Oven controller design documents Martijn Jasperse February 2011.

Slides:



Advertisements
Similar presentations
Systems Approach Universal System INPUT PROCESS OUTPUT
Advertisements

Air and Water Chiller Basic Class
RJ Mann Catalytic Monitoring Systems. RJMCMS 100 Low Cost Single Engine Monitoring System Monitors Pre and Post Catalyst Temperatures, Differential Pressure.
JED Microprocessors Pty Ltd Presenting the JED T430 low-cost Projector Controllers Nov 22nd, 2009.
RWD CONTROLLERS TECHNICAL
I TEC TRAINING This training session will explain how to use ITEC equipment and support learning in the classroom setting. Presented by: R. Schmid.
In this presentation you will:
SAFETY MEETING Off Highway Trucks. Brakes There are four separate controls used for braking Service Brake Retarder Secondary Brake Parking Brake.
CAFS On-Line Orientation
Portable/Desktop Projectors Small and light, ideal projectors for transports.
ROTHENBUHLER ENGINEERING
Introduction To Programmable Logic Controllers
Team 5 Small, Lightweight Speed and Distance Sensor for Skiers & Snowboarders Kunal Verma Manager Justin Erskine Webmaster Temika Cage Presentation Coordinator.
The Tracker Dry Gas system was initially designed as a standalone unit meant to be operated through manual and pneumatically driven valves. The selection.
UNICOS Objects (CPC) 11/02/14 UNICOS, CERN1 CERN, EN/ICE, UNICOS Team.
Pump Application Interface. 30 October 2006 Overview Increases the functionality of the soft starter for pumping applications - four additional trip inputs.
Senior Project – Computer Engineering Integrated Workout Shoe Peter Katlic Advisor – Prof. Cotter Development: Consisting of an 8051 microcontroller.
Open and Closed Loops Standard Grade Computing Studies.
COMPUTER MANAGEMENT. System start-up Before switching on a computer, make sure that all the components are properly connected. The computer must be connected.
Real-Time Systems time dependent control oriented driven by events rather than data.
Industrial Process Control System Simon Hui Engineer Control and Informatics, Industrial Centre.
Chiller basics With Phil Rodin. Things to check when chiller is not running or is in alarm.
SE3910 Week 2, Class 1 Today Basic Circuits Other ??? Tomorrow Lab 2, S365 (Complete prelab BEFORE) Thursday See ScheduleSchedule SE-2811 Slide design:
Module 1: Introduction to PLC
Gauge Operation and Software by Scott A. Ager. Computer Recommendations 750 MHz Pentium III 64 Meg SRAM 40 Gig Hard Drive 1024 x 768 graphics CD Writer.
Performance test and VNAPT. Purpose of Performance test Performance test will check the VNA’s performance to make sure it’s all within the specifications,
LOGIC GATES A logic gate is an elementary building block of a digital circuit.digital circuit Most logic gates have two inputs and one output terminals.
BOOT MODE 1 BOOT MODE 2 BIOS COMMUNICATION DEFAULT CONTROLLER INVERT RELAY OPERATION ENABLE COMM FAIL RELAY CONTROL RELAY OFF / ON COMM.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
Operation Sabbath Mode - SELECT PROGRAM - Lights, alarms and fans Normal Sabbath Overview.
Training Course SuperCool 1000 Level 1 Course #P0131.
Reser- Voir Turbo Pump 1 Five- Fold Turbo Pump 2 Scroll Pump1 Scroll Pump2 Tgt. Cham- ber N2N2 H2H2 P2 P1 P3 P4 P5 P6 Panel Tgt. Cell V2V1 V3 V0 E0 E1.
Digital Temperature Switches The materials included in this compilation are for the use of Dwyer Instruments, Inc. potential customers and.
Prepared by: Engr. Qurban Ali Memon 11ES (SEC- 1 & 2)
HVAC Wiring diagram 5 channel output (5A relay) Speed: High/Medium/Low Mode: Cooling / Heating /Dehumidifier HVAC is a module specially for Air Conditioner.
Service Section Technical Training December 2005.
Microcontroller based system design Asst. Prof. Dr. Alper ŞİŞMAN.
AND Gate Inputs Output Input A (Switch) Input B (Switch) Output Y (Lamp) 0 (Open) 0 (OFF) A B Lamp.
Ref: P.ppt (06/03/2016) 1 EUROTHERM CONTROLS 2704 Vacuum Block.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
QuickBev Group 29: Phillip Nielsen & Michael Perreux TA: Braedon Salz ECE445 Spring 2016 May 4, 2016.
How to Build a Digital Physical System - Lab Lecture 2.
Equipment Familiarization Hanse Environmental Inc. VTC Series.
Software Troubleshooting Eliminate possible programming and timing errors by stopping all programs ( and ). Use the Executive program terminal and send.
Logging and Alarms Apparatus monitored through GPIB – LakeShore temperatures – Agilent power supplies – AMI liquid level monitor Apparatus monitored through.
USER GUIDE TEMPERATURE CONTROLLER TR-2006 Hot runner temperature controller ShenZhen TanRex Electronic Co.ltd.
Hall B Drift Chamber Gas System Proposal. Using New Equipment Ethernet EPICS Analog In Analog Out MKS GE50 Ethernet Switch Ethernet cRIO.
BUILDING LOAD NORMAL OPERATION 1. ATS are in normal position connected to utility source 2. All generator set paralleling circuit breaker open.
Cleaning Mode Startup Mode Spray Mode Maintenance Mode Standby Mode
MACHINE OPERATION.
Louisiana State University Radiation Safety Office
Module 1: Introduction to PLC
FLoor Heating Controller
R1 Fundamentals of Refrigeration
FLoor Heating Controller
You have 5 minutes to look over your table of sensor and outputs ready for a spot check on the different symbols Start Timer 5 mins
You have 5 minutes to look over your homework and with a green pen answer the question in your book or make a correction Start Timer 5 mins
Tracker cooling loop “check out” draft for discussion
COMP211 Computer Logic Design Introduction to the DE2 Board
Physical chemistry experiment
Module 1: System Overview
R1 Fundamentals of Refrigeration
Charge 2. Equipment Protection 3. Definition and Documentation
CTY SAR FCPS Shawn Lupoli, Elliot Tan
Lab 1. Introduction to the DE2 Board
Objectives Construct truth tables for the following logic gates:
easYgen-3000XT Series Training
724 Temperature Calibrator
Compressor Operating Instructions
Presentation transcript:

Oven controller design documents Martijn Jasperse February 2011

State diagram Black arrowsAutomatic Green arrowsUser presses “start” Blue arrowsUser presses “stop” Purple arrowsInput value condition Red arrowsError condition Passive: Monitoring and communication only Cooling: Peltier control active, oven disabled Cooking: Both oven and peltier under active control Active: Only state for which gate valve is opened Upon leaving state gate valve must shut #SOFTERR Power on #COOLPTR #WARMPTR #WAITING #COLD #WMPTRLP #AUTO #CLPTRLP #HEATOVN #COOLOVN #CLOVNLP #HTOVNLP #ACTIVE #READY #SOFTERR #MANUAL

Failsafe procedure #RUNCHK MUST be called at the BEGINNING of each state (and within loops) #FAIL Check vacuum gauge inputs Check thermocouple alarms Check thermistor voltages Calculate, check pressure Calculate temperatures Check oven temperature Check peltier temperature Check for “start”/”stop” Siren Call #DISABLE #FAILED Sanity check inputs to ensure monitors connected, functioning Compute meaningful values, ensure system is behaving Check PID control loops operating properly (if activated) Harsh fail #SOFTERR Bleep Call #DISABLE #WAITING #COLD #SOFTLP Check for override Failsafe state Must manual override/reboot Soft fail Peltiers still running and operational Peltiers not running or problematic #MANUAL GV, oven disabled, peltiers enabled by switch #WAITING Switches off and system safe

Lab equipment... BNCs Amplifiers/dividersAnalog inputs Registers Processing (failsafe program) Watchdog timer LabView monitor GalilLogger DR output Galil RIO State change Keep-alive Analog Processing LCD screen Controller Box SysLog UDP SysLog External devices Communications schematic BEC server