TRR ARB Presentation Women at Work Website Redesign.

Slides:



Advertisements
Similar presentations
SP Business Suite Deployment Kick-off
Advertisements

TRR/ARB Presentation Yanomamo Interactive DVD System Team 06 - December 4, 2013 ●Reetika Rastogi - Project Manager, Life Cycle Planner ●Tushar Saxena -
Software Quality Assurance Plan
USC Football Recruiting Database System. Team 6 Client: Jared Blank with USC Football. Revati Kadu Natasha Karnik Akshay ArasMike Nicosia (IV & V) Abhishek.
Sixth Hour Lecture 10:30 – 11:20 am, September 9 Framework for a Software Management Process – Artifacts of the Process (Part II, Chapter 6 of Royce’ book)
6.1 Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Building Information Systems Chapter 13 VIDEO CASES Video Case 1: IBM: Business.
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
City of LA Personnel Department Mobile Application Team 02 1.
Maintain and Modify By: Sahar Aftab (1253 ) and Mehboob Nazim (1085) Central Library.
LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.
Release & Deployment ITIL Version 3
Joel Bapaga on Web Design Strategies Technologies Commercial Value.
Healthy Kids Zone Team Introduction Chad Honkofsky 2.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
Women at Work WEBSITE REDESIGN Srikant Madhava,Project Manager Sanath Bhandary, Operational Concept Engineer Rohit Kudva, Feasibility Analyst Varma Maryala,
TEAM’S STRONG/WEAK POINTS David Wiggins – Remote Student 1.
FLAVIUS Technical presentation (Overblog, Qype, TVTrip) - WP2 Platform architecture.
City of Los Angeles Personnel Department Mobile Application Team 02:Shreya kamani Anushree Sridhar Pattra Thongprasert Abhishek Trigunayat Travis Jones.
Elockbox Team08 Fall2014 Jian Lei Role(s): Project Manager / Builder Da Lu Role(s): Prototyper / System/Software Architect Cheng Role(s):Feasibility Analyst.
End HomeWelcome! The Software Development Process.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Software Engineering Project: Research Expert Prabhavathi Kumarasamy Joshua Thompson Paul Varcholik University of Central Florida.
Website Project Development Presentation by APNARAJ.COM.
TRANSITION READINESS REVIEW GOTRLA TEAM 15 Aayush Jain, Ankith Nagarle, Anushila Dey, Deepak Earayil, Elaine Lo, Nidhi Baheti, Presha Thakkar, Suhani Vyas.
CIP Quality System for Genebank ISO 17025
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Introduction to Making Multimedia
Topics Covered Phase 1: Preliminary investigation Phase 1: Preliminary investigation Phase 2: Feasibility Study Phase 2: Feasibility Study Phase 3: System.
May 6, 2015 Session 10:00am – 12 Noon. Agenda 2 TopicPresenter / FacilitatorTimeframe  Welcome Michael Chen5 min.  CA Web Publishing Richard Lehman55.
Going Google… Drive Eric Yamoah and Haris Azmi August 14, 2015.
Software Life Cycle The software life cycle is the sequence of activities that occur during software development and maintenance.
Mission Science By Team Team 07 Members Jiashuo Li Chen Li Sergey Mukhin Hanadi Mardah Yun Shao Farica Mascarenhas 2.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
RUP Deployment RUP Deployment Workflow
Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts.
May 6, 2009 Browser Compatibility Testing Definition It is a non functional type of testing where web based applications are tested on various browsers(IE.
Thrdplace Social Networking Team #7 1. TRR Outline Operational Concept Overview System benefits to Customer 1.Introduction Demo of System Operational.
JRA1 Meeting – 09/02/ Software Configuration Management and Integration EGEE is proposed as a project funded by the European Union under contract.
The Share Web Team 5.
HedEx Lite Obtaining and Using Huawei Documentation Easily
TRR/ARB Team 9: TipSure.com.
... Transform young lives through Music
SOFTWARE TESTING Date: 29-Dec-2016 By: Ram Karthick.
System Design, Implementation and Review
Cash Doctor 3.0 Mobile Application
Image Processing Platform
Transitional Readiness Review Team 08
ShareTheTraining TRR ARB Presentation Team 11
DCR ARB Presentation Team 5: Tour Conductor.
TEAM 15 Joint Educational Project ONLINE PLATFORM
Business System Development
Diabetes Health Platform
COSMIC - SYSTEM TRR PRESENTATION
Frenzy TRR ARB Presentation
Transition Readiness Review December 4th, 2015
Team - 03 Transition Readiness Review
Team 07-Fuppy Krupa Patel Adil Assouab Yiyuan Chen(Kevin)
Diabetes Health Platform
Mission Science By Team 07.
CSCI 577b Tasks and Activities
A Global Trojan Solution
OCD Risk Management CS 577a, Fall 2012 ©USC-CSSE.
Module 01 ETICS Overview ETICS Online Tutorials
ARB Schedule Locations
Family Proud TRR ARB Presentation
Team 7- SCRIPTONOMICS Advanced movie script analytics made simple
Transition Readiness Review
PSS verification and validation
Transition Readiness Review
Team 7- SCRIPTONOMICS Advanced movie script analytics made simple
Presentation transcript:

TRR ARB Presentation Women at Work Website Redesign

Operational Concept Overview Sanath Bhandary Srikanth Madhava

Operational Concept Overview ●Old Business Workflow ○ Registration ○ Feedback ○ Check-in ○ Report Generation ●Drawback of existing workflow ●Proposed new operational concept

Goals ● Automate the existing manual processes involved in Registration, Feedback collection, Report generation and Check-in ● Redesign the website to make it more interactive

Organizational Goals ● Convenient data management through data centralization ● Increase operational efficiency through automation ● Increase number of users via website redesign ● Assist in raising funds through proposal of reports

Additional Features ● Integrating Google Analytics ● Responsive Design

TRR Outline 1.Demo of Initial Operation Capability - Rohit, Nishant 2.Support Plan - Praneet 3.Test Cases, Procedures, and Results - Dinesh, Praneet 4.Quality Focal Point - Brian 5.Transition Plan - Phaneendra

Transition Objectives ● Beta Testing phase in Dev environment. ● Guidelines for Transition. ● Dev Support till 12/15/2014.

Transition Strategy ● Source files (php, html) will be zipped and uploaded in the team website and BitBucket repository will be created for future development. ● Training for transition of website from dev environment to production environment by 12/08/2014

Demo of Initial Operational Capability Nishant Jani Rohit Kudva

Support Plan Praneet Surana

Support Plan ●The system has been tested by the implementation team and is ready for use. ●A user manual and training will provided to the client to overcome any issues that arise after delivering the final deliverable ●The development team will not be making any additional changes to the system.

Test Cases, Procedures, and Results Dinesh Yeduguru Praneet Surana

Testing ●Testing by implementation team ●Testing by the client ●Final testing will be done at the client site and the implementation team will be present to document any known issues and bugs.

Test Cases ●TC-01 Registration Form ●TC Online Check-in ●TC Check-in multiple services ●TC-03 Feedback ●TC-04 Report Generation ●TC-05 Social Media Integration ●TC-06 Blogging ●TC-07 Private Management Portal

Test Procedures ●Manual testing of registration form, feedback form, report generation and online check-in through edge cases and many test case combinations to ensure test coverage. ●Verification was done to ensure that the data was being entered to the Neon CRM and correct reports were generated. ●Any bugs found were documented.

●Phase #1 - 11/15/2014 Online check-in, online registration form, feedback form and report generation module were successfully tested in this phase. ●Phase #2 - 11/30/2014 All Capabilities tested including social media integration and private management portal. ●Phase #3 - 12/08/2014 Final Training and Testing on deployment site. Test Results

Quality Focal Point Brian Bousman

Bug Activity Over Time

Technical Debt WC 3379 – This Win Condition could not be satisfied because of insufficient time to design and implement automating this report

Traceability Matrix OCDWinWinSSAD Use CaseTest Case OC-1 Online Registration WC_3189UC-1TC-1 OC-2 Onsite check-inWC_3190UC-3TC-02-01, TC OC-3 FeedbackWC_3192UC-2TC-03 OC-4 Private management portal WC_3193UC-4, UC-5TC-07 OC-5 Report generationWC_3373, 74, 75, 76, 77, 78, 79 UC-6TC-04 OC-6 Social media integration WC_3195UC-9TC-05 OC-7 BlogsWC_3196UC-8TC-06

Transition Plan Phaneendra Maryala

●Regular Computers with Operating System - Windows, Mac or Linux ●No extra hardware Hardware Preparations

Software Preparations ●Modern Web browser is required - IE 9+, Mozilla Firefox 31+, Google Chrome 34+ and Safari ●The browser should be HTML 5 compliant

●No specific site preparation is required ●A desktop or laptop with the mentioned requirements ●Staff Plan : WaW website admin to maintain the website. Site and Staff Plan

Operational Training ●Demo the system to client ●Client operate it alone ●Correct the wrong steps and take the feedback suggested.

Date Time Location ContentsPerson being trained Responsible personnel Training Manual 12/8/14TBD - Website/Blog management - Registration - Feedback features Cecilia Avila Nishant Jani, Srikanth Madhava WordPress admin User Manual Project User Manual 12/8/2014TBD - Onsite Check- in / Reporting Training Cecilia Avila Rohith Kudva, Sanath Bhandary phpMyAdmin User manual Training

Stakeholder Roles and Responsibilities DateRoleResponsibilitiesLocation 12/01/2014TA’s, Team, ClientTransition Readiness Review ARB evaluation USC 12/02/ /04/2014 Prototyper, Tester, Project Manager Perform final requirements checks and testing, resolve any issues USC 12/08/2014Team, ClientClient training and feedback USC 12/08/2014Team, ClientDeliver the systemUSC

Milestone Plan MilestonesDate for completion Drive through major features developed by client 11/18/2014 Final testing by implementation Team12/06/2104 Client Training and acceptance testing12/08/2014 Deliver the final project to the Client12/08/2014

Required Resources ●Entire implementation team has to be present during client training, testing and final delivery of the project ●Basic hardware and software requirements as stated earlier ●No additional staff or personnel required for installation or maintenance.

Software Product Elements ●Jquery, Bootstrap, Google Analytics libraries and other resources required for the working of the Women At Work project ●The WordPress theme template, image gallery plugin, phpMyAdmin ●User manual will be included along with the rest of the files

Thank You !!