COST ES0803 Developing Space Weather products and services in Europe Second Management Committee Meeting Frascati, 1 and 3 April 2009.

Slides:



Advertisements
Similar presentations
Space Weather Web Portal Coordination (Draft for Discussion) A. Glover, A. Belehaki.
Advertisements

Polarisation as a tool to study the solar system and beyond COST Action MP 1104.
Introduction on COST instruments and procedures Gabriela Cristea, Senior Administrative Officer Kick Off Meeting for COST Targeted Network TN1302 The voice.
European COoperation in the Field of Scientific and Technical Research Role and rules of procedure for Management Committee Carine Petit Science Officer.
Action TD1002 European network on applications of Atomic Force Microscopy to NanoMedicine and Life Sciences (AFM4NanoMed&Bio) Management Committee Meeting.
Linn OHLSSON, IATI Secretariat Rudolphe PETRAS, Development Co-operation Directorate, OECD IATI Steering Committee, 3 October 2013 The Common Standard.
Ontario Problem Gambling Research Centre April 1, 2010.
Paide, Estonia 28/08/2014 Annual COST Seminar - News from COST Office Dr Luule Mizera COST ISCH Science Officer.
FP1105: Understanding wood cell wall structure, biopolymer interaction and composition: implications for current products and new material innovation Management.
COST – ES0803 WG2: Space Weather Products and Services.
INGAS General Assembly, Oulu, 25&26 May 2011 INGAS INtegrated GAS Powertrain 1 INGAS 30 months meeting Oulu, 25&26 of May 2011 General Assembly Coordinator.
European CO operation in the Field of S cientific and T echnical Research.
- 065/ New generation BIOMIMETIC and customized IMPLANTS for BONE ENGINEERING NEW GENERATION BIOMIMETIC AND CUSTOMIZED.
With the Support of the TEMPUS programme of the European Union Information on PRIUM: Promoting a model of Integrated University in the fYR of Macedonia.
Welcome to the Seventh European Space Weather Week A Glover & A Belehaki on behalf of the ESWW7 Programme Committee.
December 2005 European COoperation in the field of Scientific and Technical research Gabriela Cristea Administrative Officer for ICT COST Office.
Action FP1005: Fibre suspension flow modelling - a key for innovation and competitiveness in the pulp & paper industry 2 nd MC Meeting – Nancy/FR 13/10/2011.
European Cooperation in the field of Scientific and Technical Research COST is supported by the EU RTD Framework Programme ESF provides.
THE ADVANCED TECHNOLOGY ENVIRONMENTAL AND ENERGY CENTER (ATEEC) Summative External Evaluation July 1, 2013 – June 30, 2014 PRELIMINARY OUTLINE.
Application to Graduate Process—MS, Ph.D. Approved by GSC Chair on or before 3 rd Friday of term Ph.D. Master’s MS w/o Thesis Report on Final Examination.
European Cooperation in the field of Scientific and Technical Research COST is supported by the EU RTD Framework Programme ESF provides.
COST Action MP1307 Stable Next Generation Photovoltaics: Unraveling Degradation Mechanisms of Organic Solar Cells by Complementary Characterization Techniques.
COST (European Cooperation in Science & Technology) An Introduction to the COST Grant System Dr. Mafalda Quintas (TD Science Officer) Ms. Andrea Tortajada.
STSM guide COST Action FP Fibre suspension flow modelling... 1 COST Action FP1005 Fibre suspension flow modelling - a key for innovation & competitiveness.
Management & Technology Consultants A Good Practice Framework to Reinforce the Exchange of Good Practice in eGovernment IST4Balt WORKSHOP June.
INTERIM MEETING/ VIENNA PART 1 THE STATUS of the PROJECT IMPLEMENTATION.
1 European COoperation in Science and Technology COST is supported by the EU RTD Framework ProgrammeESF provides the COST Office through an EC contract.
RACS coordination meeting 29 May 2008 Brussels. Review of the functioning of the RACs.
COST is supported by the EU RTD Framework Programme ESF provides the COST Office through an EC contract COST MP0801 Kick off meeting Physics of Competition.
Project overview: objectives, work programme & management guidelines FIRST MEETING OF EUROPEAN POLICY CORE GROUP Thursday, 03 March 2005 in Berlin PRESENTATION.
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
ES0601 Action progress report COST ES0601 MC5Bucuresti, May 2010 Advances in HOmogenisation MEthods for climate series an integrated approach COST.
2 February 2009Ö. Skeppstedt1 FLAIR Collaboration Meeting 2–3 February 2009 Manne Siegbahn Laboratory, Stockholm FAIR status from the AFI chairman point.
STSM s Short Term Scientific Missions Report, Trieste Meeting Sep.12.
Update from the COST Association to the Management Committee Dr. Fatima Bouchama Science Officer- COST Association COST FP1105 San Sebastian Meeting (ES)
Discovery Phase: where do we go from here? Co-directors contact information: Dr. Maureen Powers, Department of Cell Biology,
European Cooperation in the field of Scientific and Technical Research COST is supported by the EU RTD Framework Programme ESF provides.
European Commission DG Enterprise VIRTUAL ENVIRONMENT FOR INNOVATION MANAGEMENT TECHNIQUES VERITE Kick-off meeting Thessaloniki November 2001.
NCI Clinical Trials Reporting Program CTRP User Meeting February 1, 2012 Gene Kraus CTRP Program Director.
GUIDE FOR APPLICANTS 2005 What’s new in Tempus ? Tempus.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
Action MP0604 “Optical Micro-Manipulation by Nonlinear Nanophotonics” News from the COST-Office 4 th Management Committee Meeting Ischia (Italy) on 04/09/2008.
European COoperation in the field of Scientific and Technical research A New Era has begun for COST.
FP1105: Understanding wood cell wall structure, biopolymer interaction and composition: implications for current products and new material innovation Empa.
COST European COoperation in Science and Technology COST European COoperation in Science and Technology Belspo, 14 March 2014 Benjamin MONNOYE, Attaché.
Orientation and Summer Institutes Implementer’s Forum October 2005 Susan Barrett PBIS Maryland.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Going from EGEE-NA ES cluster to EGI SSC.
STSM guide COST Action FP Fibre suspension flow modelling... 1 COST Action FP1005 Fibre suspension flow modelling - a key for innovation & competitiveness.
European COoperation in the Field of Scientific and Technical Research COST Office Overview & News and Managing Your COST Action in 2007 E. Paola de Rose.
Fabrizio Gagliardi EGEE Project Coordinator EGEE is proposed as a project funded by the European Union under contract IST
European Cooperation in the field of Scientific and Technical Research COST is supported by the EU RTD Framework Programme ESF provides.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
Monitoring Visit to NatRisk Project
Preparation of the Self-Study and Documentation
NATA Foundation Student Grants Process
NATIONAL DOSE REGISTER Steering Committee Meeting 28 August 2015
Experiences of the Association of European Election Officials as ACE Regional Centre Overview First part of 2009 Stockholm, Sweden, June 2009.
COST Office News and Managing Your Action up to May 2009
Update from the COST Association to the Management Committee
HERE report 2015 – good practices and recommendations
Statistical capacity building in the ENP South countries
SOCIAL DIALOGUE WITHIN EUPAN
19th meeting of the WG GES 22/03/2018
NEW GENERATION BIOMIMETIC AND CUSTOMIZED IMPLANTS FOR BONE ENGINEERING
Update from the COST Association to the Management Committee
COST and COST Actions Participation of Georgian researchers
SOCIAL DIALOGUE WITHIN THE SCOPE OF EUPAN
WP 1 Management and Coordination
Presentation transcript:

COST ES0803 Developing Space Weather products and services in Europe Second Management Committee Meeting Frascati, 1 and 3 April 2009

Status of Action MoU : 229/08 CSO Approval date : 18/06/2008 Entry into force : 07/08/2008 End of Action : 15/11/2012 Signatories: 20 countries Intention to accept the MoU: 1 country

Status of Action DateStatus Austria18/12/2008Confirmed Belgium07/08/2008Confirmed Bulgaria21/08/2008Confirmed Cyprus22/10/2008Confirmed Czech Republic05/09/2008Confirmed Finland13/10/2008Confirmed France01/10/2008Confirmed Germany07/08/2008Confirmed Greece22/09/2008Confirmed Ireland07/08/2008Confirmed Italy21/10/2008Confirmed Norway23/10/2008Confirmed Poland14/11/2008Confirmed Romania03/02/2009Confirmed Serbia10/12/2008Confirmed Slovenia05/02/2009Confirmed Spain07/08/2008Confirmed Sweden30/01/2009Confirmed Switzerland21/08/2008Confirmed United Kingdom07/08/2008Confirmed Total20 Intentions to accept the MoU Country Status IsraelIntention Total1

Activity of the Action (November 2008 – March 2009) 1.Kick off meeting, Brussels, November Steering Group meeting, Brussels, 29 January Submission of the Space Weather School proposal to ICTP, Trieste (15 February 2009) 4.Development of the web site of the Action 5.Collection of more than 60 Expressions of Commitment 6.Organization of the first Action’s workshop (48 abstracts submitted) 7.Preliminary formation of the WG teams 8.Paper published in Space Weather (AGU) 9.Participation the final meeting of the COST Action 296

