INB-DB-PH, 8 Jun 2007 AB Equipment management and INB CMS perspective INB traceability requirements Implications, need for DB Synergy with Equipment Management.

Slides:



Advertisements
Similar presentations
Configuration management
Advertisements

Software Delivery. Software Delivery Management  Managing Requirements and Changes  Managing Resources  Managing Configuration  Managing Defects 
Network Management Overview IACT 918 July 2004 Gene Awyzio SITACS University of Wollongong.
1 ITC242 – Introduction to Data Communications Week 12 Topic 18 Chapter 19 Network Management.
Requirements Analysis 5. 1 CASE b505.ppt © Copyright De Montfort University 2000 All Rights Reserved INFO2005 Requirements Analysis CASE Computer.
A Decision Support System For Civil Protection Prof. Thanasis Ziliaskopoulos University of Thessaly Hellenic Institute of Transport International Conference.
Agile Testing with Testing Anywhere The road to automation need not be long.
Welcome to CMPE003 Personal Computer Concepts: Hardware and Software Winter 2003 UC Santa Cruz Instructor: Guy Cox.
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
System Design/Implementation and Support for Build 2 PDS Management Council Face-to-Face Mountain View, CA Nov 30 - Dec 1, 2011 Sean Hardman.
CERN IT Department CH-1211 Genève 23 Switzerland t Some Hints for “Best Practice” Regarding VO Boxes Running Critical Services and Real Use-cases.
Configuration Management Process and Environment MACS Review 1 February 5th, 2010 Roland Moser PR a-RMO, February 5 th, 2010 R. Moser 1 R. Gutleber.
Hot Checkout System for Accelerator Operations at JLab Ken Baggett (Team Leader) Theo Larrieu Ron Lauzé Randy Michaud Ryan Slominski Paul Vasilauskis.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
Carmen Maidantchik, Felipe Fink Grael, Kaio Karam, Kathy Pommès ATLAS detector construction/commissioning During the construction and commissioning activities,
: adding and removing zones from Federal University of Rio de Janeiro CHEP’09 International Conference on Computing in High Energy and Nuclear Physics.
ACT – Fourth months later… Prepared by: Martin Gastal Jim Cook 22/03/20111Jim Cook & Martin Gastal.
05/05/2006P.Fassnacht - LEAF1 INB – Status report RPS, RGE: done! Zoning Traceability.
1. There are different assistant software tools and methods that help in managing the network in different things such as: 1. Special management programs.
ITEC224 Database Programming
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
FCS - AAO - DM COMPE/SE/ISE 492 Senior Project 2 System/Software Test Documentation (STD) System/Software Test Documentation (STD)
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
Barriere O, Le Roux P
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
MoEDAL MoU EDMS No Issues from LHCb & CERN  MoEDAL at IP8  Infrastructure  TimePix Deployment  Access & Safety  General Conditions MoEDAL.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
Gnam Monitoring Overview M. Della Pietra, D. della Volpe (Napoli), A. Di Girolamo (Roma1), R. Ferrari, G. Gaudio, W. Vandelli (Pavia) D. Salvatore, P.
CIDB The PSI Controls Inventory DataBase Timo Korhonen, PSI (for the CIDB Team)
Database Administrator RAL Proposed Workshop Goals Dirk Duellmann, CERN.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
CERN Physics Database Services and Plans Maria Girone, CERN-IT
1 15 quality goals for requirements  Justified  Correct  Complete  Consistent  Unambiguous  Feasible  Abstract  Traceable  Delimited  Interfaced.
ALMA Archive Operations Impact on the ARC Facilities.
Introduction CMS database workshop 23 rd to 25 th of February 2004 Frank Glege.
Databases in CMS Conditions DB workshop 8 th /9 th December 2003 Frank Glege.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
CASE (Computer-Aided Software Engineering) Tools Software that is used to support software process activities. Provides software process support by:- –
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
Development of the CMS Databases and Interfaces for CMS Experiment: Current Status and Future Plans D.A Oleinik, A.Sh. Petrosyan, R.N.Semenov, I.A. Filozova,
1 Chapter 12 Configuration management This chapter is extracted from Sommerville’s slides. Text book chapter 29 1.
Evaluating Requirements
CS223: Software Engineering Lecture 2: Introduction to Software Engineering.
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Neutrino Program (MINOS, MINERvA, General) Margaret Votava April 21, 2009 Tactical plan.
Rack Wizard LECC 2003 Frank Glege. LECC Frank Glege - CERN2/12 Content CMS databases - overview The equipment database The Rack Wizard.
Configuration database status report Eric van Herwijnen September 29 th 2004 work done by: Lana Abadie Felix Schmidt-Eisenlohr.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
Report on database work for INB in ALICE Latchezar Betev (ALICE) Information Session INB – June 8, 2006.
Radiation Protection computing tools Gérald Dumont HSE/RP.
Database Issues Peter Chochula 7 th DCS Workshop, June 16, 2003.
Software Test Plan Why do you need a test plan? –Provides a road map –Provides a feasibility check of: Resources/Cost Schedule Goal What is a test plan?
Chang, Wen-Hsi Division Director National Archives Administration, 2011/3/18/16:15-17: TELDAP International Conference.
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
Safety at CERN in the INB Context, J. Poole, July 2007 Safety in the INB Context and its Impact on Access John Poole AB-SU.
Authentication and Authorisation for Research and Collaboration Heiko Hütter, Martin Haase, Peter Gietz, David Groep AARC 3 rd.
Comments on SPI. General remarks Essentially all goals set out in the RTAG report have been achieved. However, the roles defined (Section 9) have not.
© 2003, Cisco Systems, Inc. All rights reserved. 2-1 Campus Network Design.
17 September 2004David Foster CERN IT-CS 1 Network Planning September 2004 David Foster Networks and Communications Systems Group Leader
1 Cryogenics Instrumentation & Controls Commissioning for the LHC AB/CO viewpoint Enrique Blanco AB/CO IS.
 System Requirement Specification and System Planning.
June 2007Dirk Wiedner / PH/LBO-DO1 INB Database for LHCb How to ensure the traceability of material from the controlled area.
P. Paolucci G. Pugliese M.Tytgat
Cabling for LHCb Upgrade
Report on database work for INB in ATLAS
TC activities.
Configuration Management and Layout Database ELENA Project
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
Sustainability and Operational models
Presentation transcript:

