Overview of PROFOREST activity by Marta Topczewska Kraków, February 25, 2005.

Slides:



Advertisements
Similar presentations
Cultural Heritage in REGional NETworks REGNET. October 2001Project presentation REGNET 2 WP6 – Dissemination AIT ONB SR IMAC SUL TARX MUS MOT SPAC CC.
Advertisements

Cultural Heritage in REGional NETworks REGNET. July 2002Project presentation REGNET 2 WP6 – Dissemination AIT ONB SR IMAC SUL TARX MUS MOT SPAC CC IAT.
Association of Eurasian Central Securities Depositories (AECSD) 2-4 September 2007 The ACG-11 General Meeting Beijing, China.
PER-NATUR INTERREG III A ITALIA - ALBANIA Project part-financed by the European Union (ERDF) (ERDF)
Equal Chances to European Integration through the use of the European Language Portfolio Coordinator: PROSPER-ASE Language Centre, Bucharest,
About the draft report Judy Kay CHAI: Computer human adapted interaction research group School of Information Technologies.
About the final report and feedback on demonstrations Judy Kay CHAI: Computer human adapted interaction research group School of Information Technologies.
Interface Programming 1 Week 15. Interface Programming 1 CALENDAR.
Set and Achieve Your Goals for 2012 Linnea Blair Advisors On Target.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study 4th Annual Report meeting February 12, 2009 J. Eschke,
WP7: Training modules Claudia Engelhardt, Timo Gnadt, Jens Ludwig Gothenburg, Final.
Network of Excellence in Internet Science 1 st Review meeting Brussels, 12th April 2013 FP7-ICT EINS WP13 Dissemination and Cooperation.
Action Plan – 1st year Nataša Urbančíková Faculty of Economics Technical University of Košice.
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
District District Administration District District Administration 1 Yap Boon Liang ACS/ALS Administration Manager designate HP:
GTZ | Tim Mahler| Project Management Project Management.
PROFOREST Protection of Forest Resources in Central Europe QLK1-CT /PROFOREST Centre of Excellence at the Forest Research Institute in Warsaw,
Opening the Portal – Walpole Public School District's Success USR06 Lynn Rowan, Software Support Specialist Walpole Public Schools.
CULTURe EXchange Platform (CULTUR-EXP) Project Overview Prof. Ramaz Kvatadze Georgian Research and Educational Networking Association – GRENA
NANOSTRUCTURED AND FUNCTIONAL POLYMER- BASED MATERIALS AND NANOCOMPOSITES NANOFUN-POLY, NETWORK OF EXCELLENCE WP14 : Spreading of Excellence - Communication.
Reflections on Broadening Recruitment and Widening Participation: The Challenge of Diversity A WP Development Programme for the University of Borås, 2010.
Session 6. Session 6 Agenda Review of Progress –Attitudes –Assignments –Actions.
National Academy of Sciences of Armenia WORKSHOP ON PhD PROMOTION TOOLS June 2014.
Work package 7 Dissemination and Concertation EuropeanaConnect Plenary Meeting Berlin, May 2010 Monika Segbert, Eremo srl.
Project Acronim: ZONES AND ROADS Project duration: 15 months Priority axis: 1. Enhancement of cross- border economic development Measure: 1.1. Economic.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
WP6 - Increasing the ENGINE Centre visibility and activity directed towards collaboration and innovations Janusz Sobecki.
Collaborative Reformation of Curricula on Resilience Management with Intelligent Systems in Open Source and Augmented Reality Dissemination Activity (May.
1 EUDET Summary and Outlook Joachim Mnich Annual Meeting 2008 NIKHEF, October 8th.
Comenius – ACE 2011 Active Citizenship Europe Project meeting Almaden Spain 27 March – 01 April AT1-COM
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
WP X – Name of WP 1 Insert your name Location – Date Insert Project Name PROJECT AND / OR COMPANY LOGO
EventsDuration of event (days) Dates (months after start) DeliverablesExternal participation (researcher-days, rd), total = 450 rd Kick-off meeting1m1-m2Protocol0.
Coordinating an Observation Network of Networks EnCompassing saTellite and IN-situ to fill the Gaps in European Observations Kick-Off Meeting, February.
FP OntoGrid: Paving the way for Knowledgeable Grid Services and Systems WP10: Dissemination, Transfer and Exploitation Review.
WP6 Implementation of pilot/demonstration projects Introduction EIE EffCoBuild WP6 Implementation of pilot/demonstration projects Introduction WP leader.
