Canadian Columbia River Basin Forum Stephen Oliver VP Generation Supply Bonneville Power Administration November 10, 2005.

Slides:



Advertisements
Similar presentations
Presentation to State Water Resources Control Board November 14, 2012 By Dave Modisette Executive Director California Municipal Utilities Association.
Advertisements

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Bonneville Power Administration - Pumped Storage Evaluation Northwest Hydroelectric Association.
Overview of the U.S. Electrical System & the Bonneville Power Administration (BPA)
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Balancing an Over-Supply of Generation October 12, 2010 Public Meeting.
1 Managing Uncertainty in Generation, Inventory and Revenue January 23, 2011 AMS Meeting AMS SHORT COURSE: HYDROLOGIC PREDICTION AND VERIFICATION TECHNIQUES.
BC Hydro Generation system operation
Northwest Electricity The Council An interstate compact of ID, MT, OR and WA, not a federal or state agency. An interstate compact of ID, MT, OR and.
Current Northwest Energy Issues A BPA Customer Perspective Dan James PNWA Summer Meeting June 23, 2014.
3/16/20001 BPA’s traditional revenue stream varies with water supply (higher water conditions, higher revenues) BPA’s revenues from Slice are independent.
Alan F. Hamlet Se-Yeun Lee Kristian Mickelson Marketa McGuire Elsner JISAO/CSES Climate Impacts Group Dept. of Civil and Environmental Engineering University.
Alan F. Hamlet Se-Yeun Lee Kristian Mickelson Marketa McGuire Elsner JISAO/CSES Climate Impacts Group Dept. of Civil and Environmental Engineering University.
Yellowtail Dam & Bighorn Lake Billings, Montana January 2011 RECLAMATION Managing Water in the West.
1 Columbia River Forum Columbia River Treaty A Federal Perspective David Burpee Natural Resources Canada November 9, 2005.
Federal Columbia River Power System Operations Planning.
FBC Resources 1 Dan Egolf Manager, Power Supply & Planning.
COLUMBIA RIVER SYSTEM OVERVIEW
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N McNary Dworshak Anderson Ranch Palisades Ice Harbor Grand Coulee Revelstroke Lower Monumental.
Introduction to Bonneville Power Administration
Future of the Columbia River Treaty A British Columbia Perspective 2014 PNWA Summer Conference Coeur d’Alene June 23, 2014 Kathy Eichenberger B.C. Ministry.
Columbia River Treaty Review British Columbia Perspective Northwest Hydroelectric Association 2013 Annual Conference Portland, Oregon February 20, 2013.
NW Regional -- Washington n n Washington’s residents, businesses and industries spend $10 billion on their energy costs each year. n n Washington’s long-term.
Title Slide HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY.
BUILDING STRONG SM 1 Columbia River Salmon and Federal Columbia River Power System Rock Peters Senior Program Manager.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Page 1 Smart grid in the Pacific Northwest – best practices from the largest demo project in.
Oregon Rural Electric Coop Directors Education Seminar The Future for BPA Jim Litchfield June 2,
1 Columbia River Treaty Overview of Columbia River system water management presented at Canadian Columbia River Forum 30 May 2007 Kelvin Ketchum BC Hydro.
Bureau of Reclamation Pacific Northwest Region Partnerships.
Climate Change and The NW Power Supply Climate Impacts on the Pacific Northwest University of Washington April 21, 2009.
Hydro Power 102. Hydroelectric Models in the Northwest.
Trans-boundary issues in the Pacific Northwest.
California Energy Commission Staff Paper - April 12,20071 Estimating the Generation Resource Mix of Electricity Imports to California – Energy Commission.
CANADIAN COLUMBIA RIVER FORUM Biological Opinion: An overview of The impacts on Water Management Jim Barton, Chief of Corps of Engineers Columbia Basin.
July 17, 2013 Wenatchee, WA Kevin M. Nordt Grant PUD 1.
2014/2024 Review Columbia River Treaty Bonneville Power Administration - U.S. Army Corps of Engineers Briefing for the Central Asian Delegation January.
Visit by Government Officials from Mozambique COLUMBIA RIVER SYSTEM BRIEFING III U.S. Army Corps of Engineers Northwestern Division North Pacific Water.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 BPA Overview May 2009.
FCRPS Adaptive Management Implementation Plan (AMIP) 1 September 15, 2009.
1 The Sustainability Network of Washington County January 27, 2010 Jason Eisdorfer Bonneville Power Administration.
Powered by the Loads and Resource Information System (LaRIS) Pacific Northwest Loads and Resources Operational Peaking Adjustment Council Briefing.
Northwest Power and Conservation Council slide 1 The Columbia River Treaty John Shurts General Counsel Northwest Power and Conservation Council Portland,
Alan F. Hamlet, Philip W. Mote, Nate Mantua, Dennis P. Lettenmaier JISAO/CSES Climate Impacts Group Dept. of Civil and Environmental Engineering University.
April Columbia River Treaty Overview of Columbia River Treaty.
RGGI Workshop on Electricity Markets, Reliability and Planning Topic Session 3: RGGI Design, Markets and Reliability – Issues Relating to System Operations.
City of Port Angeles Strategic Planning Workshop for Power Supply June 7, 2011 Scott Corwin Executive Director Public Power Council.
BUILDING STRONG SM Northwestern Division Presented by Lori Rux Chief, Program Support Division June 11, 2009 BPA Direct Funding for Corps Hydropower Projects.
1 Pacific Northwest Hydro-Thermal System and RTO West Market Design FERC Market Design Workshop January 23, 2002.
El Gallo Hydroelectricity Project PDD Analysis
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Title Sub Title B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Bonneville Power.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
HYDROPOWER NWD HAS LION SHARE (75%) OF COE HYDRO NWD HAS LION SHARE (75%) OF COE HYDRO PACIFIC NW’S DOMINANT POWER SOURCE PACIFIC NW’S DOMINANT POWER.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
Northwest Power and Conservation Council Overview of Draft Sixth Power Plan Council Meeting Whitefish, MT June 9-11, 2009.
CANADIAN COLUMBIA RIVER FORUM U.S. Flood Control and Operational Perspective Jim Barton, Chief of Corps of Engineers Columbia Basin Water Management Division.
Columbia River Treaty Past, Present and Future Status of Columbia River Treaty Discussions: a BC government perspective October 7, 2015 Osoyoos, BC Kathy.
Background for Demand Response in PNW Pacific Northwest Demand Response Project May 2, 2007 Ken Corum.
NON-TREATY STORAGE AGREEMENT “Introduction to Operations and the Non Treaty Storage Scenarios” Presenter: Jim Gaspard.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N June 2011 Non-Treaty Storage Agreement non-Binding Terms for Storage Accounts.
Alan F. Hamlet Jeffrey Payne Dennis P. Lettenmaier Richard Palmer JISAO Climate Impacts Group and the Department of Civil Engineering University of Washington.
Columbia River Basin Fish Restoration Activities ACCOMPLISHMENTS TO DATE AND UPCOMING ISSUES Bonneville Legal Briefing – October 2015.
Northwest Power Planning Council Fish and Energy Impacts Resulting from Reductions in Summer Bypass Spill July 16, 2003.
Title Slide HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY.
Slide 1 Overview of Conservation in the Pacific Northwest Energy Efficiency Options in the Northwest Post-2011Meeting March 4, 2008.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Slide 1 FEDERAL ENVIRONMENTAL SYMPOSIUM (West) – 6/3/09 Implementing Energy Efficiency in Remote.
Strategies for Colorado River Water Management Jaci Gould Deputy Regional Director Lower Colorado Region.
1 Bonneville Power Administration. 2 BPA markets power from 31 federally owned dams, one non-federal nuclear plant, and wind energy generation facilities.
2017 Integrated Resource Plan
Key Findings and Resource Strategy
Columbia River Treaty and Office of Columbia River Updates November 1, 2018 / CBDL Conference G. Thomas Tebb, Director Ecology – Office of Columbia River.
How the Missouri River is Operated - WAPA’s Role - Mid-West Electric Consumer Association Annual Meeting December 11, 2018 | Denver, CO Lori L. Frisk VP,
Presentation transcript:

Canadian Columbia River Basin Forum Stephen Oliver VP Generation Supply Bonneville Power Administration November 10, 2005

2 Outline Northwest and BPA Overview The Increasing Value of Hydroelectric Power Increasing Demands for More Flexible Operations Operational Requirements in Support of Fisheries The Future of the Columbia River Treaty

3 The Bonneville Power Administration Congress created the Bonneville Power Administration (BPA) in 1937 to market and transmit the power produced by Bonneville Dam. BPA’s functions: Assure the adequate, economical, efficient, and reliable power supply for the Pacific Northwest. Acquire resources necessary to meet load. Ensure transmission access, public preference, and regional preference to customers. Operate and maintain the Pacific Northwest high voltage transmission system. Mitigate for the effects of the Federal Columbia River Power System (FCRPS). Serve as Chair of the U.S. Entity, Columbia River Treaty

4 Federal Columbia River Power System The U.S. FCRPS includes 31 hydroelectric projects with 209 turbine-generating units. (21 Corps of Engineers projects and 10 Bureau of Reclamation) in Washington, Oregon, Idaho, and Western Montana. Over 22,000 MW of nameplate capacity and about 8,600 aMW of hydro energy production with average water Ninety-four percent (94%) of the FCRPS generating capacity is in12 projects. Seventy percent (70%) of BPA power comes from hydro. Over forty percent (40%) of the U.S. PNW Region’s power comes from BPA.

