1 ATF2 - IP Chamber Design and manufacturing of Chamber with high precision piezo actuators for high resolution BPMs Status / progress report – 26 June.

Slides:



Advertisements
Similar presentations
Electrical wiring for piezo movers piezo power supply strain gauges readout temperature probes 1 Frédéric BOGARD – LAL/IN2P3/CNRS – Jan 25, 2013 Electrical.
Advertisements

RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Summary of the discussion for the commissioning session 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 6/ 1/ 2006 T.Okugi (KEK)
Wed 15 Jul 2009 ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 First installation report 15 July 09.
Sta bilization of the F inal F ocus : Stabilization with Nano-Meter Precision.
StaFF: Motion Stabilization with Nano-Meter Precision Proposed experiment conducted within framework of StaFF (Stabilization of Final Focus for ILC). Funded.
D Walters Undulator System June 17, Undulator System Components Status Dean Walters.
IPBPM piezo-mover system and plans for in situ monitoring of calibration and stability Current status and plan for ATF2 Philip Bambade Laboratoire de l’Accélérateur.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
Active Seismic Isolation Systems for Enhanced and Advanced LIGO Jeffrey S. Kissel 1 for the LSC 1 Louisiana State University The mechanical system for.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
Plan for the summer Nobuhiro Terunuma, KEK ATF day: ATF Collaboration Meeting European Linear Collider Workshop ECFA LC2013, May 28,
US CMS DOE/NSF Review: May 8-10, Endcap Alignment Dick Loveless DOE/NSF Review 9 May 2001.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
Installation of FD in September A.Jeremie, B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With the help of KEK, SLAC, KNU and CERN colleagues For.
IN2P3 Les deux infinis G. Balik, B. Caron, L. Brunetti (LAViSta Team) LAPP-IN2P3-CNRS, Université de Savoie, Annecy, France & SYMME-POLYTECH Annecy-Chambéry,
David Urner, Oxford University, RHUL – June StaFF Stabilization of Final Focus Motion Stabilization with Nano-Meter Precision David Urner Paul Coe.
IP-BSM Improvement Work N. Terunuma 2012/6/26 ATF2 Project Meeting.
ATF2 meeting LAPP; David Urner 1 David Urner Paul Coe Matthew Warden Armin Reichold Geoffrey Rayner MPhys alumnus MONALISA Monitoring, Alignment.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
New IP chamber for ATF2 goal 2 Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 Technical Review KEK, 3-4.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
Linac-4 current situation and outlook U. Raich, F. Roncarolo, F. Zocca.
CLIC Permanent Magnet Quadrupole update 1 st December 2010 Mechanical Engineering status N. Collomb1.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
BPM support and beam pipe length FD support status A.Jeremie.
Compressor status AWAKE Technical Board meeting 19 August 2015.
Beam Line Layout – Cooling Section There seems to be two options for energy measurement: at the 180 dipole and/or in a diagnostic branch at the end of.
Highlights and discussion at LAL FKPPL & FJPPL “Toshiko Yuasa” workshop Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay,
ATF2 Accelerator Status and Plans for JFY 2014 runs N. Terunuma, KEK.
QF1 vibration status A.Jeremie A.Jeremie, N.Geffroy, drawings by Araki-san.
Design and Detailed Plan for In Vacuum Diamond Sensor for PHIL and ATF2 S. Liu, P. Bambade, F. Bogard, P. Cornebise, I. Khvastnov, H. Monard, C. Sylvia.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Production and Installation Policy of IP-BPM ATF2 Project Meeting, 2006/12/18 Y. Honda, Y. Inoue, T. Hino, T. Nakamura.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004.
ATF2 Magnets etc. 1. Magnets 2. Power supplies 3. Magnetic field measurement 4. Movers and supports R. Sugahara May 30, 2005.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
LASER FRAME: Straightness monitor (Tentative results of resolution test) Third Mini-Workshop on Nano Project at ATF May 30-31,2005 KEK Nano BPM Group Y.Higashi,
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
IP BPM’s for ATF2 Vladimir Vogel KEK May30, 2005 Third Mini-Workshop on Nano Project at ATF.
Multi-OTR Status A.Faus-Golfe, J.Alabau, C.Blanch, J.V.Civera, J.J.García Garrigós IFIC (CSIC-UV) D.McCormick, G.White, J. Cruz SLAC aand KEK team.
GM sensor tests and installation A.Jeremie K.Artoos, D. Kudryavtsev, Y.Renier, R.Tomas-Garcia, D.Schulte.
Progress of Shintake Monitor Work KEK site meeting August 26, 2009 T. Yamanaka.
ATF2 Report ALCW Kiyoshi KUBO, for ATF2 Collaboration.
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
Ch. Vuitton – BE/BI Presented by R. Veness – BE/BI 18th October
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
ATF2: final doublet support Andrea JEREMIE B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With constant interaction with colleagues from KEK, SLAC.
Design for a New Optical Table of the Shintake Monitor Takashi Yamanaka The University of Tokyo ATF2 weekly meeting 2007/9/26.
1 SLAC RC Status Report 19 July 2010 LHC Collimation Working Group Meeting Jeff Smith/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
ATF2: Accelerator Test facility A.Jeremie LAPP: A.Jeremie LAL: P.Bambade, Shan Liu, S.Wallon, F.Bogard, O.Blanco, P.Cornebise, I. Khvastunov, V. Kubytskyi.
Nanometer stabilisation at ATF2 within FJPPL and FKPPL
Expected hardware status and Priority of the commissioning task
Working plan for 2017 Acquisition and Control Electronics
FFAG Magnets and Girders Meeting
EBTF Design Review Technical Meeting Group
Current Design and Short Status
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
Presentation transcript:

1 ATF2 - IP Chamber Design and manufacturing of Chamber with high precision piezo actuators for high resolution BPMs Status / progress report – 26 June 2012 LAL - IN2P3 - CNRS - Philip BAMBADE, Frédéric BOGARD, Sandry WALLON

2 2 Shims holders Design status (1) 4 External (manual) movers to adjust IP-Chamber position 2 Large aperture extension viewports All parts have a definitive design except : degree extension viewports -Wire scanner extension pipe -Parts fixing chamber to BSM table (front & back -Shims holders Special case : - External (manual) movers reused (see below mover used with current chamber) BEAM

3 Design status (2) 3 tubes assembly type 3 2 Alternative designs for degree extension viewport : A. 3 tubes assy type  Aluminum machining  Electron beam welding (for high precision) B. Shell box type  Slightly wider aperture  SS sheet working  Usual welding process  But some issues to fix 3 windows and guaranty a zero leakage C. Shell box type with single windows  Simple & reliable  The largest aperture  Not normal to 15°laser BEAM Shell box type B Shell box type C

Piezo actuators status (1) 4 4 Cedrat actuators with controllers received at LAL (driving one BPM) Some checks already or to be performed : -Dimensional / displacement -Vacuum

Piezo actuators status (2) 5 4 additional actuators have to be ordered to drive BPM1&2 block. Idea : Get the 4 actuators without the SG and SG controller, but buy 3 external capacitive sensors with controllers  Higher precision measurement (< 1 nm) & true BPM displacement monitoring This improvement can also be added later to BPM3

6 Manufacturing status 6 DONE : Base plate BPM1&2 intermediate plate BMP3 intermediate plate BPM3 mounting bracket IN PROGRESS :Chamber TO BE DISCUSSED with LAPP / others : Viewports & fixture parts BEAM

7 Fabrication, Tests, Installation Piezo actuators received for BPM3 Tests in progress (translation, tilt) – (Bruno Leluan, LAL) Vacuum test (qualification) in May / June – (Bruno Mercier, LAL) Manufacture at LAPP Annecy – (Christine Gasq & Laurent Journet, LAPP) May to August 2012 (machining was started) For some parts, supplier has to be found Geometric and dimensional test (parts machined) : Sept. / Oct. 2012, takes ~ 6 day – (Bruno Leluan, LAL) IP chamber vessel vacuum test : Sept. / Oct. 2012, takes 2-3 weeks – (Bruno Mercier, LAL) "Base plate-piezo actuators-BPM" assembly & operation : Sept. / Oct. 2012, takes 1-2 weeks Installation and tests at KEK : start beginning 2013

8 Questions / decisions & issues Need to receive all final BPMs at LAL early September Is temperature monitoring needed / essential ? If so, who provides it ? External control of low voltage power supplies and readout and integration at KEK (some specs being checked) Staged approach or all at once ? - all actuators - improved motion sensors - mechanical qualification with improved precision Articulation with presently installed high-Q IP-BPM system:  new IP chamber for low-Q IP-BPMs & Goal 2 can be provided by LAL early 2013 if it’s needed for installation at that time