TRANSPORT AND HARBOURS DEPARTMENT PERFORMANCE REPORT FOR THE YEAR 2014.

Slides:



Advertisements
Similar presentations
5 Insurance Coverages Every Harbor Master Should Know.
Advertisements

Maritime English Surabaya Merchant Marine College Dias Agata, SS.
Regulatory Proposal December We provide distribution services to 1.4 million residential and business customers We deliver electricity to.
Introduction Transition of Management Initial Challenges Revival and Restoration Production for 2013 Year 2014 Major Works Production Mobile plant Projections.
1 Bexar County Water Control and Improvement District # 10 Richard Frenzel General Manager.
Presents. Tough Times For Transportation Funding Declining gas tax revenues Declining state revenues Uncertain federal revenue + Increasing construction.
General Arrangement Plan
General Arrangement Plan
Water Transportation Systems
NSSC Safety Conference 2007 Victoria Bridge Incident Grand Mira North Cape Breton County, NS February 12, 2004.
SHIPBREAKING Module 1: Introduction to Shipbreaking 1.2 Types of Vessels Susan Harwood Grant Number SH F-23.
2004 SUMMER UNIVERSITY WELCOME !. AGENDA Overview Granger Center Tour Central Heating & Power Plant Tour Grounds Tour Optional - General Services Bldg.
The 7th ITOSF FORUM, Singapore
Workshop: Economics of Domestic Short Sea Shipping The Barge Feeder Service for the Port of Bridgeport Presented by Seaworthy Systems, Inc. Martin Toyen,
SUMMARY OF BENEFITS AND RETURN ON INVESTMENT GPS FLEET TRACKING.
DIVISION OF PORTS AND HARBORS PORTSMOUTH, NEW HAMPSHIRE Captain Geno J. Marconi, Port Director.
THE BATTLE OF THE NORTH ATLANTIC By: Matthew Dickson.
UNHCR/e-Centre/InterWorks - Emergency Management Training
1 Great Lakes Observing System and Marine Operations Edison Boat Club – June 21 st, 2011 An ISO 9001:2008 Company.
Feasibility Study Jonathan CalderwoodJune 14, 2013 West Shore Communities Feasibility of Sustainable Transportation with Passenger Ferry Service.
Dredges & Barges. Dredges  Used in different mining applications  Sand & gravel are most commonly dredged materials  Other minerals also mined with.
1 KZN SOCIAL WELFARE AND POPULATION DEVELOPMENT PUBLIC HEARINGS ON CONDITIONAL GRANTS 18 TH JAN 2006.
Potential Socio-Economic Impacts of Climate Variability and Climate Change in the Great Lakes Region by George M. Albercook C E P E S Center for Environmental.
Fontana Unified School District Budget Update
Improved Vehicle Operations in SSA Mustapha Benmaamar, TRL.
Limpopo - Health1 Report to the Select Committee on Finance on the Provincial Budgets and Expenditure Review 2001/ /08 and Conditional Grants and.
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY September 2015.
North Carolina ABC Distribution Center Graham B. Thompson Project Manager LB&B Associates Inc.
CARIBBEAN MARITIME INSTITUTE DIPLOMA IN INTERNATIONAL SHIPPING & LOGISTICS General Ship Knowledge ML 301.1(3.0) 11/23/2015 Capt. Devron S. Newman - GSK.
GDOT’s Funding Issues 1. GDOT Fund Sources Federal Funds (FHWA, FTA, FAA) State Motor Fuel Taxes (restricted to roads/bridges) State General Funds (we.
The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw.
Presentation of the Property Rates Debt to the Port Folio Committee on Cooperative Governance & Traditional Affairs 25 October 2011 Presented by: Cathy.
Presents. Tough Times For Transportation Funding Declining gas tax revenues Declining state revenues for aviation, highways and transit Uncertain.
Chapter five Group weights, water draft, air draft and density.
10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Boat Parts.
+ Facilities and Transportation VCSD Strategic Plan.
National Department of Public Works Republic of South Africa National Department of Public Works Republic of South Africa 02 APRIL 2002 JAMES MASEKO DIRECTOR-GENERAL.
Water Emergency Transportation Authority 1 San Francisco Bay Area Draft Short Range Transit Plan January 2016.
ALOKRAJ. V - NA07B004. General All deck machinery and construction equipment are to be supplied and installed to meet classification, intended operational.
PORT OF PORO Poro, Camotes Island, Cebu. General Profile Name of PortPORT OF PORO Port OwnerCebu Port Authority Port OperatorCebu Port Authority ServicesBerthing.
NCOP PRESENTATION ON CONDITIONAL GRANTS AND CAPITAL EXPENDITURE – NORTH WEST. FOURTH QUARTER ENDING 31 MARCH
Welcome Bexar County WCID #10 Informational Meeting.
Regional Strategy in Freight Logistics, Maritime Transport and Trade Facilitation The Shipping industry is the oldest industry in the world next to prostitution.
Port of Pittsburgh Commission James R. McCarville Met Coke Conference – Pittsburgh November 2, 2010 Welcome to the Port of Pittsburgh.
A cross functional team was formed to review the current revenue protection process, the potential impact due to the implementation of Smart Metering.
Objective Transportation Assets Strategic Intermodal/International Points Next Steps & Discussion Critical Issues for Ohio.
The Transportation Logistics Company Indiana Logistics Summit Infrastructure Needs and Opportunities September 26, 2007.
My service learning experienced this spring semester at Pace University, for Peace and Justice Studies (class) consisted of volunteering 21 hours to Habitat.
LOCAL OPTION SALES TAX FOR EDUCATION APPROVED BY THE BOARD OF TRUSTEES SEPTEMBER 29, 2015.
1.  Quick Overview of the History and Need  What is Planned for the Fire Department  What is Planned for the Police Department  Financial Details.
Financial Elements 1. Firm’s Main Objective is Value Creation for Shareholders and Other Stakeholders.
Review of 2016–2021 Strategic Budget Plan Development Process and 2016 Budget Assumptions Financial Administration and Audit Committee April 14,
Facing Funding and Weather Challenges: Impact of Weather Events on Treatment Selection and Pavement Condition PPRA Fall Meeting 2014 November 17-19, Baltimore,
2017 Annual Program Evaluation Update
TRANSPORT TECHNOLOGY Ground transportation by road is one of the most important today as well as for freight and people, due to the great development of.
OVERVIEW presentation THE NELSON MANDELA MUSEUM
Regional Transit Formula Fund Policies Section 5307/5340 – Urbanized Formula Fund Section 5337 – State of Good Repair Section 5339 – Bus and Bus Facilities.
Gatchalian, Rein Edrian Hernandez, Diana Erika Ramos, Aira Coline
MTA 2019 Final Proposed Budget November Financial Plan
12thJune, 2016 Science City, Kolkata.
PRESENTATION TO THE PORTFOLIO COMMITTEE – EXPENDITURE AS AT 31 MARCH JUNE 2013.
PUBLIC HEARINGS ON CONDITIONAL GRANTS AND CAPITAL EXPENDITURE:
Public Works Department October 2016
FY Budget Workshop Meeting
POrt AND TERMINAL Durban port shipping and logistics
Port and terminal Assignment 1.
Agenda FYE June 30, 2020 Operating Budget
Agenda FYE June 30, 2020 Operating Budget
Presentation transcript:

TRANSPORT AND HARBOURS DEPARTMENT PERFORMANCE REPORT FOR THE YEAR 2014

Transport and Harbours Department has a fleet of eight (8) Vessels inclusive of 2 Motor Barges. The 2 new Chinese vessels – M.V. Kanawan and M.V. Sabanto operated the Parika – Supenaam Ferry Service assisted by the M.V. Malali which also plied the Wakenaam Service. The Bartica Ferry Service was operated by the M.V. Makouria, while the M.B. Sandaka plied the Leguan Service. The M.V. Kimbia and M.V Lady Northcote operated the North West District services to Kumaka and Port Kaituma respectively, while the Berbice Ferry Service was serviced by the M.B. Bonasika.

PARTICULARS NUMBERS/TONS INCREASE PERCENTAGE % PASSENGERS362,860331,35231,50810 VEHICLES 62,088 58,502 3,5867 CARGO (tons)145,307125,600 19,70716 COMPARISON OF TOTAL PASSENGERS,VEHICLES AND CARGO TRANSPORTED IN 2014 AND 2013

PARTICULARS REVENUE DIFFERENCE $ PERCENTAGE % 2014 ($M) 2013 ($M) PASSENGERS 103,975,606 89,540,080 14,435, VEHICLES 213,588, ,122,020 (13,533,470) (6) CARGO 305,396, ,304,112 22,092,126 8 MISCELLANEOUS 71,538,353 79,496,147 (7,957,794) (10) TOTAL 694,498, ,462,359 15,036,388 3 COMPARISON OF REVENUE FOR PASSENGERS, VEHICLES AND CARGO TRANSPORTED IN 2014 AND 2013

SERVICE PASSENGERS # VEHICLES # CARGO TONS SUPENAAM 205,993 43, ,532 BARTICA 19,429 7,118 12,445 LEGUAN 83,424 11,605 14,011 NORTHWEST 4, ,312 BERBICE 49, TOTAL 362,860 62, ,307 TOTAL PASSENGERS, VEHICLES AND CARGO TRANSPORTED PER SERVICE FOR 2014

REVENUE AND EXPENDITURE YEARSREVENUEEXPENDITUREDEFICIT ,498,747701,850,997 7,352, ,462,359806,984,512127,522,153 DIFFERENCE 15,036,388 Increase 105,133,515 Decrease -

MONTHLY AVERAGE FINANCIAL BREAKDOWN

In the year 2014, the Department received a subsidy of $400.0M from the Ministry of Finance, which assisted with the payment for Fuel to the tune of $33.3M per month. However, the total expenditure for fuel and lubricant is $46.0M. Therefore the shortfall of $13.0M was funded by the Departments current revenue and assistance from the Maritime Administration Department.