Activity of the Action (November 2008 – March 2009) Kick off meeting, Brussels, November 2008 Main decisions taken: Chair: Anna Belehaki Vice Chair: Mauro Messerotti Grant Holder: Ronald Van der Linden Rapporteurs: Jurgen Watermann, Pavel Hejda WG1 : Jürgen Watermann (Leader), Consuelo Cid (co-Leader) WG2 : Ronald Van Der Linden (Leader), Henrik Lundstedt (co-Leader) WG3 : Vida Zigman (Leader), Mauro Messerotti (co-Leader) Steering Group: Chair, co-Chair, WG Leaders, Grant Holder Editorial Group: Chair, co-Chair, WG3 Leader, plus two MC members: Susan McKenna and Jan Lastovicka (TBA) Webmaster: Computer expert from the technical staff of NOA under the supervision of the Action’s Chair (Themos Herekakis)

Activity of the Action (November 2008 – March 2009) Steering Group meeting, Brussels, 29 January 2009 Main items discussed: 1.COST ES0803 web site 2.The formation of subgroups 3.The list of working group members according to the letters of commitment 4.Scientific programme of the first Workshop of the Action (1-3 April 2009) 5.Procedure for experts invitation 6.The European Space Weather Portal Constitution 7.The European Space Weather Journal 8.The ICTP school 9.The Action’s Budget

Activity of the Action (November 2008 – March 2009) Formation of Groups structure WG 1. Advanced methods to model and predict space weather effects Jürgen Watermann, Consuelo Cid SG 1.1: Progress in scientific understanding of space weather - Natalia Ganushkina SG 1.2: Performance of available research and operational models - Peter Wintoft SG 1.3: Improvement of operational models - Tsvetan Dachev SG 1.4: Codes for new space weather products and services - Daniel Heynderickx WG 2. Space weather products and services Ronald Van Der Linden, Henrik Lundstedt SG 2.1: Identification of current space weather resources – Iwona Stanislawska SG 2.2: Market segmentation including cartography and users requirements - TBC SG 2.3: Feasibility study for new market-oriented products and services - Mike Hapgood WG 3. Exploitation, Dissemination, Education, Outreach Vida Zigman, Mauro Messerotti SG 3.1: Upgrade of the European Space Weather Portal – Decision Pending SG 3.2: Dissemination of advanced scientific and technical results – Jan Lastovicka SG 3.3: Seminars and training courses – Mauro Messerotti SG 3.4: General public outreach to the non-specialist - TBC

Formation of working teams Activity of the Action (November 2008 – March 2009)

Formation of working teams Activity of the Action (November 2008 – March 2009)

Paper published in Space Weather (AGU): Belehaki, A., J. Watermann, J. Lilensten, A. Glover, M. Hapgood, M. Messerotti, R. van der Linden, and H. Lundstedt (2009), Renewed Support Dawns in Europe: An Action to Develop Space Weather Products and Services, Space Weather, 7, S03001, doi: /2008SW Invitation to participate to the final meeting of the COST Action 296: Mauro Messerotti presented an overview of the COST ES0803 Action Presentation of the COST ES0803 Action at SOTERIA workshop on March 23-24, 2009 in Finland by Jurgen Watermann Presentation of the COST ES0803 Action at the Assembly of the European Union of Scientific Journalists Associations (EUSJA) on March 14, 2009 in Trieste by Mauro Messerotti.

Budget status Kick off meeting24,739 Steering Group meeting2,735 2 nd MC meeting and workshop42,000 (estimated) Frascati Workshop subsidy3,000 Total72,474

from COST office (22/3/2009) Dear Action Chair, … You will be informed quite soon officially by our Director about the start date of the migration to COST Grant System. From this date, we will interact with you and the Grant Holder quite closely to prepare the Grant Agreement. The Vademecum on the web has been updated in its Chapter 6 (CGS) and can be consulted and downloaded under: Will migrate: 637 and all Actions ending beyond December … Finally, the CSO approved in its meeting of March in Berlin new templates for the Annual Progress Reports and for the Final Administrative Reports. I was just informed that all the Actions (new, on-going, and ending) will have to use it. We will get additional internal instructions in the course of this week. Our trainee colleague, Ms Isabel Pino de Juana, will contact you in 2-3 weeks about the APR/FAR. The Rapporteurs will also have to follow a new template to assess the progress of the Actions. You will receive the template of the Evaluation Report from Isabel together with APR/FAR ones. … I thank you very much for your attention to this and your patience and understanding in this multi-level transition period, Best regards, Carine

COST allocation process ES0803 Carine Petit (Scientific Officer) Stéphanie Beauloye (Administrative Officer) Note to the MC: Please contact your Action’s Chair for any inquires you may have. Please do not contact the COST SO and AO.