5 The Increasing Value of Hydroelectric Power

6 Last year saw the largest gain in global oil demand since Worldwide demand increased 2.6mbbl/day. China's demands lead the increased consumption. Their share was 940 kbbl/day, or 36% of the global increase. This is only the second time in history that a single country increased oil consumption by more than 900kbbl/ day in the course of a year. The last time was the U.S. in The U.S. was second behind China in oil consumption growth last year, increasing kbbl/day. This year's oil global consumption growth is below the pace of last year, but still very strong.

7 The Increasing Value of Hydroelectric Power The value of hydro power capacity has also grown as result of: 1. deregulated market demand for more responsive resources and creation of ancillary services markets; and 2. the ability to integrate and respond to non- dispatchable renewable resources such as wind and solar.

8 Consequences of the Increased Hydro Power Value Any operation or transaction decreasing energy production (spill), or de-optimizing the value of energy production (shaping) will become far more costly and contentious. Treaty Supplemental Operating Agreements and non-treaty storage agreements may become more difficult to accomplish due to increased uncertainty over future non-power requirements, market prices, and transmission constraints. Allocation of rights to hydroelectric production capability will become more contentious.

9 Increasing Demands for More Flexible Operations Transmission system redispatch to address existing system constraints GridWest (or alternative) system operations and new markets (energy balancing, congestion) requirements Wind (and other resource) integration needs New power products that offer greater independence (Slice)

10 Operational Requirements in Support of Fisheries In sharp contrast to growing market demands for greater flexibility, the growing demand from fisheries interests are: Spill more water for juvenile fish bypass; Shape system flows into spring and summer, and out of winter peak periods in support of juvenile migration; and Reduce (flatten) daily peaking operations to provide improved rearing and spawning conditions.

11 Changes in FCRPS Hydro Generation due to Fish Requirements (2004 NOAA BiOp) (Average of 50 water conditions)

12 Operational Requirements in Support of Fisheries Comparison of Fish & Wildlife Costs vs. PF Rate

13 Operational Requirements in Support of Fisheries Environmental, fisheries, and tribal interests acted to enjoin 2005 spring and summer operations. This resulted in court ordered increased spill at a cost of approximately $70-75 million. Legal proceedings defining 2006 operations are occurring at this time. Increased spring and summer spill and flow to support greater in-river migration are the focus. Parties are also asserting in various venues that a restricted peaking operation on main stem Columbia generation would be beneficial. The potential for alterations in Canadian Treaty storage project operations to enhance spring and summer flows is being discussed.

14 The Future of the Columbia River Treaty Canada and the U.S. have a long, very positive and successful history of working together to implement the Treaty in a manner that has created the greatest mutual benefits. Columbia River Treaty was designed to assure power and flood control benefits in Canada and the U.S., but had the foresight to allow mutually beneficial operations for other benefits. Entities are confident they will continue to create the greatest mutual benefits, within Treaty requirements, until at least Treaty may be terminated on or after 16 September 2024, with 10 years advance notice, by either: Canadian Department of Foreign Affairs, with concurrence of British Columbia, or The U.S. State Department. It is reasonable to expect that prior to 2014 the Entities will be asked for their opinions on termination

15 The Future of the Columbia River Treaty If the CRT is terminated in 2024: BC will continue to operate Mica, Arrow, and Duncan, and the U.S. will operate Libby, for benefits within the country of ownership (subject to Boundary Waters Treaty). Canadian Entitlement will cease to exist, and the U.S. will retain all incremental power at downstream U.S. projects from the operation of Canadian storage, and Canada will continue to retain all incremental power downstream due to the operation of Libby. Canadian Entitlement in 2023 estimated at average annual MW energy and MW Capacity The value of 500 average annual MW of energy at $75/MWh is about $329 (US)million/year.

16 The Future of the Columbia River Treaty Whether or not CRT is terminated in 2024: Canada must continue to operate Treaty reservoirs for U.S. flood control needs if requested by the U.S.. However the U.S. must compensate Canada for any operating costs and economic losses due to requested flood control operations. U.S. Army Corp of Engineers will determine the U.S interests for continued flood control operations. If the CRT is NOT terminated in 2024, U.S. continues to provide the Canadian Entitlement, and Canada continues to operate storage for downstream power and flood control benefits unless otherwise agreed. Canada or U.S. may desire to renegotiate payment amounts for downstream power benefits, and operational arrangement for other benefits.

17 Conclusions Rapidly escalating carbon based fuels prices, combined with new market demands for increased operational flexibility, have dramatically increased the value of hydroelectric facilities. The ability to optimize hydroelectric production must be reasonably balanced with fisheries mitigation actions that may reduce hydropower capability and operating flexibility. Canada and the U.S. must be steadfast in our efforts to continue to derive the greatest mutual benefits from our joint operation of the river through the Columbia River Treaty. Considering the future of the Columbia River Treaty post-2024 will be complex, and demands a thoughtful approach and analysis well in advance of 2014.