PA 5.3.P6.JA.01.0 “High voltage power supply for neutral beam test facility (NBTF)” JADA 15 th /June, 2015 Request for ; A change in allocation of money.

Slides:



Advertisements
Similar presentations
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Advertisements

ISTISNA’.
USC Clinical Trials Office (CTO) Answers to CTOs who, what, when, and how questions Soheil Jadali Director, Clinical Trial Office.
Funds administration, also referred to as funds control, funds disbursement, funds management, and escrow, is a method that sureties use to offset the.
GRANT AGREEMENT FOR AN ACTION WITH MULTIPLE BENEFICIARIES.
Chapter 3 Project Initiation
Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
MAIN PREMISES TO THE FINANCIAL SECURITY RULES USED BY THE GAS TRANSMISSION OPERATOR GAZ-SYSTEM S.A. IN TRANSMISSION CONTRACTS AND NETWORK CONNECTION AGREEMENTS.
Conducting Collaborative Projects Part 4 OSP Awareness Feb 16, 2011 osp.syr.edu
1 Appeal to ERCOT Board Regarding Use of Fuel Oil Index Price (FOIP) Larry Gurley TXU Wholesale June 19, 2007.
Massimiliano Di Pace1 INTERNATIONAL PAYMENTS Handling international payment can be complicated and risky The problems can be: - currency - transfer of.
Large Scale Projects Aleksejs Šaforostovs LSP Project Manager Joint Technical Secretariat.
Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana.
TUTORIAL Grant Preparation & Project Management. Grant preparation What are the procedures during the grant preparations?  The coordinator - on behalf.
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
Optimism R&D to be resumed! Three beam tests planned at Kek, –Hybrid target (KEKB Linac) –Liquid target (ATF Linac) –Boron-Nitride Window (KEKB) –(Starting.
WCI LEA UPDATE MAY 2, 2014 RI Department Of Education Wireless Classroom Initiative Cynthia Brown, Director Office of Statewide Efficiencies Craig Hockenbrough,
REPLACEMENT AND MAINTENANCE OF LIFTS GIVING ACCESS TO LHC UNDERGROUND AREAS TENDERING PROCEDURE IT-4056/EN 105 December 2014 Floris Bonthond.
Project Implementation training session for actions financed under the Call for Proposals Joint Managing Authority Levi,
NOV-3733-SL-9715 Carbones KOM - May 10-11, 2010 – Toulouse, France 1 KICK-OFF MEETING May 10-11, 2010.
INFSO-RI Enabling Grids for E-sciencE Financial Status EGEE Collaboration Board – Athens – April 20 th, Severine Bergerot.
Invitation To Tender Procedure IT – 4005/en Provision of engineering studies and drawings, the supply and installation of piping and its accessories.
H11.pE-3.0 Welcome Master of Project Management / International project contracts - r 1.1 – slide 1 International project contracts E.S.C.T
INTERREG IVA 2 Mers Seas Zeeën Crossborder Cooperation Programme Part-financed by the European Regional Development Fund (ERDF) Legal framework:
TENDERING PROCEDURE IT- 3927/EN
Islamic Trade Finance Murabaha: The Bankers’ Perspective Saleem Khan.
Islamic Financial Accounting Standard-1
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
To ensure compliance before July 31 st CRC Allowance Ordering, Purchasing and Surrendering process.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4103/EN/LHCb Design, Supply, Installation and Commissioning of an HVAC system, a Smoke.
AISD Bookkeeper and Admin Training 2013 STANDARD SERVICE AGREEMENT Bowie High School August 8, 2013 STRONG LEADERS STRONG SCHOOLS BUILDING ON STRENGTHS.
Financial Management MW-Sonet 16 th – 19 th of March 2011, Turkey.
Tacis Contracting Procedure Documents to be submitted together with the application:  Original Declaration by the Financial Lead Partner for Tacis  Partnership.
Status report: 1MV post insulator in HVD1 In the transmission lines of the high voltage power supply procured by JADA, 1MV post insulators manufactured.
EXAMPLE – Quality Control Plan For Contractors To view the Pre-Award Phase presentation, please go to: Click on "PIPS"
WSSB Capacity Enhancement Workshops The Uganda Performance Contract & Purpose 2. Performance Key Elements 3. Water Board’s Rights & Obligations.
1 EURO REPORTING – Doing Business With The EC –. 2 Index  Relationship Overview  The FAFA Principles  Gain/Loss Scenarios  Financial Risk  Possible.
Bank guarantees or letters of guarantee Know the letter of guarantee or bank guarantee is a written undertaking by a Bank, usually at the request of the.
Geographical Enlargement of CERN Associate membership Principles and criteria S. Intoudi / 8 July
1 Overall status of the procurement activities for the items transferred from F4E to JAEA F4E-JAEA Bi-lateral Meeting #12 St. Paul-lez-Durance 15 June.
NWPP Multiple-Award Technical Support Contract (eff. 08/2005) Unit 8 Unit 8 “Managing the Task Order”
Oracle Services Procurement
OBSERVAL CONTRACT 25/01/2008 2/10/ Summary 2/10/ Agreement & its annexes First pre-financing payment Progress report 2 nd pre-financing payment.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4134/EN/LHC Supply and Commissioning of HVAC Systems for Five LHC Surface Buildings B.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4082/EN Design, Supply, Installation and Commissioning of the ventilation of the BAF3.
In September of 2012 the RA Government made amendments in the Resolution No 168 on ‘Regulation of Procurement Procedures". 1. It is the responsibility.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
1 Chapter 8 karvaytMélKMerag nig kareFVIr)aykarN_ nig karbiTKMerag Project Evaluation, Reporting, and Termination.
Technical Assistance Office TCP Projects 2005 Contractual and Financial Management Administrative and Financial Handbook Prepared by IA, 14/12/2001 SOCRATES.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
PSD2 and W3C Impact for account and payment processing.
MS Invoice E-Invoice Solution Overview March 2016.
CDR for the ESS Linac Magnets for LWUs (pulsed quadrupoles and DC correctors) Closeout May 4, 2016 J.G. Weisend II, Chairman CDR.
Ismar Financial report procedures. Ismar Financial reporting For each reporting period of activity Each partner shall produce a “Periodic Management Report”
EC-UNDP Workshop on Formulating and Implementing Electoral Assistance Projects in the Context of the EC-UNDP Partnership Reporting Pierre Harzé, Deputy.
Contract Compliance Training
Award Set-Up and Advances
By Lillian Irene Stormo, HiB
Bills of Quantities Introduction to FIDIC - Bills of Quantities -
Content of Tender Dossier Instructions to Tenderers
4.4 Procurement by grant beneficiaries
Contract Compliance Training
Congratulations, your application has been successful… …what next?
CMGT 410 Education for Service-- snaptutorial.com.
CMGT 410 Teaching Effectively-- snaptutorial.com.
IMPACT OF EASA ON MAINTENANCE ORGANISATIONS IN CANADA J Hall
Status of DS Procurement
Exchange of information with the WP.29 secretariat
Review of the 1958 Agreement
Presentation transcript:

PA 5.3.P6.JA.01.0 “High voltage power supply for neutral beam test facility (NBTF)” JADA 15 th /June, 2015 Request for ; A change in allocation of money for A change where money are transferred into two bank accounts instead of one Amendment of PA to achieve these changes

Background JADA initially thought that a Japanese company would become the main contractor for the on-site installation work and inspection of the components. However, concerns about compliance with Italian laws/regulations and differences in work conditions caused the Japanese company to not accept being the main contractor. It is also rather difficult for JAEA to enter into a direct contract with Italian companies. In Sep/2014, we asked F4E to make a contract with an Italian company on behalf of JADA, but that request was not accepted. Then, we asked RFX being the host organization of the NBTF to help us. At present, under the bi-lateral agreement between RFX and JAEA, it is agreed that the contract for workers will be done by RFX with technical support by JAEA. The PA remains the responsibility of JADA. JADA shall completely support the technical aspects of on-site work; make the detailed work procedure for on-site work; join in discussions with Italian companies; and assess these companies with RFX colleagues. Financially, some money for this PA shall be transferred to RFX for the on-site work contract, which will require changing the allocation of money and accounts those money are transferred into.

Present status Discussion to execute the Bi-lateral agreement between RFX and JAEA is in the final stage. Then, a contract award will be started to make a contract between RFX and Italian company by the end of August. Then, the on-site work will be started from Dec/2015 as scheduled. Meeting between RFX colleagues and JAEA to finalize the documents of the agreement.

Reasons for these changes Differences in the style of contract: Typical payment procedure in JAEA is “a single payment at the end of the contract”. This is consistent with current Annex C. However, the Italian company requires multiple payments throughout the contract.  The allocation of money for must be modified to fulfill this payment scheme. Please note that there is no change in the total cost. Risk of fluctuation in the exchange rate Once the money is transferred to JADA, it is immediately changed from EUR to JPY. JAEA does not allow money to be kept in Euros. It could cause the loss of the amount of money due to exchange rate. To mitigate the risk of a fluctuation in the exchange rate, we need to send the money from F4E to RFX, directly. JADA is ready to submit the revised CAS table and Annex C of the PA to IO.

Amendment of Annex C Year Total kIUA (kIUA) Sub total Period to submit the invoice to F4E JanSepJanSep To JAEA(kIUA) To RFX(kIUA) Original Annex C Request in this amendment Year Total kIUA A breakdown of the money transfer kIUA (A) The bank account of RFX is newly added. (B) Allocation of money is changed as follows.

Phase Ⅲ : Acceptance Test of NBTF2.708JA536E Phase Ⅲ : Completion of installation1 (200kV, 400kV, 600kV DCG) JA536E173XX1 Completion of installation2 (Transmission line 1 & 2, High voltage deck 2, 800kV, 1MV DCGs, DC filter, TPS) JA536E173XX2 Completion of installation3 (Transmission line 3,1MV Insulating transformer, DL) JA536E173XX3 Acceptance Test of NBTF (including installation of SCD) JA536E CAS table in the main PA (1) The present CAS milestone(kIUA): EU_PA_5_3_P6_01_0_NBPS_Attachment1_CAS_34ZAYN_v1.4 (2) Amendment of CAS milestones (kIUA) : kIUA in 2016 There is only one milestone for on-site work at the final stage. However, additional milestones during the installation are to be added in the CAS table.

Summary To complete the on-site work in compliance with Italian laws/regulations, RFX has accepted to make the contract for the on-site work of JA power supply with an Italian company. The payment scheme will be changed from the typical one “single payment at the end of the contract” to “multiple payments throughout the contract period” according to the requests of the Italian company. JADA would like to get your understanding about the following. Change in allocation of money for Transfer of money into two accounts (JAEA and RFX) Amendment of PA to achieve these changes Afterwards JA will start the official procedure to IO.