News from ATF2 Frank Zimmermann KEK visit, 20-24 February 2012 Thanks to P. Bambade, M. Barnes, A. Faus-Golfe, K. Kubo, S. Kuroda, T. Naito, T. Okugi,

Slides:



Advertisements
Similar presentations
Sha Bai, Philip Bambade, Glen White FJPPL – FKPPL ATF2 workshop LAL, 11~13 February, 2013 Orthogonality of beam waist corrections in the presence of IPBSM.
Advertisements

ATF2 Interaction Point Beam Size Monitor (Shintake Monitor) Status T. Yamanaka, M. Oroku, Y. Yamaguchi, S. Komamiya ( Univ. of Tokyo ), T. Suehara, Y.
ATF2 FB/FF layout Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 11, 2007.
ATF Cooling Water System Toshiyuki OKUGI, KEK 2015/ 2/ 24 ATF2 Project Meeting LAPP (Annecy, France)
CLIC Kickers: Status and activities for 2013 in view of the budget discussions for 2013 CTC #65 M.J. Barnes CLIC Technical Committee, November M.J.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
ATF2 Progress Report For CLIC Workshop Kiyoshi KUBO.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
ATF2 commissioning in Autumn 2009 for discussion Philip Bambade LAL & KEK LCWS09 BDS session Albuquerque, New Mexico October 1, 2009 on behalf of the commissioning.
IPBSM status and plan ATF project meeting M.Oroku.
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman.
Technical Board ATF2 GM FF progress report A.Jeremie ATF2 GM System team: K.Artoos, C.Charrondière, A.Jeremie, J.Pfingstner (a lot of figures from him),
FFS Issues in the 2011 autumn continuous operation Toshiyuki OKUGI (KEK) 1/13/2011 The 11 th ATF2 project meeting SLAC, USA.
Matching recipe and tracking for the final focus T. Asaka †, J. Resta López ‡ and F. Zimmermann † CERN, Geneve / SPring-8, Japan ‡ CERN, Geneve / University.
June 30, th ATF2 Project Meeting Andrei Seryi for the ATF2 team May 2010 Continuous Run Operation.
D. Angal-KalininEUROTeV Annual Meeting, DESY WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, STFC, Daresbury Laboratory 4 th EUROTeV Annual.
Continuous Run in May K.Kubo. Final Focus Test Line IP; ~40 nm beam ATF Linac (1.3 GeV) ATF Damping Ring (140 m) Extraction Line Photo-cathode.
Summary of Commissioning and Tuning session Philip Bambade LAL-Orsay 5 th ATF2 project meeting KEK, 21 December 2007.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
ATF-II Review by GDE Marc Ross, (SLAC) For GDE Project Managers: Nick Walker and Akira Yamamoto 24 January, th ATF2 Collaboration Meeting.
ATF DR Overview Introduction Low emittance history Present status S.Kuroda ( KEK ) GDE Review 3rd Apr.2013.
Commissioning Status of Shintake Monitor (IP-BSM) T. Yamanaka, M. Oroku, Y. Yamaguchi, Y. Kamiya, S. Komamiya (Univ. of Tokyo), T. Okugi, N. Terunuma,
Mark Woodley, SLACATF2 Project March 20-21, Summary of Tuning, Corrections, and Commissioning.
Highlights and discussion at LAL FKPPL & FJPPL “Toshiko Yuasa” workshop Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay,
Technical Board “issues” Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 Technical Review KEK, 3-4 April.
ATF2 Accelerator Status and Plans for JFY 2014 runs N. Terunuma, KEK.
Optimization of Field Error Tolerances for Triplet Quadrupoles of the HL-LHC Lattice V3.01 Option 4444 Yuri Nosochkov Y. Cai, M-H. Wang (SLAC) S. Fartoukh,
ATF2 Kiyoshi KUBO Accelerator Test Facility (ATF) at KEK ATF – Designed as a prototype of damping ring and injector of LC – Achieved low vertical.
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
July 2, th ATF2 Project Meeting Philip Bambade, Andrei Seryi, Toshiaki Tauchi Summary for TB.
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
Future ATF Plans beyond JFY2012 (From JFY2013) After this, we have to submit final proposal to KEK directorates in May The approval process at KEK.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
ATF2 Report ALCW Kiyoshi KUBO, for ATF2 Collaboration.
Inputs from GG6 to decisions 2,7,8,15,21,27,34 V.Telnov Aug.24, 2005, Snowmass.
ATF2 Software Review LAL June SHORT SUMMARY - Philip Bambade ATF2 weekly meeting July
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
IPBSM Operation 11th ATF2 Project Meeting Jan. 14, 2011 SLAC National Accelerator Laboratory Menlo Park, California Y. Yamaguchi, M.Oroku, Jacqueline Yan.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
ATF2 Software Review LAL June 2008 Philip Bambade & Glen White ATF2 weekly meeting June
Taikan SUEHARA et al., LCWS2007 & DESY, 2007/06/01 R&D Status of ATF2 IP Beam Size Monitor (Shintake Monitor) Taikan SUEHARA, H.Yoda, M.Oroku,
G.R.White: F.O.N. T. From Ground Motion studies by A.Seryi et al. (SLAC) ‘Fast’ motion (> few Hz) dominated by cultural noise Concern for structures.
Wakefield effect in ATF2 Kiyoshi Kubo
2nd ATF2 Project Meeting (May 30, 2006)M. Woodley [SLAC]1 ATF2 Layout/Optics (v3.3) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
Technical Board Summary Preliminary Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 project meeting, Technical.
Status of ATF2 linear collider focus prototype emphasizing France-China joint contributions Philip Bambade Laboratoire de l’Accélérateur Linéaire Université.
ATF2 Status Background for the installation planning of Collimator
Expected hardware status and Priority of the commissioning task
Philip Bambade, Andrei Seryi, Toshiaki Tauchi
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
report from 12th ATF TB & SGC meeting and trip to KEK
CLIC Study Aim Conceptual design report in 2010
Summary of the ATF2 project meeting at LAL (Jan.13-15, 2016)
ATF2 review R. Tomas ATF2 review web:
Junji Urakawa (KEK) for ATF International Collaboration
Strip-line Kicker R&D at KEK-ATF
N. Terunuma (KEK) ILC2010, Beijing, March 29th, /2/28.
Presentation transcript:

News from ATF2 Frank Zimmermann KEK visit, February 2012 Thanks to P. Bambade, M. Barnes, A. Faus-Golfe, K. Kubo, S. Kuroda, T. Naito, T. Okugi, K. Oide, Y. Papaphilippou, D. Schulte, T. Tauchi, N. Terunuma, N. Toge, R. Tomas Status, limits and plan for ATF spot-size tuning Follow up of planned CLIC contributions ground motion sensors, Q1 & Q2 quad’s, extraction kicker Future of ATF beyond 2013/14

ATF related discussions & activities conversation w. Katsunobu Oide about ATF2 future tour of e-beam welding and STF (A. Yamamoto) :30 to ~10 am joining Toshiyuki Okugi for beam-size tuning in ATF control room :00 discussing with T. Tauchi & with J. Urakawa :00 meeting w Nobu Toge on ATF2 future and proposed CLIC contributions :00 further discussions with Junji Urakawa morning ATF control room, IP-BSM tuning :00 ATF operation meeting, reports Naito & Okugi & Oroku discussion with Toshiaki Tauchi on ATF2 future & CLIC :00-15:00 back at CERN - lunch w Angeles Faus-Golfe, discussions on fast kicker plan s with Mike Barnes, Philip Bambade, Nobuhiro Terunuma, A.F.-G.

ATF2 parameters IP parameter nominalApril 2010Dec. 2010February 2012 beam energy1.3 GeV xx 2 nm1.7 nm nm1.84 nm yy 12 pm<10 pm28-64 pm15.6 pm x*x* 4 mm40 mm10 mm y*y* 0.1 mm1.0 mm 0.3 mm x*x*2.8  m10  m7.5  m4.3  m y*y* 35 nm900 nm439 (247?) nm 165 (100?) nm x2.5 x3.0 x3?

ATF IP BSM (Shintake monitor) Shintake monitor shipped from SLAC to Japan under test at U. Tokyo, 2006

ATF IP BSM (Shintake monitor) “Z scan” measured contrast (offset from ideal modulation) at 2 deg

Confusion of signal fluctuation with modulation (if bad S/N) ModulationFluctuation Fluctuation (“fake modulation”) : Δsig / sig ~ 0.18 (for S/N ~ 1/10) If fake M > expected M, it becomes confusing Expected M : 0.17 (300 nm) Expected M : 0.42 (200 nm) M. Oroku, 2011 in 2012 laser system is improved compared with 2011; more careful setup & optimization of laser paths, focusing & stability phase scan: change length of one laser path by changing distance of the delay line with piezo

