The AHU From A Case Study Presented by David Sellers Portland Energy Conservation Inc. INLAND EMPIRE CHAPTER 1 - 2/27/2002.

Slides:



Advertisements
Similar presentations
Chapter 3. HVAC Delivery Systems
Advertisements

Series L Air conditioners for Laboratories.
HEALTHCARE BUILDING AUTOMATION
Zone Control Air System Why? 1.Provides room by room comfort control. 2.Reduces equipment run time. 3.Eliminates hot/cold rooms. 4.Works with conventional.
Objectives Control Terminology Types of controllers –Differences Controls in the real world –Problems –Response time vs. stability.
Commercial Mechanical Requirements
HVAC 101 The Basics of Heating, Ventilation and Air Conditioning
Heat Recovery for Commercial Buildings
Data Center Controls Mark Hydeman, P.E., FASHRAE Taylor Engineering, LLC
PLANT HVAC SYSTEMS DU-109-PP PLANT HVAC SYSTEMS.
University of Iowa Indoor Practice Facility Outside-the-box HVAC Lincoln Pearce, PE – KJWW Engineering David Hahn – University of Iowa Chilled Water Plant.
Smart Devices. Smart Buildings. Smart Business The Potential for DCx Technology Enabled HVAC Operation Scot Duncan, P.E.
Using Benchmarking to Identify Energy Efficiency Opportunity in Cleanrooms; The Labs 21 Approach William Tschudi and Peter Rumsey June 29, 2004
Engineered Products Make-Up Air for Heating and Cooling.
Presented April 16, 2009 at the ACG Annual Meeting in Chicago, IL. GAYLON RICHARDSON Engineered Air Balance Co., Inc. Houston, Texas 5/7/20151.
WHY USE A FLUID SEALING SPECIALIST? FOR SAFETY & RELIABILITY BECAUSE…….
Engineer Presentation
Technical And Financial Benefits Of Retro-Commissioning Initiatives Society of American Military Engineers Northern Virginia Post January 6, 2011 Presented.
Brett Graham Habegger Corporation Midwest Regional Sustainability Summit May 1, 2015.
Refrigeration and Heat Pump Systems Refrigeration systems: To cool a refrigerated space or to maintain the temperature of a space below that of the surroundings.
Getting Green Building Automation. Why is Building Automation a Green Technology? There are programs starting all over the nation that focus on alternative.
An intelligent VAV zoning system
© 2005 by West Pharmaceutical Services, Lionville, PA. All rights reserved. This material is protected by copyright. No part of it may be reproduced, stored.
CenterPoint Energy Healthcare Energy Efficiency Program (HEEP) CenterPoint Energy Healthcare Energy Efficiency Program (HEEP) November 2013.
Examples of Commissioning Cost Savings Commissioning for Sustained Building Performance September 29, 2011 Marriott Birmingham, AL.
BUILDING MANAGEMENT SYSTEM
Important variables Water: Air: Conversion:
DEA Clandestine Laboratory Training Center Penn State University Architectural Engineering Mechanical Option David M. Potchak.
Announcements Midterm Project Prepare groups of 3 to 4 students You can submit the list at the end of next class Midterm Exam 03/09/10 - In class Exam:
PASBO Building Considerations for Vo-Tech Education March 17, 2011 Pat Adams Dave Kramer Collin Sandifer.
Energy Efficiency in Industrial and Commercial Facilities 2003 Energy and Environmental Conference September 16, 2003.
FRANKLIN engineering group, inc. Start-up Shutdown Malfunction Plan Development and Implementation Duncan F. Kimbro
Scope To develop a interactive electronics control system and fabrication support to design a next Constant Climate Chambers. Existing product with heater,
MBCx Projects – Programs, Process, and Results Soda, Tan, Shields and Wurster David Jump, Ph.D., P.E., Matt Denny, P.E. Quantum Energy Services & Technologies,
Smartcool Systems Inc. Providing effective and reliable energy efficiency solutions for HVAC-R customers around the globe.
Improved Precision Leading to Improved Energy Efficiency Edward Decker AE 790 – Intelligent Buildings June 6, 2006.
November 2004 Low Hanging Fruit Low Cost Energy Efficiency Opportunities in Cleanrooms.
1 Drivers for Building Life Cycle Integrations Jim Sinopoli.
20/10/ PHOS Cooling status (1-20 Oct) Brief 28 Sep start cool down. Steps was: +5, -3, -10, -15, -20, -25, -30°C (by liquid).
Objectives Analyze processes in AHU and buildings.
COMMISSIONING: REDUCING THE CARBON FOOTPRINT (…and Maintenance Costs) (…and Operating Costs)
Lecture Objectives: Clarify issues related to eQUEST –for midterm project Learn more about various HVAC - economizer - heat recovery Discuss about the.
Using Technology to Manage Energy Bob Schoch-Director of Business Administration Tom Schneider-Supervisor of Operations.
How Facilities Can Help Commitment by facilities director Facilities energy committee Energy officer position Include conservation commitment in: Strategic.
Roof Top Unit Overview (MAGNUM) Visit us at Revision- 12/17/2015.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Briefing Chilled Water and Temperature Stability Chris Channing Sr. Project.
Design Intent Phase Design Intent Phase Determine what the design intent is and how the building is to operate when it is complete. Determine what the.
"... To design the control system that effectively matches the plant requires an understanding of the plant rivaling that of the plant's designers, operators,
Introduction to Energy Management. Week/Lesson 13 Control Strategies for Occupant Comfort.
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
Test and Balancing Functional Performance Test Presented by: John Shelander and Dan Acri.
7/15/2002PP.AFD.09 1 of 43 Yaskawa Electric America Variable Frequency Drives In HVAC Applications.
FLEXIBILITY = Tecniplast is ready and willing to satisfy all the customers needs and provide the right solution for a professional outcome STAND ALONE.
HCB 3-Chap 19A: All-Air Systems_Single Zone 1 Chapter 19A: ALL-AIR SYSTEMS: SINGLE ZONE AND SINGLE DUCT Agami Reddy (July 2016) 1)Introduction and common.
WSHP Systems 1.
System Diagrams Symbol Library – Black Background David Sellers
BUILDING HEATING AND COOLING
Story of No-Cost Energy Savings at Ohio Union
HVAC Basics Arkan Arzesh HVAC – Heating, Ventilation, Air-conditioning.
Data Center Controls Mark Hydeman, P.E., FASHRAE Taylor Engineering, LLC
Brian Wallingford, Applications Engineer
Chilled Beam Performance:
The Benefit of Including Energy Recovery System Analysis
Roof Top Unit Overview (MAGNUM)
Engineering Presentation
HCB 3-Chap 19A: All-Air Systems_Single Zone
VITALITY Large Splits Johnson Controls PowerPoint Guidelines | July 21, 2009.
FBE03: Building Construction & Science
Objective Revie the Cooling Cycle Learn about air distribution systems
Presentation transcript:

The AHU From A Case Study Presented by David Sellers Portland Energy Conservation Inc. INLAND EMPIRE CHAPTER 1 - 2/27/2002

2 - 2/27/2002

3 - 2/27/2002

4 - 2/27/2002

5 - 2/27/2002

At the time this was all going on, the clean room conditions were stable and within specifications; 68°F+1-1/2°F, 45%+3% relative humidity /27/2002

Space condition Outdoor condition Leaving preheat coil Leaving fans Leaving reheat coil Leaving cooling coil, as found condition Leaving cooling coil, repaired condition; leaving humidifier, as found condition The process as found was using $5,000 - $7,000 of unnecessary energy per month /27/2002

How Could This Be? Clean room conditions were at spec Fast track design build project  Specific clean room requirements  Non-specific HVAC process requirements Clean room qualification based commissioning focus The nature of the semi-conductor industry business cycle 8 - 2/27/2002

Preheat Problems Shut down steam when its not needed  Integral face and bypass type preheat coil  Valve in place, not control signal Calibrate sensor Add Alarms 9 - 2/27/2002

Preheat Problems Integrate control cycle  Eliminate multimode control approach Operating cycles based on OAT rather than clean room Inconsistent operation  Sequence with chilled water and reheat  Lock out when not required  Maintain an independent low limit /27/2002

Cooling Problems Calibrate sensor  A little tricky with an averaging element  Relative calibration more important than absolute calibration  Lock out when not required  Add alarms /27/2002

Humidification and Reheat Problems Eliminated by the other fixes Improved space sensor calibration routine Add alarms Fan heat provided most of the reheat /27/2002

The cost of correction is projected to be between $4,700 and $8,000. Exact value depends on the hourly rate used. Most of the cost was in facilities engineering labor. Some modest costs were associated with hardware /27/2002

Educating the Operators Ensured Persistence Diligent, talented operators  Lacking training in psychrometrics  Lacking training in clean room process  Informal training provided empowerment  Kept a psych chart by the operators console  Nature of engineering support requests changed  Acted on their own initiative /27/2002

Systems Integration Problems 24 hour per day plant operating spec taken literally  No light switches in the clean rooms  No provisions for coordinated start-up and shut down Power failures and equipment failures caused severe pressure fluctuations in the fab  Contamination issue  Safety issue  Restart issue /27/2002

Systems Integration Problems Multiple power sources on the same system  Controls on uninterruptible power supply  Drives on emergency power with different auto-restart options selected  Control interlock circuit on normal power /27/2002

Power Coordination Coupled with an Assembly Problem for a DISASTER!!! /27/2002

Fab Leakage = Energy Burden + Operational Danger Two parallel, redundant fans designed so:  Only one fan runs  Provides 27,000 cfm at 3.5 inches w.c. Clean room leakage resulted in running both fans to achieve pressurization required  14,000 extra cfm of outside air to move and condition  Static requirement increased to 7 in.w.c.  Duct pressure class was 4 in.w.c.!! /27/2002

Pressure Relief Doors Provide Protection Protect from air hammer effects due to sudden damper position changes. Protect over- pressurized ducts to the extent possible /27/2002

Improved Damper Reinforcement Simply matched factory instructions  Reinforcing plate between sections  Bracing is an alternative approach /27/2002

Permissive Interlocks and Better Quality Limit Switches Start command opens dampers Limit switches proving starts the fan  Wired to work in all selector switch positions  “Local” control mode on the drive disabled /27/2002

HVAC Process/Efficiency Commissioning Benefits Reduction in operating cost and improved performance and reliability in retrocommissioning arena. Reduction in operating cost and first cost with improved performance and reliability in new construction. Reduction in CO 2 emissions. Complements energy savings. Potential for additional financial leverage /27/2002

Barriers to Moving from Qualification Based Approach Rapid fluctuations in the semiconductor market cycle. Short paybacks demanded. Design innovations not embraced. Drive to get on line and in production ASAP. Production process tolerances. Run on detection limits. Extremely costly to ship bad product /27/2002