subsystems into the complete HFT instrument will be done when STAR can be rolled out. The project schedule allows one year for this activity, while the EF schedule calls for this in fall of Following such assembly 6 months is allocated for final close- out preparations. 7/13/2011DOE HFT Review 17

Considerations II An engineering run with pre-production PXL ladders for run-13. –The engineering run will assess open issues for the PXL sub-system, and help in retiring project risks ahead of the final assembly. The Forward Gem Tracker (FGT) is highly integrated with IDS, and imposes constraints on space envelopes for HFT detectors and IDS stability requirements (E.A. talk) 7/13/2011DOE HFT Review 18

Summary Schedule 7/13/2011DOE HFT Review 19

Level 1 and 2 Milestones High level (L2)reportable technical milestones in support of CD milestones The schedule has additional distributed L3 milestones to track each subsystem. 7/13/2011DOE HFT Review 20 LevelMilestonePlanned Actual/Forecas t 1CD-0 Approve Mission Need 2/18/09 (A) 1CD-1 Approve Alternative Selection and Cost Range 8/31/10 (A) 1CD-2 Approve Performance BaselineQ4FY11Aug-11 1CD-3 Approve Start of FabricationQ4FY11Aug-11 1CD-4 Approve Project CompletionQ3FY15Jun PXL 2PXL Prototype Sector Design Complete 12/15/10 (A) 2Receive Prototype sensors from IPHC 3/15/11 (A) 2Prototype PXL Insertion mechanism Testing CompleteQ1FY12Sep-11 2Final PXL Sensors receivedQ1FY13Oct-12 2Production Sector Assembly StartQ2FY13Feb-13 2PXL detector available for insertionQ1FY14Jun IST 2Sensor design FinishedQ1FY12Jul-11 2Prototype ladder testedQ2FY12Dec-11 2Flex hybrid producedQ3FY12Feb-12 2First staves producedQ4FY12Jun-12 2Staves finalizedQ2FY13Nov-12 2IST assembled onto MSCQ4FY13Mar SSD 2Prototype Ladder Board design finished 10/15/10 (A) 2RDO Prototype Board design finishedQ1FY12Jul-11 2Preproduction Design Review of RDOQ3FY12May-12 2Production of Ladder Boards ready to beginQ1FY13Nov-12 2SSD assembled on OSC ready for installationQ1FY14Sep Integration 2Production OSC/MSC at BNL for IntegrationQ4FY12Jun-12 2Inner detector support assembled with SSD/IST and FGTQ1FY14Sep-13 2HFT Installed and Integrated into STARQ1FY15Dec-13

Cost Baseline 7/13/2011DOE HFT Review 21

Funding Profile Profile as of CD-1, and in PEP Redirects are included under WBS 1.1 7/13/2011DOE HFT Review 22

HFT MIE Cost/Budget Profile 7/13/2011DOE HFT Review 23 Contingency

MANAGEMENT 7/13/2011DOE HFT Review 24

HFT Org Chart 7/13/2011DOE HFT Review

HFT management 7/13/2011DOE HFT Review 26

1.1 Management –Management, oversight, ESSH/QA and reporting of the project. 1.2 Pixel detectors – Leo Greiner, LBL –Howard Wieman, LBL –Sensors, readout systems and mechanical support, insertion mechanism, services 1.3 IST detector – Bernd Surrow, MIT –Gerrit van Nieuwenhuizen,LBL –Sensors, readout system ladder support,services 1.4 SSD detector – Jim Thomas, LBL –Michael LeVine, BNL –Upgrade to the readout electronics of the SSD, and services. 1.5 Integration and Global structures– Dana Beavis, BNL –Eric Anderssen LBL ( deputy engineer) –Global support structures, Interfaces to STAR, Safety 1.6 Software – Spiros Margetis, Kent State –Development and commissioning of Online software –Coordination of STAR offline effort for HFT (not deliverable) WBS Organization 7/13/2011DOE HFT Review 27