Reimbursement Documents Please send your scanned documents by Monday 6 April to: Anne Vandersyppe

COST ES0803 MC 2 nd Part Friday 3 April 2009 (15:00 – 18:30) Agenda ▪ The new proposal for the follow-on ionospheric COST Action ▪ Adoption of the minutes of the kick-off meeting ▪ Progress report of working groups WG1 Report WG2 Report WG3 Report ▪ Discussion and adoption of the reports ▪ Action planning Activity plans of WGs Annual Progress Conference (preparation and/or feedback from DC) Action Budget Planning Action Planning (including meetings) Location and date of next meeting Long-term planning (including anticipated locations and dates of future meetings) ▪ ESA SSA and links to COST ES0803 ▪ STSM status, applications ▪ Applications received from non-COST Institutes to join the Action ▪ Request for new members ▪ Promotion of gender balance and of Early Stage Researchers (ESR) ▪ Web news ▪ AOB ▪ Closing

Applications received from non-COST institutes to join the COST Action ES0803 CountryInstitutionExpert Proposed involvement in COST ES0803 Russia Institute of Terrestrial Magnetism, Ionosphere and Radio Wave Propagation (IZMIRAN) Andrei Mikhaylov Participation in SG1.2 and SG1.3 Armenia Alikhanyan Physics Institute Ashot Chilingarian Participation in WG1, WG2, WG3 Russia Space Research Institute (IKIRAS) Tamara Breus Participation in WG1 and WG3 Russia INSTITUTE OF SOLAR- TERRESTRIAL PHYSICS (ISTP) RUSSIAN ACADEMY OF SCIENCES SIBERIAN DIVISION Alexandr Potapov Participation in WG1

Early Stage Researchers (ESR) Early Stage Researcher: less than PhD + 10 years including researchers still working on their PhD or Master Degree Open Call participation and WG leading Increased duration of STSMs beyond 3 months 3 ESSEM Conference Grants per year of 3000 € for attending International Conference (abstract for an oral presentation must be accepted) More Training Schools At least once a year, an Action workshop should foster the participation of ESR Next collecting date for ESR Conference Grant: to be decided in June at the next DC Committee and will be communicated to the Action’s Chair

The Annual Progress report should be submitted to the COST Office by 15 May The Annual Report template hasn’t been circulated yet by COST The Annual ESSEM Progress Conference will be organised this year by the Vice-Chair of ESSEM Domain, Dr Ipek Erzi, and will be held in Istanbul on June To all WG Leaders: please send to the Chair your progress report until 27 April Annual Report

Budget Planning April 2009 – May 2009 Meeting TypeDatePlaceAvg per personPlanned to be reimbCostTotal ESWW6 PC meetingMay 2009Observatoire de Paris STSM BeneficiaryDateFrom CostTotal Two STSM 1500 EUR / STSM General Support Grants TitleDate CostTotal Web master Total costs11.000

Budget Planning June 2009 – May 2010 Indicative Budget : 120,000 EUR Meeting TypeDatePlaceAvg per personPlanned to be reimbCostTotal ESWW6 PC meetingSeptember 2009TBD Second MC and ESWW616-20/11/2009Brussels, BE SG meetingJanuary 2010TBD Third MCM/WorkshopMarch/April 2010TBD ESWW7 PC meetingMay 2010TBD STSM BeneficiaryDateFrom CostTotal Four STSM TBC 1500 EUR / STSM Meeting Support TitleDatePlace CostTotal ESWW616-20/11/2009Brussels, BE Third MC/WorkshopMarch/April 2010TBD General Support Grants TitleDate CostTotal Web master Schools TitleDatePlace CostTotal ICTP schoolMarch or October 2010 ICTP, Trieste, IT Overhead 15% of direct costs Total costs136,500 Total costs incl. OVRH

STSMs: Proposals expected !!! April – May 2009 June 2009 – May 2010 All requests for STSMs must be submitted 4 weeks in advance. The Steering Group can approve STSMs requests in they will arrive after this MC meeting.

Proceedings of this workshop Presentations will be first uploaded to the workshop web site. In May the presentations will be transferred to the main website of the Action. The WG leaders in collaboration with the Editorial Board will prepare a workshop summary.

Journal Committee Iwona Stanislawska Jean Lilensten Vida Zigman Susan McKenna Jurgen Watermann Mauro Messerotti Issues to be investigated by the end of April: 1. Type of Journal (Open access is a request) 2. Costs for the setup of the Journal 3. Copyright issues (Title of the journal, articles, etc.) 4. Editorial Board 5. Commitments and rights of COST/COST ES0803 and of the publisher