ECE 477 Design Review Team 6  Spring 2011 Left to right: Kirk Iler, Brian Bentz, Stephen Wolf, Fuhe Xu.

Slides:



Advertisements
Similar presentations
Goal-line technology Team INTERNATIONAL Marko Bundalo Ponphet Homchanh
Advertisements

Greg Beau SerajAnanya. Outline  Project overview  Project-specific success criteria  Block diagram  Component selection rationale  Packaging design.
Left to Right: Michael Kelton, Ethan Hall, Greg Wegman, Vashisht Lakhmani.
ECE 477 Design Review Team 6  Spring 2010 Shao-Fu ShihSteve AndersonMike Goldfarb Josh Smith.
ECE 477 Design Review Team 13  Spring 2006 Elmer Chao (not pictured), Matt Cozza (not pictured), Joe Waugh (not pictured), Evan Zelkowitz (not pictured)
ECE 477 Design Review Team 22  Txt Msg DJ Garrett Strzelecki Kyle Brown John Doherty Chris McCabe K.
ECE 477 Design Review Team 15  Spring 2013 Jackson McCormick, Andrew Batek, Carey Woolet, Justin Lindley.
ECE 477 Design Review Team 01  Fall 2012 Brennan Tran Jonah Ea Ben Pluckebaum Kevin Meyer.
 Main Components:  Sensors  Micro controller  Motor drivers  Chasis.
ECE 477 DESIGN REVIEW TEAM 7  SPRING 2013 COST ROBOT CAROLINE TRIPPEL, ANDREW LOVELESS, ERIC OSBORNE, BRYAN DALLAS.
ECE 477 Design Review Team 13  Spring 2008 Paste a photo of team members here, annotated with names of team members. Srichand Varun Madhu Anvesh.
ECE 477 Design Review Team 7  Spring 2011 Paste a photo of team members here, annotated with names of team members. Stuart Pulliam Will Granger Linda.
ECE 477 Design Review Group 9  Spring 2005 Omar Shaikh - Nathan Smith - Jeff Huston - Ryan Koors.
ECE 477 Design Review Group 1  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
Jordan Wagner Justin Spencer Mark Sears John Jachna.
ECE 477 Design Review – Spring 2010 Team 15. Team Members.
ECE 477 Design Review Team 8  Spring 2008 Mike Cianciarulo, Josh Wildey, Robert Toepfer, Trent Nelson.
Stephen Wolf Kirk Iler Brian Bentz Fuhe Xu. Current Schematics Micro, Motor, Keypad 2/2/2011Team 6: Defender2.
ECE 477 Design Review Team 1  Fall Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team 19  Spring 2013 Paste a photo of team members here, annotated with names of team members. Calvin Mwesigwa John Marston Noah.
Ryan McLean John-Michael Mulesa Joe Perrin Zach Schoenberger Formal Design Review.
ECE 477 Design Review Team 01  Fall 2013 Paste a photo of team members here, annotated with names of team members.
ECE 477 Design Review Team 4  Spring 2008 Zach Dicklin Amy Ritter Ian Bacon Eric Yee.
ECE 477 Design Review Group 11  Spring 2005 Paul Dulle Pat McLaughlin Randy Scheifele Chad Bjorklund David Meyer.
Xin Jin Zelun Tie Ranmin Chen Hang Xie. Outline  Project overview  Project-specific success criteria  Block diagram  Component selection rationale.
ECE 477 Design Review Team 2  Spring 2010 Digi-Brush Josh LongCaleb Ayew-ewKatie Schremser.
ECE 477 Design Review Group 14  Spring 2005 Paste a photo of team members here, annotated with names of team members.
Solar Telematics System ECE 477 Design Review, Team 8, Spring 2012 Paste a photo of team members here, annotated with names of team members. Craig Lechlitner,
ECE 477 Design Review Team 5  Fall 2007 Wes Chris Josh Dave.
 Project overview  Project-specific success criteria  Block diagram  Component selection rationale  Packaging design  Schematic and theory of operation.
ECE 477 DESIGN REVIEW TEAM 2  FALL 2011 Members: Bo Yuan, Yimin Xiao, Yang Yang, Jintao Zhang.
Shiv Yukeun Donghan Robert.  Project overview  Project-specific success criteria  Block diagram  Component selection rationale  Packaging design.
ECE 477 Design Review Group 7  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE Grande ECE 477 Design Review Team 3 - Fall 2008.
ECE 477 Design Review Team 09  Spring 2010 Luke Ethan Andy Dhruv.
ECE 477 Design Review Team 01  Fall 2010 Jigar Gandhi Chandler Wall John-Taylor Smith Eric Zarowny.
ECE 477 Design Review Team 2  Fall Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Group 2  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Group 11  Fall Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team 5  Fall 2009 Ben Carter – Jacqui Dickerson – Ian Oliver – Dennis Lee.
ECE 477 Design Review Team 9  Fall 2009 Josh Piron, Jacob Pfister Kevin Templar, Mike Phillips,
ECE 477 Design Review Team 2  Spring 2006 Prashant Grimella Andy Brezinsky Tim Sendgikoski Clark Malmgren.
ECE 477 Design Review Team 4  Fall 2006 Daryl Dave Will Ben.
ECE 477 Design Review Team 1  Fall 2006 Sumanth Peddamatham Alex Tucker Chris Arges Radhika Mulani.
ECE 477 Design Review Team 14  Spring 2006 Jason, Nathanael, David, David.
ECE 477 D ESIGN R EVIEW T EAM 5 MY ATM F ALL 2012 Tung Lun Loo Yu Chen Lim Chuan Yean Tan Xue Yuan Wong.
Team 6 DOODLE DRIVE Alexander Curtis Peachanok Lertkajornkitti | Jun Pan | Edward Kidarsa |
ECE 477 Design Review Team 3  Fall 2007 Steven Kingsley (Analog) Roy Scheck (Leader) Tony Liechty (Digital) Charles Lan (Software)
ECE 477 Design Review Team 10  Spring 2007 JUSTIN AZAD AFIFF NUHAIRIADAM.
ECE 477 Design Review Team 8(SLOW)  Spring 2006.
ECE 477 Design Review Group 5  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team 1  Spring 2008 Alan BernsteinIan AlsmanIlya VeygmanDarshan Shah.
ECE 477 Design Review Team 7  Spring 2008 Paste a photo of team members here, annotated with names of team members.
ECE 477 Design Review Team 3  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team 12  Spring 2006 EricDaniel Atandra Sriharsha Aasenda Silva Burman Vengapaty.
ECE 477 Design Review Team 4  Spring 2006 Justin Thacker, Matt Kocsis, Ian Snyder, Dustin Poe.
Colin Graber Jason Kohl Jacob Varnau Cameron Young ECE 477 Design Review Team 2 - Spring 2015 R.I.S.K.
Eric Tarun Craig Dave ECE 477 Design Review Team 9  Spring 2006 Galamback Chawla Noble Kristof.
ECE 477 DESIGN REVIEW TEAM 3  SPRING 2015 Garrett Bernichon Bryan Marquet John Skubic Tim Trippel.
ECE 477 Design Review Group 9  Fall 2005 Paste a photo of team members here, annotated with names of team members. Tim Miller Clif Barnes Drew Heinrich.
Treasure Chess ECE 477 Team 2 - Spring 2013 Parul Schroff, Brock Caley, Sidharth Malik, Jeremy Stork Design Review.
ECE 477 Design Review Team 10  Spring 2009 Scott Shaw Hussain Vasi Matt Sbai John Fawcett.
ECE 477 Design Review Team 2  Fall 2006 Wirelessly Integrated Menu System (WIMS) Ryan Coppa Lee Bush Aaron Replogle Neil Bedwell.
ECE 477 Design Review Group 5  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team BOAR  Fall 2011 Paste a photo of team members here, annotated with names of team members. Left to Right:
ECE 477 Design Review Team 1  Spring 2009 Paste a photo of team members here, annotated with names of team members.
ECE 477 Design Review Group 3  Spring 2005 “VoIP Connect” Ankur TrushalAshish Dushyant.
Defender Turret Based Defense System Brian Bentz Kirk Iler Stephen Wolf Fuhe Xu.
ECE 477 Design Review Group 3  Fall 2005
Turret Based Defense System
Presentation transcript:

ECE 477 Design Review Team 6  Spring 2011 Left to right: Kirk Iler, Brian Bentz, Stephen Wolf, Fuhe Xu

Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria Block diagramBlock diagram Component selection rationaleComponent selection rationale Packaging designPackaging design Schematic and theory of operationSchematic and theory of operation PCB layoutPCB layout Software design/development statusSoftware design/development status Project completion timelineProject completion timeline Questions / discussionQuestions / discussion

Project Overview Defender is a basic defense system designed to identify and neutralize hostile targets. It combines a number of modules to create a turret-mounted defense system. Modules: CoilgunCoilgun Motor systemMotor system Image processingImage processing Ethernet connectivityEthernet connectivity

Project-Specific Success Criteria 1.An ability to fire a projectile using magnetic force1.An ability to fire a projectile using magnetic force 2.An ability to aim the projectile by controlling of the azimuth and elevation angles of the barrel2.An ability to aim the projectile by controlling of the azimuth and elevation angles of the barrel 3.An ability to charge a capacitor bank to a variable voltage, up to 400V3.An ability to charge a capacitor bank to a variable voltage, up to 400V 4.An ability to gather images and perform target recognition and tracking4.An ability to gather images and perform target recognition and tracking 5.An ability for a user to enter commands and display the status of the turret through an external interface5.An ability for a user to enter commands and display the status of the turret through an external interface

Block Diagram

Component Selection Rationale CameraCamera –Canon VC-C50i with PTZ Atom BoardAtom Board CapacitorsCapacitors –3900μF –400V max electrolytics(x4). U32L

Microcontroller PIC24FJ64GB002PIC24FJ64GB002 –16bit –64KB flash/8k RAM –16MIPS –3.3V –44 TQFP –5 Timers –1 USB OTG –2 I 2 C –15 remappable pins