INB-DB-PH, 8 Jun 2007 AB Equipment management and INB CMS perspective INB traceability requirements Implications, need for DB Synergy with Equipment Management CMS path from Rack wizard towards a full Equipment Management DB Comments and conclusions on INB and Databases Reminder that this is not a new story……

INB-DB-PH, 8 Jun 2007 AB INB traceability requirements Operation as INB requires that any material from within the INB perimeter (France) which could reach the public domain as waste or otherwise must be “traceable”. ie:- -must know the location vs time of all objects which are, or could turn out to be, radioactive. -must also be able to superimpose the positional history of an object onto a calculated activation map, so that, given the material composition of the object, the level of activation observed can be justified. -objects removed from certain defined zones must be RP screened and the result and date of screening linked to the object. -some objects are tagged as radioactive by definition (within “ZDN” zone). -this ZDN boundary may change (expand) with time. (eg as LHC lumi rises)

INB-DB-PH, 8 Jun 2007 AB Implications, need for DB -All objects likely to move location must be labelled unambiguously -Labelled objects must be associated to physical locations as a function of time -The labelling scheme must allow for an object to spawn daughter objects with a shared common history, followed by individual different histories. -Retroactive definition of previously untraced objects and physical locations must be possible. (eg when dismantling). Self-evidently a case for a relational database: must be user friendly, correspond to reality be backed-up and active for life of expt and beyond

INB-DB-PH, 8 Jun 2007 AB Synergy with Equipment Management Experiments need to manage their equipment hardware configuration -detailed inventory of installed and spare items -fault history used in diagnostic support -configuration specific calibrations or set-up information dependent on the exact hardware configuration and needed by the online system at run start. In the past, databases often custom-built by individual subdetectors Coherence patchy: long-term support and backup often absent CMS commissioning task force brainstorming on managing the attribution of equipment to racks led to the “Rack Wizard” database and user interface implementation by Frank Glege, incorporating the concepts needed for an overall equipment management database, satisfying INB automatically.

INB-DB-PH, 8 Jun 2007 AB CMS EMD developed from “Rack Wizard” “Wizard” used by CMS and several other experiments (and briefly LHC) for planning and managing the physical configuration of equipment in Racks. No central support. CMS does not have the resources to provide this service

INB-DB-PH, 8 Jun 2007 AB …extended to Cabling Management Concept extended to cover management of CMS cabling. (Frank Glege & Stephane Bally). Definition and visualisation of routings, generation of cutting lengths, approval of cable-types, attribution of labels, logging of installed cables. about 50k cables and routings entered in the database Several pragmatic features developed along the way eg -parallel user labels or TS cabling DB labels included in item record. - comprehensive scheme enabling any item or cable destination or routing to be assigned an intelligible visual label+barcode (AB + Ron Pintus) Labelling technology,linked to DB, is in daily use.