EVITherM The European Virtual Institute for Thermal Metrology Contact Thermometry (WP8) LNE - WP8 Report, SG Meeting, Torino 23 April 2003 SG Meeting IMGC,
P5 Work Package 5 - Dissemination (WP5) Overall responsibility to ensure the timely achievement of the targets and deliverables for this WP – page 19.
EDINET PROJECT DISSEMINATION ACTIVITIES. DISSEMINATION Dissemination activities will be continued for the period of project realization, to be contributed.
STRUCTURE SCIENTIFIC REPORT / MANAGEMENT REPORT −Progress / objectives (WP and project level) −Progress / milestones (WP and project level) −Progress /
WP5 – SEE Cluster Policy Learning Mechanisms 3° Steering Committee Meeting Thessaloniki,
HQVET High Quality of Vocational Education and Training - European best methods for improving VET system Meetings, Tasks and Responsibilities This project.
Changing the way europe provides heat and electricity for a sustainable future.
Collaborative Reformation of Curricula on Resilience Management with Intelligent Systems in Open Source and Augmented Reality Dissemination Activity (updated.
Progress Report on Quality Issues SIPUS – Strengthening of Internationalisation Policies at Universities in Serbia February 18, 2015 Belgrade, Serbia.
WGCapD, CEOS and the UN Sustainable Development Goals (SDGs) Committee on Earth Observation Satellites Deputy CEOS Executive Officer / CSA Marie-Josée.
Presentation of Work Package 6 (WP6) “Design and implementation of Dissemination Activities” MATcHES Kick-off meeting Feb 2014 Ruse, Bulgaria TEMPUS BG-TEMPUS-JPHES.
WP 5 – Dissemination of Project-related Information WP leader – UNI Dr. Vladan Pavlović Assistant professor English Department, Faculty of Philosophy University.
ARIES WP2 Task 2.2 kick-off Coordination, support and enhancement of communication/outreach activities for accelerators in Europe Jennifer Toes (CERN),
MARKETING COMMUNICATION STRATEGY
AMICI WP1 – Management, coordination and dissemination
Presenter name affiliation
WP 7 – Dissemination and Network Development
Enhancement of study programs in Public Health Law, Health
Where have all the GPs gone?
IGG Agenda 17th December 2009 Minutes from Previous IGG Meeting
Marie Curie Research Training Networks Mid-Term Review Meeting
Annual Report Instructions
WP7 - Dissemination of Results & Exploitation
Project Developing an innovative European Sport Tutorship model for the dual career of athletes / ESTPORT.
IOF Event Overview Tool – status Feb 2018
AMICI WP1 – Management, coordination and dissemination
HERITAGE PLUS – Management Group Meeting
IENE Intercultural Education of Nurses in Europe
MARDS DISSEMINATION & EXPOILTATION
University “Mediterranean” Podgorica & University of Montenegro
WP2 Dissemination The dissemination process will mainly be based on 2 specific objectives: 1. Information delivery on the JARC 2. Dissemination of the.
Volume 4, Issue 1, Pages 2-3 (February 2006)
Week 3: Moving Target Detection Using Infrared Sensors
Presentation transcript:

Overview of PROFOREST activity by Marta Topczewska Kraków, February 25, 2005

What has been done? E xchange of scientists: 15 researchers have come to the FRIW and 11 from FRIW went abroad. There were 4 workshops, 3 conferences and one school organized. There are two publications enclosed in your materials; one resulted from workshop organized in a range of task WP5.5 and second from WP3.2 activities. The second issue of leaflet was printed which presents general PROFOREST objectives, our achievements until now and plans for 3rd year. Kraków, February 25, 2005

Progress The draft report was delivered to AB members week before the meeting. It encompasses tables which make possible to compare plan with actual realization. Cooperated institutions and individuals were pointed. The web page of PROFOREST is up to date with actual and incoming events and occurring publications. Kraków, February 25, 2005

Progress Second issue of leaflet has been printed recently and its distribution is planned. Carried out workshops and conferences have been advertised in well known web pages like IUFRO calendar of meeting. The partners were chosen with bigger awareness. Hmm…..I had some problems to be clear and brief in the report but I’m convinced that with AB members’ directions and tasks’ leaders help these difficulties will be overcome. Kraków, February 25, 2005

Thank you very much Kraków, February 25, 2005