NE 203 rd Street & NE 215 th Street Intersection Improvements between US 1 & West Dixie Highway Florida Department of TRANSPORTATION Upcoming Project Development.

Slides:



Advertisements
Similar presentations
Oregon 62: I-5 to Dutton Rd. (Medford) Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
Advertisements

Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Great Western Corridor Feasibility Study
New I-65 Interchange at Worthsville Road Welcome!.
U.S. 33 Northern Connector Alternative
Environmental Assessment Public Meeting
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Hallandale Beach Community Redevelopment Agency Budget Overview Fiscal Year
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Randy Wade TRB Intercity Passenger Rail Committee Tuesday January 25, 2011 Washington, DC.
Florida Department of Transportation District 4 TSM&O Program Advanced Transportation Management System (ATMS) Installation in South Broward County ATMS.
River to Sea TPO CAC A Presentation to: May 19, 2015.
Presentation Outline Summary of efforts-to-date Broward County LRTP Amendment Process Next steps.
Future Transportation Projects within the Loxahatchee River Basin Florida Department of Transportation District IV 3400 W. Commercial Blvd W. Commercial.
Anacostia Streetcar Phase 2 Environmental Assessment & Section 106 Evaluation: Community Workshop January 12, 2011.
Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.
Overview of SAFETEA-LU Sections 6001, 6002, 3005, and 3006 TRB January 13, 2008 Shari Schaftlein FHWA Project Development & Environmental Review Washington,
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
CCJPA Sacramento to Roseville 3 rd Track Project Sacramento Stakeholder Advisory Committee (SAC) Meeting #1 HDR Office Tuesday, May 20, :00 - 9:00.
What are Managed Lanes What are Express Lanes What are HOT Lanes Regional Express Lanes Network I-95 Express I-595 Express I-75 Express.
Broward Complete Streets Technical Advisory Committee (TAC) Meeting Monday August 10, 2015.
MetroPlan Orlando Board Meeting Agenda Briefing Board of County Commissioners September 11, 2012.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2011/12 – 2015/16 Presentation to Board of County.
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
S.R. 930 and Green Street Intersection Improvement Project Tuesday, May 22, :00 p.m. Presentation Park Hill Learning Center Auditorium New Haven,
Public Open House - July 10, 2007 WELCOME. Objective of Tonight’s Open House Provide background information on the project Introduce primary work elements.
USA Parkway Project Welcome Public Information Meeting to the
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
Project Briefing for BROOKS BRIDGE REPLACEMENT STUDY and SANTA ROSA SOUND ALTERNATE CROSSING STUDY April 2015 SPEAKER: BOB.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2013/14 – 2017/18 Presentation to Board of County.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2015 – 2019 Presentation to Board of County.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
BROOKS BRIDGE REPLACEMENT STUDY February 18, 2016 Project Briefing for Presenters: April Williams, P.E. (FDOT Project Manager) Steve Schnell, AICP (HDR.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
Florida Department of TRANSPORTATION DeWayne Carver, AICP State Bicycle/Pedestrian Coordinator Florida Department of Transportation Complete Streets Update.
Project Development and Environmental Study (PD&E) S.R. 30 (U.S.) 98 Gregory Street and Bayfront Parkway at 17 th Avenue Intersection Project Development.
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
Alternative Alignments Public Meeting
Pedestrian Facility Improvement Program
Downtown Valdosta Truck Traffic Mitigation Study
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Project Status & Right-of-Way Acquisition
U.S. 98 (State RoaD 30) Project Development & Environment (PD&E) Study
Florida Gas Transmission Mainline Hydrostatic Test
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Florida Gas Transmission Mainline Hydrostatic Test
A Presentation to: River to Sea TPO Board May 27, 2015.
Tampa Hillsborough Expressway Authority Industry Forum 6/15/2018.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Florida Gas Transmission Mainline Hydrostatic Test
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Florida Gas Transmission Mainline Hydrostatic Test
25th Avenue Grade Separation
25th Avenue Grade Separation
Lyle Parkway to SR 540 (Winter Lake Road)
Coast to Coast Trail: FDOT District Seven Update
Wakulla County Airport
Tampa Hillsborough Expressway Authority Industry Forum 2/8/2019.
PUBLIC HEARING S.R. 30 (U.S. 98 Business/West Garden Street)
S.R. 261 Intersection Improvement at Fruitwood Lane in Newburgh
U.S. 20 at State Road 2 New Interchange
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
East Selmon Capacity Project PD&E Study Industry Forum
Space Coast TPO State Road (S.R.) 528 Update
Presentation transcript:

NE 203 rd Street & NE 215 th Street Intersection Improvements between US 1 & West Dixie Highway Florida Department of TRANSPORTATION Upcoming Project Development & Environment (PD&E) Study 1

Project Location Purpose & Need Transportation Project Development Process Schedule Efficient Transportation Decision Making (ETDM) Alternatives Screened FDOT Contact Information Presentation Outline 2

Transportation Project Development Process 3

Florida Department of Transportation Project Location Intersection of NE 203 rd Street/Ives Dairy Road and SR 5/US 1/Biscayne Boulevard Intersection of NE 215 th Street/County Line Road and Dixie Highway In the City of Aventura in Miami- Dade County, unincorporated Miami- Dade County and City of Hallandale in Broward County, Florida. 4

Study Purpose and Need Improve traffic operations Enhance safety conditions  By eliminating vehicle conflicts with existing freight and future passenger trains at the Florida East Coast (FEC) Railway line crossings Florida Department of Transportation 5

Proposed Schedule PD&E STUDY DESIGN CONSTRUCTION ETDM PUBLIC INVOLVEMENT PROCESS 6

Efficient Transportation Decision Making Florida Department of Transportation The Efficient Transportation Decision Making (ETDM) is Florida's process for reviewing projects for consideration of potential environmental effects during the Planning Study Phase The process promotes interagency coordination and feedback from stakeholders ETDM process incorporates environmental considerations into transportation planning 7

ETDM Interagency Coordination Florida Department of Transportation Start Date July 12, 2013 End Date August 26, 2013 City of Hallandale Beach provided comments on August 21,

Project Screening Package Florida Department of Transportation 1.Transmittal Letter 2.FDOT letter to Florida State Clearing House 3.Purpose and Need Statement, Project Description 4.Preliminary Environmental Discussion (including all 21 environmental components for each alternatives) 5.Project Location Maps 6.Application for federal Assistance SF Transmittal List 9

Summary of Screening Alternatives Florida Department of Transportation ETDM Alternatives DescriptionIntersection Alternative 1All Alternatives on NE 203 rd Intersection (Alternatives 1-5) 203 rd Alternative 2Alternatives A, B and C (Grade Separation) on NE 215 th Street 215 th Alternative 3Alternative D (Connection to US 1) on NE 215 th Street 215 th 10

Florida Department of Transportation Alternatives Screened Five (5) alternatives were screened for consideration to improve the intersection. All will maintain existing traffic movements NE 203 rd Street/Ives Dairy Road and SR 5/US 1 11

Florida Department of Transportation Alternatives Screened Four proposed (4) alternatives were screened that will provide grade separation NE 215 th Street/County Line Road and Dixie Highway 12

Florida Department of Transportation Results of Screenings Alternative 1 (NE 203rd St. Alternatives 1-5) Alternative 2 (NE 215th St. Alternatives A-C) Alternative 3 (NE 215th St. Alternative D) IssueDegrees of Effect Social and Economic 3 - Enhanced 2 - Enhanced 6 - Moderate5 - Moderate6 - Moderate 1 - Minimal2 - Minimal 1 - Substantial (Potential Relocation Cultural 3 - Minimal1 - Minimal3 - Minimal 2 - Moderate3 - Moderate1 - Moderate Natural 8 - Minimal9 - Minimal 2 - Moderate Physical 2 - Moderate2 - Minimal 1 - Substantial (Contamination) 1 - Moderate Project Effects Overview 13

Florida Department of Transportation Project Information Project Contact Dat Huynh, P.E. Project Development Engineer Florida Department of Transportation, District 6 ph: (305) Involved Agencies 14

Florida Department of Transportation QUESTIONS 15