/ nm (10 measurements RMS) 17 February 2012

IP y spot size tuning relaxed optics:  x,y *=10 mm x 0.3 mm at present expected vertical beam size ~70 nm (  x =1.84 nm,  y =15.6 pm) IP BSM 30 degree mode (no signal at this mode in early 2011) multiknobs for tuning: always scan  y, D y, x’y coupling scan of xy coupling by upstream skew quadrupole – not orthogonal scanning the above three knobs for every step of xy; it would be better to rotate IP BSM, but not possible at the moment fluctuations in DR vertical orbit leads to change in IP beam size optimize, re-scan injected orbit with ZV1X corrector (angle at IP), the dependence is very strong, a change by 0.01 A (3  rad kick;  orbit < 500  m) changes spot size by ~30% first scan of the skew sextupole (placed at D≠0) showed dependence this skew sextupole should compensate for net skew sextupole component in all ATF2 quadrupoles (why is there such component in the first place?) IP BSM size reduction factor - significant, various contributions the real beam size is (~0.8 times?) smaller than measured below about 100 nm one can change to 174 degree mode attempt to scan DR  f rF affected timing synchronization with laser T. Okugi,

example IP multiknob scans  y scan optimum x’y scan optimum  y scan optimum D Y scan optimum=-0.05 T. Okugi,

other example IP scans skew sextupole scan (first ever) optimum + 8A ZV1X (incoming orbit) strong dependence – expected? xy scan optimum -10A T. Okugi,

laser wire scan showed about 165 nm in 10 successive measurements first time switch to 174 degree mode (which should be used for final tuning!): attempt to find optimal focal range position; max modulation of 12 % reached; if true signal this would be a beam size around 100 nm next steps: towards nominal optics (more favorable background conditions and reduced sensitivity to orbit drifts in the high beta quads) further strategy – push only  y * or both  x * and  y *? week 13/2:  * y =1.0 mm ; 20/2:  * y =0.3 mm; 5/3:  * y =0.1 mm - however, backed off to higher  * y on 15/03; saw clear modulation with 30 degrees mode for all optics, but background level and signal jitter are increased for decreasing  * y movable collimator may reduce background chromaticity and geometric aberration scans not yet applied understand orbit effect stabilize extraction line emittance (correlation, orbit feedback?) longer tuning periods, larger team IP y spot size tuning cont’d T. Okugi, & M. Oroku et al,

10 scans with ~160 nm

 y ~100 nm 174 degree mode

history of beam size  y * [nm] Great Eastern Japan Earthquake & Recovery

present limitations laser set up & laser stability, intrinsic reduction factor relaxed optics strategy to move forward? nonlinear field components in final quadrupoles expected to be a limit only <60-70 nm; but observation that beam size strongly depends on vertical drift (angle drift at IP); model prediction? IP BSM Shintake monitor background on-going effort (halo measurements, simulation study of intercepting apertures, GEANT4 modeling of the post-IP and pre-IP regions, bremstrahlung photon collimation, steering optimisation, choice of beta*); improvements needed to go to 10mm x 0.1 mm (new “nominal”) and even more for ultra-low beta*; also stability will become more important emittance in the extraction line risk factor, lately EXT emittance improved significantly, similar to DR values of ~11-12 pm; however large growth at other times with strong dependances on steering conditions (at the septum, etc.) Likely dominated by non-linear fields (based on intensity dependence studies); wjen DR evolves over time the injected beam trajectory into the EXT changes slightly and can sample different regions of the EXT magnets; emittance blows up and background deteriorates; no good procedure to go back to the narrow good path. Two suggested ways to tackle this problem: 1) record history plots of DR + EXT trajectory reconstructions and correlate with EXT emittance; 2) study implementation of slow feedback to maintain injection steering within the "good path" (after carefully recording this "good path") Also, an effect it made to ensure that DR steering and tuning procedures include as constraint to keep the same orbit in the region where the beam is extracted. In the long run, maybe the EXT could also be improved with more instrumentation or better magnets lack of stable tuning time; insufficient training of the team members program for continuous operation would help to achieve more systematic tuning approach, and thus more stability; this requires a larger team of trained operators, to make the effort sustainable over long enough periods; in past weeks, significant progress has been made at KEK in this respect, with essentially only the local ATF staff and Tokyo university students working in the control room; plan to build on this to gradually expand the team of trained operators, such that we can sustain long term tuning efforts at ATF2; this could be critical to reach ATF2 goals; “planned CERN involvement in our new effort for long term stable dedicated operation is also very important, as it will both benefit the project itself and the training of the young people involved on a real system (as opposed to doing only simulation studies)”. P. Bambade

training programme A. Faus-Golfe P. Bambade T. Tauchi from ATF2 Strategy Meeting 15th February 2012