INB-DB-PH, 8 Jun 2007 AB Incorporating features such as … 3D visualisation of cable routings and of connected equipment location Link from DB to EDMS for material composition as needed for INB, safety approvals, maintenance and test procedures etc

INB-DB-PH, 8 Jun 2007 AB and also.. Possibility of planning and following installation or maintenance tasks using information in the database on equipment, locations, activity, routings (tool needed for planning interventions and minimising dose to personnel) Much work to be done to develop this fully

INB-DB-PH, 8 Jun 2007 AB Towards a complete EMD CMS (S. Bally, D. Uzunova) now working (somewhat belatedly due to very limited manpower) to catch up with the original concept of applying the “rack wizard” concept to manage the configuration of detector and on-detector elements in an equipment management database, linked to 3-cD visualisation of objects and physical locations in the CMS as-built geometry. This forms part of the online suite of databases and satisfies INB traceability requirements automatically. Many useful tools in place…all needs driven. Pilot project with endcap muon CSC’s running. User feedback crucial. End-product MUST be user-friendly and there Must be a “reality check” mechanism Very close collaboration with IT to ensure architecture and application are consistent with CERN ORACLE strategy and practice.

INB-DB-PH, 8 Jun 2007 AB Databases and INB: CMS comments Incomplete understanding of how to incorporate RP screening information in the database and how to interact with the legal waste management database maintained by SC-RP (frequent hand-off to ISRAM or only once object declared “waste”??) With a little work we could have a standard (expt + machine) RP screening station with barcode reader, RP data-capture into database etc….ATLAS farther advanced with this. Guaranteed availability, longevity and backup may be an issue. Proposed transfer to TS machine maintenance database (MTF) for archive was abandoned. (No convincing argument that this is really adds to the provisions from ORACLE support). For EMD to be effective for CMS users, need to deploy some technology trialled 3 years ago and already in use in ATLAS: “traceability/RP stations” with associated hardware and software: continue productive cross-experiment cooperation and coherence. Very short of resources for this,especially while installation still ongoing. Link of object history to radiation simulation and measurement maps not implemented yet for lack of manpower.

INB-DB-PH, 8 Jun 2007 AB Conclusion From Dec 05 LEAF meeting (AB): Resources for long-term operation as an INB will be considerable for the lifetime of the LHC and beyond - needs professional safety engineers, QA specialists, RP techs, DB experts, admin assistance… - as well as dedicated hardware and facilities (waste repository, screening system, dosimetry system) Common DB support and development (in PH dept, under the oversight and control of the experiments) for common features could be very cost effective. Start with a fellow or PJAS? Any support must be needs driven from the experiments. INB is procedure- and paperwork- heavy and it will get worse. (“retour d’experience” etc) A properly implemented “online” EMD for management of the equipment configuration will, with a few extra additions, automatically satisfy INB traceability needs and save much collaboration effort later in the lifetime of the experiment.

INB-DB-PH, 8 Jun 2007 AB..more from presentation to LEAF 8 Dec 05 Skilled resources for: zoning calculations, hazard analysis, waste/effluent studies, QA study + documentation. Practical implementation of: buffer zones, RP screening, database links, dosimetry to check activation assumptions. Long-term backup of Equipment Management Databases for traceability. Restrictions from indiv/collective dose limits and need to constantly improve. Maintenance and storage of ra materials in use or not yet classified as waste - need for workshops qualified for work on materials classed as radioactive - shipment off-site of equipment within ZDN or RP operational ra zones Long-term responsibility and costs of waste material classed as radioactive - displacement of detector support facilities in ISR Funding agencies will view INB provoked costs as a CERN responsibility Long-term personnel (central, PH & within experiments) for operation as INB. Worries for experiments are approximately unchanged for 4 years! OK

INB-DB-PH, 8 Jun 2007 AB more from presentation to LEAF 8 Dec 05 Estimates originally made for the DoR in 2002, simplified for INBIG report: This table should be re-evaluated over the coming months- emphasis somewhat changed, but It is hard to escape the conclusion that at least 0.5 FTE k/yr per experiment will be needed from 07 - assuming there is properly staffed central support & coordination.