Reporting & Communication High Level –Project Assessment and Reporting System (PARS II) updated on a monthly basis by the Federal Project Director (Lloyd Nelson, BNL site office) –Contractor Project Director provides a monthly report to FPD, a monthly teleconference is held with DOE HQ –The CPD provides quarterly reports to DOE using inputs from subsystem managers and BNL management, and a quarterly telecon is held –Annual progress reviews with outside experts will be conducted by DOE (NP) 7/13/2011DOE HFT Review 28

Reporting & Communication Weekly –Meetings with FPD weekly, or as needed. –Technical committee (Management issues, progress reports) –Hardware group meeting (PXL, IST, SSD) –Integration team (sometimes bi-weekly) Members from HFT, FGT projects and STAR operations group. –Software group –SSD sub-system (bi-weekly) includes engineering participation from Subatech, Nantes. Bi-monthly project meetings Monthly –progress report to Collaboration (STAR management) As often as needed - Management team will conduct design reviews and technical progress reviews on a regular basis Regular telecons - LBNL-IPHC, yearly face-to face meetings 7/13/2011DOE HFT Review 29

Institutional Organization Participate in the fabrication of deliverables for the HFT. BNL is the lead institution. 7/13/2011DOE HFT Review 30 Brookhaven National LaboratoryBNL Institut Pluridisciplinaire Hubert Curien, Strasbourg, France IPHC Kent State University KSU Laboratory for Nuclear Science, Massachusetts Institute of Technology, Cambridge MIT-LNS Lawrence Berkeley National LaboratoryLBL SUBATECH, Ecole des Mines, Nantes, France SUB University of Texas, Austin UT

MOUs MOUs between BNL/HFT and the collaborating institutions that provide project deliverables describe the expected efforts of on-project, redirected and scientific labor, summarizing people (names/category) and their anticipated FTE fraction of activity related to tasks at the WBS level 2 or 3. For LBL and MIT the yearly Statement of Work will detail the required funding, tasks, deliverables, and personnel. Drafts MOUs available in review documentation –Subatech (signed January 2010) –IPHC (signature in progress) –MIT, LBNL, UT, KSU and BNL STAR group 7/13/2011DOE HFT Review 31

RISK MANAGEMENT 7/13/2011DOE HFT Review 32

Risk Management The Risk Management Plan (RMP) The risk assessment has been performed by subsystem and reviewed with management. The sub-system manager used the risk matrix to evaluate moderate and high risk project items. Risk are also reflected in the applied contingency analysis Risk list is available for reviewers. 7/13/2011DOE HFT Review 33

High Risks A few high level risk for PXL has been retired though early prototyping and tests –Cooling –Sensor development Mechanical risk IDS are becoming low, due to fabrication of WCS(FGT) and ESC prototype. Most risk are related to schedule, and are at low to moderate impact 7/13/2011DOE HFT Review 34

Documentation Status Since CD-1 review: Updated PEP according to DOE order 413.3B Updated Risk Management Plan, and reviewed risk list pHAD updated NEPA determination (categorical exclusion) Technical Design Report Responded to DOE CD-1 recommendations Updated Basis of Estimate Updated bottom up analysis of Cost & Schedule 7/13/2011DOE HFT Review 35

READINESS 7/13/2011DOE HFT Review 36

Design Status Subsystem talks will demonstrate project readiness in detail. Due to the extensive period of R&D and work since CD-0/CD-1 reviews, the engineering design and prototyping are very advanced, and efforts are turning toward fabrication planning. This includes pre-production and testing before final fabrication. 7/13/2011DOE HFT Review 37

Design Status Design is well advanced –Ultimate PXL design and readout large complete –Design nearly done for PXL mechanics and prototyping for critical insertion mechanism underway for testing in July. –IST sensor and hybrids design done; prototype ladders to be produced shortly. –SSD Ladder Board and RDO board progressing well. –Inner Detector Support design complete 7/13/2011DOE HFT Review 38