VESSELS AMOUNT CONSUMED Gallons EXPENDITURE $ M.V. SABANTO4,2423,452,988 M.V. KANAWAN4,1913,411,474 M.V. MALALI1,5741,281,236 M.V. KIMBIA1,3601,107,040 M.V. MAKOURIA1,050854,700 M.V. LADY N/COTE930757,020 M.B. SANDAKA659536,426 M.L. SETTER182148,148 TOTAL14,18811,549,032. WEEKLY AVERAGE FUEL CONSUMPTION PER VESSEL

As can be seen above the average fuel consumption per week is 14,188 gallons with a total cost of $11.5M, the average monthly fuel consumption is therefore 56,752 gallons (that is 14,188 * 4) with a corresponding expenditure of $46M (that is $11.5M * 4). During the year 2014, the total Capital allotment to Transport and Harbours Department was $483.0M. This amount had catered for the dry-docking of three (3) vessels, Acquisition of Spares and the Rehabilitation of a few Stellings as follows:-

M.V. Malali – Allotment $120.0M The M.V. Malali which plies the Parika/Supenaam/Wakenaam route was docked at E.C. Vieira Dockyard for the period September 1 to October 9, 2014 at a cost of $118.0M. Extensive works were carried out to the hull, superstructure, underwater fittings and machineries/equipment. VESSELS/SHIPS

M.V. Malali docked at E.C. Vieira Dockyard

M.V. Kanawan and M.V. Sabanto – Allotment $50.0M These two (2) vessels which ply the Parika/Supenaam route are scheduled to be docked this year to the tune of $25.0M each. Critical areas to be addressed include the hull, where anodes would be installed, doors to be serviced, under water fittings to be checked and serviced. These vessels will be docked at E.C. Vieira Dockyard.

 M.V. Barima The M.V. Barima which was slated to be docked in 2013 was docked in year 2014 at a total cost of $103,771,450. Due to the deplorable dock gate at Mazaruni the docking could not have materialized in The Gate has since been rehabilitated and the M.V. Barima is currently ongoing dry-docking there. Upon completion of her docking exercise she is slated to replace the M.V. Lady Northcote on the Georgetown North West district service. This should take effect by the first quarter in 2015 since additional works need to be addressed such as the winch and generator. ROLL OVER DOCKING TO 2014

M.V. Barima docked at Mazaruni Dockyard

 M.V. Makouria The M.V. Makouria underwent dry-docking at the E.C.Vieira Dockyard during the period February 20 to March 21, 2014 at a cost of $135.0M. Works were carried out to the hull and underwater fittings, superstructure, machineries and equipment.

M.V. Makouria docked at E.C. Vieira Dockyard

 Storage Bond – Allotment $15 million. The construction of a Storage Bond to store spares for the vessels and ships. Presently the spares are stored in two (2) containers.  Acquisition of Spares – Allotment $200 million. The spares were acquired for maintenance repairs of vessels and ships totalling $204 million.

 Storage Bond – Allotment $15.0M A total of $15,000,000 was allotted for the construction of a Storage Bond to house spares for the vessels and ships. The spares are presently being stored in 2 – 20ft containers and this usually pose difficulties when trying to retrieve parts/components.

 Rehabilitation of the Transport and Harbours Department Head Office at a cost of $12.0M funded by MARAD where the working condition/environment has been greatly improved.  In addition, the building was enhanced with cubicles, new desks and other office furniture. Other Achievements for the year 2014

1.The Maritime Administration Department had dredged the Chalmers and Sting Ray crossing in the Essequibo river making it possible for the vessels to traverse freely. The vessels plying the Parika/Supenaam and Parika/Wakenaam services that were restricted to operate on tidal condition are no longer operating under such restriction. Instead of a boat every twelve (12) hours there will be a boat every five (5) hours three (3) trips per day that is 6 a.m., a.m. and 4.00 p.m. 2.The Mazaruni Dock gate was rehabilitated for $17.0M Improved Ferry Service in 2014

YEARSREVENUEEXPENDITUREDEFICIT ,394,114701,850,997 22,456, ,462,359806,984,512127,522,153 DIFFERENCE 68,245 Decrease 105,133,515 Decrease - Revenue and Expenditure

