Adam Jansen Digital Archivist Washington State Archives ISB Presentation Status Report for Digital Archives.

Slides:



Advertisements
Similar presentations
ImageNow at LaSalle University Julie Riganati
Advertisements

Michael Marcinkevicz Director. IT Mission Provide reliable & secure IT systems for the business units of ASC, Increase operating efficiencies with new.
Cloud computing is used to describe a variety of computing concepts that involve a large number of computers connected through a real-time communication.
Real Estate Project Regulation and Licensing Department Closeout Certification Meeting July 20, 2012 Lori Hewig, IT Director David Martinez, Project Manager.
Washington State Digital Archives Presented by: Adam Jansen Digital Archivist Washington State Archives
George W. Bush Presidential Library Electronic Records Alan Lowe April 24, 2012.
IT Project Management, Third Edition Appendix A1 Appendix A: Guide to Using Microsoft Project 2002.
Transformations at GPO: An Update on the Government Printing Office's Future Digital System George Barnum Coalition for Networked Information December.
ARCHIVE IMAGING SEARCHABLE VIA THE WEBPAC Marthie de Kock The Hong Kong Institute of Education 9 December 2002.
Right of Way Training Conference Project Update for the as of October 12, 2006 Right of Way Data Management System (RWDMS)
Dartmouth PKI Deployment Robert Brentrup PKI Summit July 14, 2004.
Technology Steering Group January 31, 2007 Academic Affairs Technology Steering Group February 13, 2008.
Uniqueness of user names is enforced Customer information logged to database Require contact information as well as address address will.
Technology Steering Group January 31, 2007 Academic Affairs Technology Steering Group February 13, 2008.
Digitization Projects: Internal Development vs. Outsourcing Production or D.I.Y. vs. The Pros.
0-1 Team ?? Status Report (1 of 3) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team 1: Auraria.
Effort in hours Duration Over Weeks Or Months Inception Launch Web Lifecycle Methodology Maintenance Phases Copyright Wonderlane Studios.
Services Flexible Workstyle and People-Centric IT Windows Accelerate: Deployment Windows 8.1 Proof of Concept (Window 8.1 PoC) will demonstrate how the.
South Carolina Information Technology Directors Association September 8, 2008 Bill Henry, Matt Guzzi SC Department of Archives and History.
Harvard’s Digital Repository Service (DRS) Architecture Harvard University Library (HUL) Andrea Goethals, Randy Stern December 10, 2009.
National Finance Center’s 2008 Customer Forum EmpowHR 9.0 Billy Dantagnan Teracore.
Basel Accord IITRANSITIONSERVICES Business Integration Support FCM Management Limited Paris New York Toronto.
November 2009 Network Disaster Recovery October 2014.
Financials – Phase II Kick-Off Meeting September 11, 2008 Brenda Bolander, State Comptroller Michael Grisser, Project Manager.
BeechTek – Computer/Server/Wireless/Datacenter Hosted Business Management Software Solutions Web Hosting + Domain Search and Registration Printer Repair.
Server Virtualization: Navy Network Operations Centers
Archivists’ Toolkit: Overview and Demonstration Arwen Hutt Metadata Specialist University of California, San Diego.
Surveyors Conference Project Update for the as of March 2007 Right of Way Data Management System (RWDMS)
City of Seattle Office of the City Clerk Open Government = Access Challenges and Opportunities with Digital Records.
MSS Technologies and the AIIM Grand Canyon Chapter present: Electronic Document Management System Needs Analysis.
CAA/CFA Review | Andrea Laruelo | ESTEC | May CFA Development Status CAA/CFA Review ESTEC, May 19 th 2011 European Space AgencyAndrea Laruelo.
Persistent Digital Archives and Library System (PeDALS) SC Department of Archives and History.
IT Update Sally Waselik June 2005 IOC meeting. IT Vision - “We Deliver Quality Solutions For Our Customers” 2 Today l Level of Service Concepts l IT Enterprise.
Virtualizing and Centralizing Network Infrastructure at a Decentralized Federal Statistical Agency Elvera Gleaton Joseph.
State of the Enterprise Content Management (ECM) Project February 25, 2008.
Module 9 Planning a Disaster Recovery Solution. Module Overview Planning for Disaster Mitigation Planning Exchange Server Backup Planning Exchange Server.
Project 2003 Presentation Ben Howard 15 th July 2003.
Archivists’ Toolkit: Introduction March 12, 2007 Jody Lloyd Thompson.
DLT Update Mairéad Martin June 28, DLT Infrastructure 1.Annual Lifecycle –170 DLT public workstations; 200 Library workstations, laptops, 17 printers.
CSI-MAXIMUS, Inc CSI Comprehensive Service & Support Implementing the CSI Way.
Dartmouth PKI Update Robert Brentrup Internet2 Member Meeting April 21, 2004.
Presentation to the Information Services Board March 6, 2008 Bill Kehoe, Chief Information Officer Bill Kehoe, Chief Information Officer.
Archiving Solutions Software vs. Hosted vs. Appliance Based.
ECM and Shared Services Overview AITR Meeting April 23, 2009.
CIT 470: Advanced Network and System AdministrationSlide #1 CIT 470: Advanced Network and System Administration Disaster Recovery.
CLASS Information Management Presented at NOAATECH Conference 2006 Presented by Pat Schafer (CLASS-WV Development Lead)
06-1L ASTRO-E2 ASTRO-E2 User Group - 14 February, 2005 Astro-E2 Archive Lorella Angelini/HEASARC.
National Archives and Records Administration Status of the ERA Project RACO Chicago Meg Phillips August 24, 2010.
1 expect the best Lemuel C. Stewart, Jr. Chief Information Officer of the Commonwealth Information Technology Investment Board September.
25 April Unified Cryptologic Architecture: A Framework for a Service Based Architecture Unified Cryptologic Architecture: A Framework for a Service.
BA370: What It Takes To Provide IT Services To COB August 1 st 2005 Presented By Alan Sprague Senior Systems Engineer College of Business Oregon State.
Illuminating Britelite’s Internal Services for Success Strategy for Process Improvement.
TIRED OF TYPING?. Key Values Capture data automatically – No more typing Digital approval workflow Automatic matching to purchase orders Approve invoice.
Realizing and Operating Enterprise Systems. Objectives  Outline the realization phase  Discuss transition approaches  Describe enterprise system operations.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
1 Sean Aluoto Anthony Keeley Eric Werner. 2 Project Plan Overview Project Lifecycle model Time line Deliverables Organization plan Risk management Design.
Waste Management Inspection Tracking System (WMITS)
April 11-12, 2005 Methodology in a Box™ For Citrix® Presentation Server 4.0 Douglas A. Brown President DABCC, Inc.
Accounting systems design & evaluation 9434SB 18 March 2002.
AMI System Status Report December 11, Project Objectives Selection, p rocurement and implementation of an AMI System that: Provides automated meter.
City of Hyattsville City Council IT Briefing October 19, 2015 dataprise.com | #ITinRealLife.
A Solution for Maintaining File Integrity within an Online Data Archive Dan Scholes PDS Geosciences Node Washington University 1.
Right of Way Data Management System (RWDMS)
Committee on Information Technology Planning and Budget Sub-Committee
State of the Enterprise Content Management (ECM) Project
STATE OF NEW MEXICO STATE PERSONNEL OFFICE (SPO)
InLoox PM Web App product presentation
AB&DR Committee Report
Contract Management Software 100% Cloud-Based ContraxAware provides you with a deep set of easy to use contract management features.
Presentation transcript:

Adam Jansen Digital Archivist Washington State Archives ISB Presentation Status Report for Digital Archives

Project Status Highlights Project on Schedule and Under Budget Oct 4 th Grand Opening Phase one complete Dec 30 th. Microsoft/EDS developing web interface and database backend Network Hardware, Software installed and Tested

Budget BUDGET CATEGORY Investment Plan Estimate Current Estimate (as of July) Current Estimate: Expended/Obligat ed to Date $ % Current Estimate: Un-obligated Balance $ % Personal Services Contracts $332,750$1,069, %$00% Hardware Maintenance $13,044$45,652$8,00018%$37,65282% Software Maintenance/upg rade $247,889 Goods and Services$75,000$56, %$00% Hardware Purchase$1,238,472$1,052,704$881,38284%$171,32216% Software Purchase$670,413$250,000$245,56498%$4,4362% TOTAL$2,577,568$2,475,018$2,261,60892%$213,4108%

Technology Acquisition Hardware – Cisco Network, LAN and SAN EMC – SAN storage 5 TB HP – Servers and desktops ADIC – Tape Library Microsoft – Software and development

Project Changes Custom Developed Archival Asset Management System –Allows more functionality, flexibility –Less maintenance costs long term –Own the source code Expanded redundancy and security –Redundant firewalls, load balancers, server configurations –Secure FTP for data uploads –Expanded test environment for development

Scope of Project Phase One to include: –Public web interface Basic and Advanced searches Image viewing, downloading eCommerce –Database Model Automated ingestion and processing of records Self describing Metadata XML deep storage Security roles –Pilot to include Marriage records Chelan, Snohomish, Spokane Historic Census and Naturalization Records

Scope of Project Phase Two to include: –Legislative Services Center –Governor Locke’s Records –Chelan County Clerk –Secure web page for small batch upload Allows providing office to view confidential fields –Increase user experience and functionality

Quality Assurance Begun formal reporting in April Two QA reports to date Onsite Visit July 13 th, No Major Risks Risks Identifies –Backing up to Disk Array Tape Library has been ordered with expected install of Sept 15 th –Need to Conduct Proof of Concept Testing Extensive POC testing has been completed –Development timeline for Grand Opening OSOS staff picking up workload, extensive testing along with development

Change Management Extensive due diligence to minimize need for change Complete testing of network architecture, software installation Weekly Review Meetings with Microsoft, EDS and OSOS development team and executive staff Documented formalized change control process requiring review and sign-off Weekly review of potential risks and mitigation strategies

Key Dates Oct 4 th – Grand Opening Dec 30 th – End of Phase One –Marriage Records, Historic Records, Voter Registration, select s June 30, 2005 – End of Phase two –Governor Locke’s Records, Legislative Services Center, Chelan County Clerk