Firing Controls - IGBT Criteria:Criteria: –Voltage –Amperage –Heat dissipation, Failure mode –Price Part chosen:Part chosen: –APT200GN60JDQ4 600V, 283/600A600V, 283/600A 640W,.25°C/W640W,.25°C/W $42.60$42.60 No sinkNo sink

Step angle: 1.8°±5%Step angle: 1.8°±5% Rated voltage: 12VRated voltage: 12V Current per phase: 0.4ACurrent per phase: 0.4A Holding torque: 2kg/cmHolding torque: 2kg/cm Mass:0.2kgMass:0.2kg Motor 42BYG023-R

Stepper Motor Controllers DRV8821 from Texas Instruments Controls 2 stepper motors up to 1.5A each 8-40V stepper motors Microstepping modes Edge triggered digital stepping via PWM from Micro

Packaging Constraints Portability – Defender should be easily moved and installed. Weight – lightweight to allow for small motors EMI resistant – To protect circuitry from strong fields present in coil gun. Firing range – Target over a broad area. Keypad – Interface must be easily accessible.

Packaging Layout Four major physical components: – –Base: Divided metal box containing control circuitry, high voltage capacitors, and power supply. – –Rotator: Uses stepper motors to aim the Coil Gun; Mounted on top of Base. – –Coil Gun: Mounted on top of Rotator. – –Camera: Mounted on top of Base.

Schematic/Theory of Operation Subsections: High voltage Control microcontroller Capacitor bank Atom processor Motors

Power Supplies 3.3 V low drop out linear regulator Provides power to the control microcontroller Supplied by rectifier from high voltage system Switching 12 V power supply (4 Amps) Supplies power to the Atom and the motors Supplied by second transformer on Power PCB

Motor Microcontroller Controls 2 direct drive stepper motors with two coils each 10 heat sink grounds to copper heat sink Dedicated I 2 C port expander Commands include reset, direction, decay mode, step mode 1/8 th microsteps Sense resistors and voltage reference limit current to 400 mA

Control Microcontroller Receives commands from Atom Communicates information to and from circuitry I 2 C communication bus (400 kHz) USB connection to atom Bypass capacitors Reset circuit

Other Components The photogates will function by creating a logic high when an object passes through. These will be directly interfaced to general purpose I/O pins. Sends an interrupt directly to the microcontroller to signal available information Microcontroller collects information over I 2 C Keypad Encoder

Performs image processing and system command Communicates with control microcontroller over USB Communicates with user interface over Ethernet. Atom processor

Power PCB Schematic

High Voltage Power Changed to TRIAC circuit to switch power.Changed to TRIAC circuit to switch power. Measure DC voltage using ADC.Measure DC voltage using ADC.

Rectifiers and I2C 12V transformer and bridge rectifier connects to Communication Control PCB.12V transformer and bridge rectifier connects to Communication Control PCB. 3.3V bridge rectifier.3.3V bridge rectifier.

ADC, LED switch, Coil Protection Diodes Capacitor bleed circuit connects to capacitor bank.Capacitor bleed circuit connects to capacitor bank. ADC measures current through a voltage divider.ADC measures current through a voltage divider. Protection diodes anti-parallel to coil.Protection diodes anti-parallel to coil.

Power PCB Layout

Communication PCB Layout

Software Design/Development Status ComputerComputer –Single Executable: GUI - implementedGUI - implemented Java.swing componentsJava.swing components Ethernet - testingEthernet - testing Wrapped in to GUI componentsWrapped in to GUI components Jnetpcap libraryJnetpcap library

Software Design/GUI Prototype

Software Design/Development Status MicrocontrollerMicrocontroller USB interface- not yet begunUSB interface- not yet begun Communicates with atom boardCommunicates with atom board I2C bus to interface to:I2C bus to interface to: Motor microcontrollerMotor microcontroller Charging controlsCharging controls

Software Design/Development Status Atom BoardAtom Board –Single Executable: Ethernet libraries- testingEthernet libraries- testing Winpcap libraryWinpcap library USB libraries- not yet begunUSB libraries- not yet begun PIC family librariesPIC family libraries

Camera status Microsoft Visual Studio 2008 configuredMicrosoft Visual Studio 2008 configured OpenCV image recognition libraries and camera motor libraries installedOpenCV image recognition libraries and camera motor libraries installed Drivers installed for S-Video frame grabber and motor USB to serial cablesDrivers installed for S-Video frame grabber and motor USB to serial cables Image capture functioning on computer intended for compilingImage capture functioning on computer intended for compiling Minor configurations still needed on Atom, which will be running the executablesMinor configurations still needed on Atom, which will be running the executables

Project Completion Timeline 3/11 PCB submission3/11 PCB submission 3/21Atom board Ethernet communication3/21Atom board Ethernet communication Image processing recognizing stationary targets Start populating PCBs and testing 3/28Start programming microcontroller3/28Start programming microcontroller Begin physical packaging 4/10Completed packaging and testing4/10Completed packaging and testing 4/11Start system integration4/11Start system integration 4/18Documentation and paperwork4/18Documentation and paperwork 4/27PSSC Demos4/27PSSC Demos

Questions / Discussion