PARTICULARS YEAR INCREASE PERCENTAGE % PASSENGERS 351,023331,35219,6716 VEHICLES 58,138 58, (1) CARGO 138,573125,600 12,97310 TOTAL PASSENGERS, VEHICLES AND CARGO TRANSPORTED FOR 2014 AND 2013

PARTICULARS REVENUE INCREASE ($) PERCENTAGE % 2014 ($M) 2013 ($M) PASSENGERS 98,427,352 89,540,080 8,887, VEHICLES 208,948, ,122, ,173,686 (8) CARGO 301,121, ,304,112 17,817,567 6 MISCELLANEOUS 79,466,148 79,496,147 29, TOTAL 687,963, ,462,359 8,501,154 1 COMPARISON OF TOTAL REVENUE FOR 2013 AND 2014

 PARIKA  LEGUAN  WAKENAAM  SUPENAAM STELLINGS –ALLOTTMENT $62.0M

 Parika Rehabilitation works are ongoing at Parika Stelling at a total cost of $31.6M. Works slated to be effected include repairs to the fender/mooring system, cluster piles, changing of dilapidated

 Leguan Works to the tune of $10,000,000 were executed at Leguan Stelling where fender/mooring systems were put in place, replacing of dilapidated decking, beams and piles.

 Wakenaam A total of $6,000,000 was spent on Wakenaam Stelling where fender/mooring system was being put in place. Changing of decking and beams also the passenger accommodation was addressed.

 Supenaam Repairs were effected to the mooring system and catwalk at the roll on / roll off facility, the fender/mooring system for the side loading and rails along the driveway. These works were done at a cost of $10,000,000.

HEAD OFFICE – INTERIOR The Transport and Harbours Department Head Office was renovated at a cost of $12.0M funded by MARAD where the working condition/environment has been greatly improved. In addition, the building was enhanced with cubicles, new desks and other office furniture. OTHER ACHIEVEMENTS

1.The Maritime Administration Department had dredged the Chalmers and Sting Ray crossing in the Essequibo River making it possible for the vessels to traverse freely. The vessels plying the Parika/Supenaam and Parika/Wakenaam services that were restricted to operate on tidal condition are no longer operating under such restriction. Instead of a boat every twelve (12) hours there will be a boat every five (5) hours three (3) trips per day that is 6 a.m., a.m. and 4.00 p.m. IMPROVED FERRY SERVICES

2.The Mazaruni Dock Gate was rehabilitated at a cost of $17.0M. 3.The Department also received a subsidy of $400.0M from the Ministry of Finance, which assisted with the payment for Fuel.

There were two (2) major incidents in 2014 as listed hereunder: 1. On April 9, 2014 while lorry # GKK 9159 was disembarking the M.V. Kanawan which was berth alongside the Supenaam Stelling, the vessel sheared away about 6-8 feet from the stelling causing both chains and wire ropes to snap resulting in the said lorry falling overboard. This matter is presently engaging the attention of the Ministry of Legal Affairs; hence we are awaiting advice on the way forward. 2.On November 17, 2014 while the M.V. Sabanto was en route to Supenaam Stelling there was restricted visibility, hence the Captain and look outs lost all sense of direction and position, INCIDENTS

but the Captain failed to drop anchor and wait for the weather to improve. Nevertheless, the vessel continued to travel at an unsafe speed, relative to the condition of restricted visibility, the Captain then gave the wrong helm order thereby causing the vessel to run hard aground onto the south-western side of the Wakenaam Island in the Essequibo River. As a consequence, the Captain has since been dismissed from the Department’s service and the Helmsman and all the look outs were suspended from duty, without pay, for one month each.

MV Kanawan  A Laden Truck fell off the rear Gangway door at Supenaam Stelling.

 The ferry ran aground on Wakenaam Island MV Sabanto

 Shortage of marine officers  Limited human resources to conduct maintenance works.  Inadequate Equipment, vehicles and machines for maintenance operation.  Container used as storage facility for spare parts.  Limited funds for Dry Docking of Vessels/Ships and rehabilitation works of buildings/facilities.  An aging fleet of vessel with obsolete machineries. CHALLENGES FACED IN 2014

 Docking and Rehabilitation of the M.V. Kimbia and M.B. Sandaka  Acquisition of Spares for Vessels and Ships  General rehabilitation to the Goods Wharf  Additional rehabilitation of Bartica Stelling  Construction of Passenger accommodation at Parika Stelling  Rehabilitation of the Central Workshop and  Construction of Living Quarters at Supenaam  The department plans to acquire a new Ocean going ferry to operate the Georgetown/North West route and  To restore the Berbice River Service PLANS FOR THE YEAR 2015

THANK YOU