IMC PHASE III PROPOSAL Presented by IMC/LIBRARY/LEARNING RESOURCES DEPARTMENT Submitted on October 18, 2004.

Slides:



Advertisements
Similar presentations
Teaching and Learning Center Title V Impact Created a training classroom so that instructors may explore the newest technology available for them.
Advertisements

10,000 Issues Testing In a Tough Economy Jonathan Miller Director, Global Channel Sales & Development Pearson VUE Ryan Ulwelling Manager, Global PVTC Selects.
Student Lab Management IT Services March Our Purpose this evening … o Foster good communication o Improve Relationships and Collaboration o Prepare.
A walk through the world of Help Desk. When you realize you need help with your computer, phone, or printer, and your supervisor can not help, please.
IT Information for Graduate Students. IT Department Personnel – Dennis Brown (1113 Fifield, M-F, 8am until 5pm, other times via
Calvary Christian School Technology Roadmap. Technology at Calvary School (Vision) Using information technology, CCS endeavors to enhance the educational.
Planned Moves, Changes, Issues Library Administrative Council All-Staff Meeting September 10, 2013.
York College Library There are two entrances to the York College Library, both on the third floor; one on the G wing and one on the H wing of the Academic.
Video Streaming in the Lee Library Present and Future.
At Lewis Field Glenn Research Center Technical Information, Administrative, and Logistics Services (TIALS) 5.0 Library Building 60 Library Services, part.
MV Planning Process Information Gathering Referal to Subcommittee(s) Recommendations.
Lesson 1-Introducing Basic Network Concepts
IT Information for Graduate Students. IT Department Personnel – Dennis Brown (1253, M-F, 8am until 5pm, other times via
Florida International University Digital Resources Advisory Group October 11, 2006 Maps Imagery and Urban Services (MIUS)
Technology Lab Management Strategies Who do I see? Staff Members – Sign up with the Media Specialist to use room. Community Members – Sign up the.
A UDIO V ISUAL T ECHNOLOGY S ERVICES. LOCATION:Marlboro Hall Room 2066 (2nd floor across from classroom M2068) RESERVATION/SERVICE COUNTER
Telehealth Needs Assessment Report June 2007 Presented by Kandi Thomas/Telehealth Assistant.
Bassam Hammo (Ph.D) Department of Computer Information Systems King Abdullah II School for Information Technology Jordan University Amman Jordan e- mail:
ITS Who we are and what we do! A roadmap to service September 2011.
Information Technology Services Technical Support Services Summer 2009 Accomplishments Fall 2009 Current Projects.
Technology UAA. Who We Are & What We Do IT Services provides technology leadership, planning, and a wide range of services supporting UAA’s.
B.E.S.T. Academy Ruben L. Barkley MEDT 6461 Summer 2008 Media Center Floor Plan.
70-293: MCSE Guide to Planning a Microsoft Windows Server 2003 Network, Enhanced Chapter 14: Problem Recovery.
❧ Reposition Library Technology Support Services to Take Leadership Role on Campus in Developing Students' Technology Skills By Amy Jiang Library Technology.
November 2009 Network Disaster Recovery October 2014.
Technology Plan for Bond (2004 –2014) Jon Storslee.
Pro Imager A complete image and workflow management solution for the professional lab.
School Technology Solutions, LLC Technology Audits What's in it for you? 4 th Annual SW/WC Technology Conference March 11, 2010 Presenter: Lee Whitcraft.
Welcome to the Rich Central Media Center Welcome to the Rich Central Media Center
Help Desk A walk through the world of Help Desk. Realizing you need help When you realize you need help with your computer, phone, or printer, and your.
New Teacher Technology Training. Technology Notebook
PM_WO_310 Components v41 PM Components PM_WO_310.
OPES Media Center Our Media Center is approximately 2,000 square feet including a teacher workroom, two AV production rooms, two offices and two storage.
April Rogers ITEC 7132 Fall  The school serves over 1600 students who come from a variety of cultural backgrounds.  Table 1: Table 1 shows the.
Cornell 18,000 students 2,000 faculty Twelve colleges on Ithaca campus Four are state colleges, eight are private (including grad school and school of.
Welcome to New Teacher Orientation Welcome to New Teacher Orientation Ashley Ridge High School Media Center.
Copyright © Curt Hill Components and Artifacts Network and Infrastructure.
Natick Public Schools Technology Update January 14, 2008 Dennis Roche, CISA Director of Technology.
Chapter 16 Designing Effective Output. E – 2 Before H000 Produce Hardware Investment Report HI000 Produce Hardware Investment Lines H100 Read Hardware.
State of Technology Sultan School District Thank You Thank you to the Board of Directors and the Superintendent for always supporting the need for.
Diamond Lakes Elementary School The front of the building. The main office is to the left of the front door and the media center is to the right. Patricia.
Service Request Desk How we can help each other, help each other.
Center for Instructional Technology Selected Resources.
Teaching and Learning with Technology ck to edit Master title style  Allyn and Bacon 2002 Teaching and Learning with Technology k to edit Master title.
Technology and the “New Normal” at Winona State University Thriving in a world of continuous change Technology Fee Presentation Student Fee Management.
Student Services Moreno Valley Campus Phase III. One Stop Student Services.
Capstone ISTC 601- Library Administration The New and Improved White Oak School Library Erin Moyer May, 2013.
Multimedia Lab Design Proposal By Eric Taylor. Purpose The purpose of this lab is to equip students with hardware and software capable of performing professional.
1 Computing Support of Instruction Dr. H.E. (Buster) Dunsmore Purdue University Department of Computer Science PowerPoint slides.
Learning Resource Center Carolyn C. Oakley, Director.
VIDEO CONFERENCING P repared by Reshma Chandran Optional: English Class no :14 S N T C Nedunganda.
Staff Assessment Technology Services Department Palmyra Area School District.
At Lewis Field Glenn Research Center Technical Information, Administrative, and Logistics Services (TIALS) 3.0 Publishing Services Publishing provides.
Information Technology Support Services Focusing on our customers 1.
Audio Visual Department Channel 99 FY2015 Budget.
MSB Network Orientation. Basics Welcome from the MSB Tech Center Tech Center Staff – 13 Permanent – 30+ Students Serve MSB Only – 3200 Users.
Service Desk Good Practice Guide – Benchmarking survey results January 11 th 2012.
IT Information for Graduate Students
CAFCO-Cincinnati Air Filter Sales & Service
Information Technology (IT)
South Shore Vocational Technical High School
IT Information for Graduate Students
How to Create a Profitable Service Center
Prepare Cisco with Valid Dumps Dumps4download.co.in
Electronic Medical Records Training
LO3 – Understand Business IT Systems
IT Information for Graduate Students
IT Information for Graduate Students
Bethune Elementary device roll out
Presentation transcript:

