RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme RENAISSANCE - LYON - FRANCE 1 Technical seminar (WP0.

Slides:



Advertisements
Similar presentations
RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europea dentro del Sexto Programa Marco 1 6th RENAISSANCE PSG session, Milan,
Advertisements

RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europea dentro del Sexto Programa Marco 1 5th RENAISSANCE PSG session, Zaragoza,
RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europea dentro del Sexto Programa Marco 1 technical session WP0 State of.
RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europea dentro del Sexto Programa Marco 1 PSG meeting & minutes, Friday.
The Implementation Structure DG AGRI, October 2005
Characteristics of projects in EU research programmes
Support and Inclusion of students with disabilities at higher education institutions in Montenegro – Procedure for collecting valid documentations.
Key issues in project reporting Jakub Rutkowski Project Annual meeting , Hannover.
GENIUS T4 - September 2014 GENIUS T4 Teleconference X. Luri.
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program RENAISSANCE - LYON - FRANCE 1 RENAISSANCE LYON WP 1 Progress.
Béatrice COUTURIER Grand Lyon RENAISSANCE LYON WP Progress and Plans WP 1.1: Energy Policy, Planning, Resarch and Development.
Info Day on New Calls and Partner Café Brussels, 8 September 2010 How to apply – Budget and Reporting.
Malorie CLERMONT Local Leader on WP1.5 - Hespul RENAISSANCE LYON – 28/04/2009- Lyon Technical Seminar WP 1.5: Socio-economic activities – Presentation.
RENAISSANCE : a CONCERTO project financed by the European Commission on tne six framework programme RENAISSANCE - LYON - FRANCE 1 RENAISSANCE LYON WP Progress.
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme RENAISSANCE - LYON - FRANCE 1 WP0.1 (international.
RENAISSANCE : a CONCERTO project financed by the European Commission on tne six framework programme RENAISSANCE - LYON - FRANCE 1 RENAISSANCE LYON WP Progress.
RENAISSANCE : a CONCERTO project financed by the European Commission on tne six framework programme RENAISSANCE - LYON - FRANCE 1 RENAISSANCE LYON Introduction.
STRUCTURE SCIENTIFIC REPORT / MANAGEMENT REPORT Progress / objectives (WP and project level) Progress / milestones (WP and project level) Progress / deliverables.
Research Infrastructures Seminar for I3 and CA Project Co-ordinators 12 November 2004, 1 Management and Implementation of I3 and CA Contracts Seminar for.
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
APRE Agency for the Promotion of European Research Lifecycle of an FP 7 project Caterina Buonocore Riga, 13th September, 2007.
NOV-3733-SL-9715 Carbones KOM - May 10-11, 2010 – Toulouse, France 1 KICK-OFF MEETING May 10-11, 2010.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
Part-financed by the European Union European Regional Development Fund and European Neighbourhood and Partnership Instrument Activity reporting Baltic.
EU-IndiaGrid (RI ) is funded by the European Commission under the Research Infrastructure Programme 1 Project Reporting in FP6:
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
Béatrice Couturier & Malorie CLERMONT Local coordination - Grand Lyon & Hespul RENAISSANCE LYON WP Progress and Plans WP 0.2: National Management.
Reporting during the lifetime of the project Moldova – Research Horizon 30 January 2013 Kristin Kraav.
Project overview: objectives, work programme & management guidelines FIRST MEETING OF EUROPEAN POLICY CORE GROUP Thursday, 03 March 2005 in Berlin PRESENTATION.
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
Monica Pantea, MANETPCC meeting in Groningen 2006 Time Schedule of the EURONS Annual Report End of reporting period Deadline of submission.
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme RENAISSANCE - LYON - FRANCE 1 WP0.1 (international.
Dissemination leaders Hespul & Grand Lyon RENAISSANCE LYON WP Progress and Plans WP 4: Dissemination and Promotion.
Volvox Finance 2 How we will manage the Finance Angela Pettit – Contracts Officer.
Green Partnerships Local Partnerships for Greener Cities and Regions Study visit and 3 rd Steering Committee meeting Freiburg, 14 – 18 October 2013.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
Evaluation Plan New Jobs “How to Get New Jobs? Innovative Guidance and Counselling 2 nd Meeting Liverpool | 3 – 4 February L Research Institute Roula.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
Malorie CLERMONT Local coordination - Hespul RENAISSANCE LYON WP Progress and Plans WP 1.5: Socio-economic activities.
Role of the Secretariat The Secretariat will be responsible for the co-ordination and enhancement of research and networking activities within MariFish.
Malorie CLERMONT Local coordination & Hespul RENAISSANCE LYON WP Progress and Plans WP 4: Dissemination and Promotion.
“Reporting Procedure for I3” Seadatanet kick-off Heraklion, June 8-9, 2006 Lorenza Saracco, European Commission DG Research.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
EPOCA – 11. June EPOCA Project Management (WP1): Deliverables and reporting 11. June 2008.
Malorie CLERMONT Chargée de mission & Hespul RENAISSANCE LYON WP Progress and Plans WP 1.5: Socio-economic activities.
Part-financed by the European Union Reporting system Joint Technical Secretariat Information Seminar for Latvian Project Partners Riga, 29 April 2009.
INCO 3739 Integrating Multiple Demands on Coastal Zones with Emphasis on Aquatic Ecosystems and Fisheries Third Annual and Final Reporting 4th Project.
Negotiation of Proposals Dr. Evangelos Ouzounis Directorate C DG Information Society European Commission.
Number: TR/06/B/F/PP/ WASTE-TRAIN VOCATIONAL TRAINING, EDUCATION, CONVEYING INFORMATION ON UP-TO-DATE WASTE MANAGEMENT PRACTICES TO DECISION MAKERS/STAFF.
Samir BOUKHALFA AGENCE LOCALE DE L’ENERGIE DE L’AGGLOMERATION LYONNAISE RENAISSANCE LYON – Meeting in Milano 27-29/10/2008 WP Progress and Plans WP 1.3:
Malorie CLERMONT / Béatrice Couturier Local coordination - Hespul & Grand Lyon RENAISSANCE LYON – 28 th April 2009-Lyon Workshop WP 0.2: local Management.
Advanced Remote Tower 1 13 Nov 2007Malmö/Sturup1 Advanced Remote Tower Administrative processes (WP0.1, WP4.3) Malmö/Sturup 13 Nov 2007.
TECHNICAL QUALITY MANAGEMENT Technical Quality Management Co-funded by the Prevention, Preparedness and Consequence Management of Terrorism and other Security-related.
Co-Financed by European Regional Development Fund and made possible by the INTERREG IVC MITKE Overall progress 5th Steering Group Meeting Rzeszów, 30th.
Coordinators' day on FP7 Project Negotiation Description Of Work Annex I Griet Van Caenegem DG CNECT R5 Programme Operations May 28, 2013.
Ismar Financial report procedures. Ismar Financial reporting For each reporting period of activity Each partner shall produce a “Periodic Management Report”
1 FP6 – Financial Management and Reporting 1 April 2006 Sofia, Bulgaria.
Transnational training seminar for potential Lead Partners and Partners to INTEREGG IIIB-CADSES procedures for 3° call for proposal CADSES implementation.
Third PMC meeting University of Priština, Kosovska Mitrovica
4th. Plenary Meeting, Edinburgh, May 2010
EC project periodic and continuous reporting
SOUTH BALTIC CROSS-BORDER CO-OPERATION PROGRAMME
Chisinau, Republic of Moldova 2017
SKADS Controller’s Meeting Timeline Annual Financial Report
CEOS Work planning Steven Hosford, ESA/CNES, CEO
Eurostat Task force on victimisation surveys,
Passenger Mobility Statistics 21 May 2015
Financial Control (FC)
European Statistical System Network on Culture (ESSnet Culture)
WP 1 Management and Coordination
Presentation transcript:

RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme RENAISSANCE - LYON - FRANCE 1 Technical seminar (WP0 – international & local coordination) 7th RENAISSANCE meeting, Lyon, 28th April 2009 Raphaëlle Gauthier Project coordination, Hespul

RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme RENAISSANCE - LYON - FRANCE Objectives To “re-present” the core element of the local coordination tasks To report on observed dysfunctions at local & project level Based on these elements To find collective “corrective measures” to avoid any delay, for the coming years 2

RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme RENAISSANCE - LYON - FRANCE 3 technical session WP0 State of implementation - April 2009 : theoretically, nearly ¾ of the project implementation ! Role of local coordination (overview/management) Read Annex I (full project) - to get an overview of what your community has planned to achieve What has been achieved ? What is missing ? Read next 18 month Report, to get an overview of where partners stand- what they have planned Foreseeing progress and identifying potential problems Report to Project coordinator /PSG when necessary (progress/difficulties) Key element : the success of this project = your partners’ success

RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme RENAISSANCE - LYON - FRANCE 4 Technical session WP0 tasks of local coordinator Administration/Financial management : Management of your community on a everyday basis Provide guidelines and assistance to your partners, that they are able to deliver work in time and/or to let you know if they have problems Supervision of EACH of your partner budget/activities- cf xls document (budget & Activities.xls per partner)- declared/foreseen/Final result- –Financial key documents are A3.1 (full budget) - A.3.3 (next 18 months) in the end of the Annex 1 –Provide overview/assistance on “financial forecasting” : Make sure that financial forecasting “stick” to what is planned (closest to reality).

RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme RENAISSANCE - LYON - FRANCE 5 Management overview Project Management structure

RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme RENAISSANCE - LYON - FRANCE 6 Management overview Local management structure

RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme RENAISSANCE - LYON - FRANCE 7 How to handle reporting process ? Suggestions List of documents (sent by project coordinator) : Deliverables summary: what ? Who’s involved ? Additional information needed ? Template of annual report (caution : all partners covered ? major cost items covered ? next 18 months description ?) Updated financial sheet of xls doc/ Year 3 DG TREN validation ? Local coordination (close collaboration needed with each partner/ local leaders) : Preparation of their xls doc (description + financial declaration) ? + visit each partner ? Adequate fulfilment of xls doc (description activities + financial sheet) Precise consistence between xls doc & Form C & Audit certificate (flexibility : Clause 39) Make sure “major Costs” are justified Assistance to WP Leader on Annual report production (clearly identify what is asked from them + others involved partners/ locally-internationally). FINAL CHECKING : comparison of figures between xls/Form C/Audit certif + check “activity description” in xls doc.

RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme RENAISSANCE - LYON - FRANCE 8 How & what ? The need of having one and single common format for each partner : fulfilment of xls document by partners (Description activities + Financial declaration) + Mandatory Language : English For Annual Report progress : WP (local) leader Who? List of main authors (responsible) : WP0 : WP0.1 : Renaissance coordinator (Hespul/GL) + WP0.2 : local coordinator (GL/Hespul + UdZ) WP1: Renaissance leader by sub-WP, i.e.: WP1.1 (UdZ-FINAL/FINAL), WP1.2 (INSA), WP1.3 (LoM !!??), WP1.4 (Urbic), WP1.5 (UdZ) WP2 : separated annual report for WP2.1/2.2 per community (local leaders: UdZ/ Hespul-Enertech) but common for WP2.3 (INSA + UdZ) WP3 : local Leader (SPLA Lyon confluence + SMZV+EVZ): annual report per community WP4 : Renaissance leader (Hespul) WP5 : Renaissance leader (Ayto.Zaragoza) Deadline : mid- October 2009 : To be sent to the Renaissance Coordinator Example : proposed Methodology for the Reporting Period 4

RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme RENAISSANCE - LYON - FRANCE Example : proposed agenda for Reporting Period 3 Thursday - 18 th September: launch of the procedure (& especially xls doc)! Friday -19 th September 2008: Hespul => Local coordinator all « Budget_activity.xls document”/partner. => EACH Local coordinator to his/her partners Period between 19/09 => 6/10/2008 (2 weeks): Fulfilment of the “Budget_activity.xls document”/partner, with active exchanges with Local coordinator, if necessary. Wednesday 25 th September (Launch of Annual Progress Report per subWP): Hespul => to ALL subWP Leaders + Local Coordinator, with Annual progress report Monday the 6 th October 2008: FINALISATION of Budget_activity xls document sent it to its Local coordinator One week for Local coordinator to double check/verify & validate these xls doc. Monday 13 th Oct.: VALIDATION of “Budget_activity xls document” validated Budget_activity xls document, = BASIS of its Form C + Audit Certificate, + each Annual Progress Report Monday 20 th Oct.: FINALISATION of the ANNUAL PROGRESS REPORT & other Deliverables (see below) + Annexes. Monday, 3 rd Nov.: 1) Each partner should send its definitive Form C + Audit certificate to his/her Local Coordinator. 2) Local coordinator should send all Form C + Audit certificate to Hespul From 3 rd Nov until the end of November: work of Project coordinator (Hespul) 9

RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme RENAISSANCE - LYON - FRANCE Project coordination : Observed dysfunctions during last reporting process Delay to submit financial data, reports, annexes Not using the documentation sent by the project coordinator (but used their “own” documents) Xls document (budget & Activities) = activity description sometimes missing & not in English Activity report not covering all involved partners’ activities, Annex not included or missing No justification of major costs (important for Demonstration; Monitoring,Dissemination (if production), subcontracting activities) ➠ double/triple/etc. checking is then needed (wasting time for all) 10

RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme RENAISSANCE - LYON - FRANCE Corrective measures ? suggestions (from project coordinator) : by local coordinator : to send a short summary /3 months to project coordinator (and PSG ?) on updating local progress (per sub-WP) To make sure that partners have « foreseen » (scheduled) this reporting process in their annual « work plan » Make sure that the “major costs” are “justified” (especially for WP3 + WP2 (monitoring equipments) Meeting each partner far before the annual reporting process To change the calendar to report ?? To be done late summer ? 11