The different training periods proposed are: 1) April 9-13 (person-to-person) / April (operation practice as sub-shift leaders) 2) April (person-to-person) / April (operation practice as sub-shift leaders) 3) April (person-to-person) / May (operation practice as sub-shift leaders) 4) May (person-to-person) / May (operation practice as sub-shift leaders) 5) May (person-to-person) / June 4-8 (operation practice as sub-shift leaders) 6) June 4-8 (person-to-person) / June (operation practice as sub-shift leaders) training programme A. Faus-Golfe P. Bambade T. Tauchi

R. Tomas, ATF TB proposed CLIC contributions/prototype tests for ATF2 & their time line on track next talk? plan consolidated require ATF operation in 2014 and beyond

CLIC extraction kicker for ATF stripline kicker unit itself built with Spanish government money by industry, ready end of 2012; this kicker unit will be installed in the ALBA light source for 6 months until end 2013, to check field uniformity and impedance with beam (PhD thesis), then removed from ALBA again matched pulser (inductive adder) produced at CERN, ready by mid 2014 kicker & pulser can be installed at ATF/ATF2 late 2014 or 2015 if kicker replaces existing extraction kicker: 1.5 m free length, 5 mrad if kicker is installed next to the existing kicker: 0.6 m max. length and larger kick angle needed issues: availability of 15-kV pulser, rigidity of stripline electrodes (deformation from heating caused by SR or wake, difficult masking?) formal proposal for the kicker installation at the ATF: presentation to the next-to-next TB meeting at the end of 2012 or early 2013?! A.Faus-Golfe, M.Barnes, Y. Papaphilippou, N. Terunuma

ATF beyond 2014 “decision process and time line in KEK not clear” (Katsunobu Oide) presently following KEK roadmap new 5-year roadmap to be developed change of KEK management April new trustees will make the decision

New KEK Management Structure from 1 April 2012 DG IPNS IMSS Acc L Adv RL J-PARC Directors nominated Masanori Yamauchi Kazuyoshi Yamada Katsunobu Oide Syuichi Ban Yet to be nominated Atsuto Suzuki JAEA

New KEK Management Structure from 1 April 2012 DG Trustees nominated Yasuhiro Okada Masaharu Nomura Nobukazu Toge Yet to be nominated Atsuto Suzuki Research Promotion Int’l Corporation J-PARC Education Future Research Plan Budget Planning Public Relation Network

other good news following my meeting with Nobu Toge, he, Tauchi-san and Terunuma-san discussed with the KEK DG Suzuki san about the CERN request to know the future plan in view of the proposed hardware contributions the KEK DG indicated that ATF will certainly (or almost certainly) continue beyond JFY 2013 as a central part of the KEK ILC effort; we could ask to get this in writing if (when) required to proceed with hardware development at CERN

LAL Workshop FJPPL-FKPPL Workshop on ATF2 Accelerator R&D from Monday 19 March 2012 at 08:30 to Tuesday 20 March 2012 at 18:30 (Europe/Zurich) at LAL - Orsay Description: Research on the Accelerator Test Facility 2 at KEK (Japan) is conducted at LAL (Orsay), LLR (Palaiseau) and LAPP (Annecy) in the context of the FJPPL "Toshiko Yuasa" and FKPPL Associated International Laboratories, in close collaboration with several Asian, European and American partners. This workshop will review recent activity, progress and plans towards the two main goals of ATF2: Goal 1 (establish and maintain a 37 nm vertical beam size at the interaction point) and Goal 2 (stabilize the beam spot at the interaction point with a 1-2 nm precision using feedback). In addition, an interim review will be organised for several future projects planned to start in 2012 and beyond, covering both their scientific objectives and technical discussions. Organizer: Philip Bambade

FJPPL, FKPPL, FCPPL? FXPPL = France X Particle Physics Laboratory where X = Japan, Korea, China, Vietnam networks co-funded by CNRS, CEA and the funding agencies in the corresponding country, with the goal to promote / foster joint research and various exchanges of personnel, including students P. Bambade

thank you!