IMC PHASE III PROPOSAL Presented by IMC/LIBRARY/LEARNING RESOURCES DEPARTMENT Submitted on October 18, 2004

IMC PHASE III SPACE PROPOSAL INTRODUCTION The IMC Moreno Valley has outgrown its present space and as a result the IMC is limited with the number of services it can successfully provide to the Moreno Valley Campus. Some of the rooms detailed in this proposal have specific individual needs like: Separate Climate Control, Back-up Power – UPS or Generator, Independent Alarm Control, Independent Building Access, Specific Network Configuration, and Sufficient AC Load for specified locations. Specifications are detailed on each room sheet. JUSTIFICATION The spaces that are currently needed in the IMC are: Video Conferencing Rooms The use of video conferencing technology in the district has grown over the past few years. Presently there is no dedicated Video Conferencing Room available on the Moreno Valley Campus. All meeting rooms are on a first come first served basis making scheduling of video conferences very difficult. Having dedicated video conferencing space would easy the scheduling process. Convergence Center Presently no designated space is available for faculty and staff to have access to presentation technology. The Convergence Center will be a place set aside for access to Digital Photography, Digital Video Editing Workstations, Converting Analog Materials to Digital, Photo Editing, Color Printing and Scanning. Workstations would also be available for creating dazzling PowerPoint Presentations. Server Room Servers play a huge role in supporting the Academic needs in resource access. Streaming Videos can be stored on a server making local access faster. Streaming videos can be downloaded from the Riverside Server overnight for access in the morning to classroom at Moreno Valley Campus. KRCC can air programs off a server and can utilize remote access technology, making trouble shooting easier during off hours reducing the amount a time KRCC is off air should a technical problem occur.