Design Reviews so far 2011 IST sensor design Review, BNL January 26 sites.google.com/site/istprototypereview/ ; final review reportsites.google.com/site/istprototypereview/repor 2010 PXL sensor Review BNL December 6,7 html html PXL RDO and sensor review at LBL June Inner Detector Support requirements meetings and review. March and May HFT overall design review. March BNL 7/13/2011DOE HFT Review 39

Summary Designs and prototyping nearly complete, ready for first fabrication. Schedule is integrated, costs documented and managed as a whole. Risks are being addressed and managed, several high level ones have been addressed early. The Project is ready for CD 2/3 7/13/2011DOE HFT Review 40

Backup Slides 7/13/2011DOE HFT Review 41

Change Control Thresholds DOE-SC-26 DOE-BHSOHFT Associate DirectorProgram ManagerFederal Project DirectorContractor Project Director (Level 0)(Level 1)(Level 2) (Level 3) Scope Any change affecting Mission Need Any change affecting CD-4 deliverables N/A Any change not affecting CD- 4 deliverables CostAny increase in TPC Any change to TEC or OPC, or cumulative allocation of ≥ $500k contingency A cumulative increase of ≥ $250k in WBS Level 2 elements, or cumulative allocation of ≥ $250k contingency Any increase of ≥ $50k in a WBS Level 2 element ScheduleAny delay in CD-4 date ≥ 3 months delay of a Level 1 milestone date (other than CD-4), or ≥ 6-month delay of a Level 2 milestone date ≥ 3-month delay of a Level 2 milestone date ≥ 1-month delay of a Level 2 milestone date, or ≥ 3-month delay of a Level 3 milestone date 7/13/2011DOE HFT Review 42

WBS definition 7/13/2011DOE HFT Review 43

Collaboration and Responsibilities BNL –Project management, integration, safety, SSD electronic upgrade LBL –PXL detector, PXL readout, Global support, SSD, integration, management MIT –IST detector IPHC –Sensor development SUBATECH –Engineering for SSD readout UT –PXL readout, PXL telescope beam test Kent State, UCLA, Purdue, NPI, CTU, USTC - Software development as part of calibration, offline needs. 7/13/2011DOE HFT Review 44

Risk Analysis Matrices 7/13/2011DOE HFT Review 45

Labor resources On-Project labor is defined as the technical and engineering effort associated with R&D, preliminary/final design and engineering, fabrication, and assembly, and project management. Scope included in the work breakdown structure Cost included in the HFT TPC and is funded within R&D and MIE funds Redirected labor is associated with design, engineering, fabrication, and assembly efforts and refers to engineers and technicians already funded. Decreases the amount of new funds needed to implement the project Scope included in the work breakdown structure under 1.1 Cost included in the HFT TEC, funded by DOE Program Scientific labor is supporting the overall development and operational capability of the HFT detector within the STAR experiment, including software and physics analysis models. Scientific labor cost is not included in the HFT TPC Scope integrated with the HFT project schedule 7/13/2011DOE HFT Review 46

Schedule Highlights Each sub-system completes Q4FY13. Assembly and integration with IDS thereafter, instrument completely assembled during subsequent RHIC shutdown. 7/13/2011DOE HFT Review 47

HFT Definition 7/13/2011DOE HFT Review 48

MSC Pixel Insertion Tube Pixel Support Tube IDS East Support Cylinder Outer Support Cylinder West Support Cylinder PIT PST ESC OSC WSC Shrou ds Middle Support Cylinder Inner Detector Support Structures Exploded Detail 7/13/2011DOE HFT Review 49

Nomenclature Detectors PXL pixel subsystem IST Inner Silicon Tracker SSD Silicon Strip Detector Structures IFC STAR TPC inner field cage IDS Inner Support Structure WCS,ESC West and East Cone Structure OSC Outer Support Cylinder FGT Forward GEM Tracker (independent upgrade) 7/13/2011DOE HFT Review 50