Tech Support Office Presently growth space does not exist in the IMC. The IMC is already in need of additional support staff. Should new staff come on board today…we have no place to put them. We have no place for a technician to sit and troubleshoot media equipment or handle daily tasks of supporting the day-to-day operation of the IMC. EDITING ROOM Presently an editing workstation shares the same space with KRCC and equipment storage. If equipment is need for delivery and a technician is working on the editing workstation, the person working on the workstation would have to get up move his chair so the equipment can be rolled out of the room. This is not a good working environment for editing. AV DELIVERY OFFICE In order for an IMC technician to pre-stage an AV request for delivery, the tech would have to stage the equipment in the office where the phones are answered and guests come asking for assistance. There is no place available for a technician to sit to review the request and prepare his pull sheet for equipment needed for a set-up. CHECK-IN The area is needed for technician to stage equipment that is going out on deliveries. This same area can be used to check-in equipment that returning from a delivery or will-call return. Check-in is also used for when new equipment is delivered so it can be sorted and inventoried. CLOSING COMMENTS: The spaces listed in this proposal not only benefit the IMC, they also benefit the entire Moreno Valley Campus. By having additional space allows the IMC to better serve the Moreno Valley Campus and creates a better environment for planning and meeting the needs of a rapidly growing campus community. Note: The space currently occupied by the IMC will revert back to the Library and will be used as a word processing lab and other important library functionalities.

ROOM LIST AV VIDEO CONFERENCE ROOM SQ FT AV VIDEO CONFERENCE ROOM 2210 SQ FT SERVER ROOM 390 SQ FT IMC TECH OFFICE187 SQ FT KRCC BROADCAST CENTER286 SQ FT AV DELIVERY OFFICE/STRM/CHECK-IN819 SQ FT CONVERGENCE CENTER390 SQ FT TECH SUPPORT OFFICE286 SQ FT EDITING ROOM140 SQ FT TOTAL SQ FT 2918

AV Conference Room 1 – 210 sq.ft 15’ 14’ Room Requirements: ELECTRICALNetwork ConnectionFIBER ISDN ConnectionCoax CableDigital Phone Line Analog Phone Line

AV Conference Room 2 – 210 sq.ft 15’ 14’ Room Requirements: ELECTRICALNetwork ConnectionFIBER ISDN ConnectionCoax CableDigital Phone Line Analog Phone Line

STOREROOM CHECK-IN DELIVERY OFFICE 39’ 21’ AV DELIVERY OFFICE/CHECK-IN/STORAGE – 819 SQ FT Shelves units required for Store room

EDITING ROOM – 140 SQ FT ’ 10’ ROOM REQUIREMENTS: AC UNIT for room Security Door FURNITURE: 1.Winsted Editing Workstation 2.Equipment Rack 3.Desk w/overhead hutch 4.Winsted Video Tape Storage Room Requirements: ELECTRICALNetwork ConnectionFIBER ISDN ConnectionCoax CableDigital Phone Line Analog Phone Line

CONVERGENCE CENTER – 390 SQ FT 26’ 15’ Stand-up Counters w/laminator,paper cutter Lettering machine Faculty Workstations w/computers & scanners Camera Copy Stand PhotoShop and Premeire Editing Workstations Trash Can Network Printer Room Requirements: ELECTRICALNetwork ConnectionFIBER ISDN ConnectionCoax CableDigital Phone Line Analog Phone Line

IMC SERVER ROOM – 390 SQ FT 26’ Back-up Server Power To KRCC 15’ Room Requirements: ELECTRICALNetwork ConnectionFIBER ISDN ConnectionCoax CableDigital Phone Line Analog Phone Line

IMC TECHNICIAN OFFICE 187 SQ.FT. 13’ 14’ Room Requirements: ELECTRICALNetwork ConnectionFIBER ISDN ConnectionCoax CableDigital Phone Line Analog Phone Line

22’ 13’ KRCC BROADCAST CENTER – 286 SQ FT - Exterior Door/ Security Grade - Separate Air Condition Unit Able to Operate 24/7 Room Requirements: ELECTRICALNetwork ConnectionFIBER ISDN ConnectionCoax CableDigital Phone Line Analog Phone Line

TECH SUPPORT OFFICE – 286 SQ FT 22’ 13’ Room Requirements: ELECTRICALNetwork ConnectionFIBER ISDN ConnectionCoax CableDigital Phone Line Analog Phone Line