M. Gilchriese Glued Fittings October 5, 2005. M. Gilchriese 2 Samples and Prep Three samples using Hysol 9396 Seven samples using Hysol 9394 Surface prep.

Slides:



Advertisements
Similar presentations
Manufacturing. Frame I manufactured large portions of the frame at home as I felt this was easier done at home an I felt the lab times could be better.
Advertisements

Step-by-step assembly instructions
Paints and Coatings. The Case of the Careening Motorcycle n A motorcyclist is charged with drunk driving (motorcycling?) and with damaging a police car.
Marcello Lunardon - ALICE SPD Meeting 04/02/2003 Problems to be studied Test protocol Thermal conductivity tests What next STATUS OF GLUING AT
22/01/2014I° microEO meeting1 MICRO-COOLING CONNECTORS.
Outer Stave Prototype Update E. Anderssen, M. Cepeda, M. Garcia-Sciveres, M. Gilchriese, N. Hartman, J. Silber LBNL W. Miller, W. Shih Allcomp, Inc ATLAS.
GTK Cooling Summary of frame and cooling plate Shear tests Alessandro Mapelli Michel Morel Jerome Noel Georg Nüßle Paolo Petagna Giulia Romagnoli GigaTracKer.
Connectors 13/03/2013Collaboration meeting CERN - CSEM1.
WUT Experience in Measurements of the Heat Transfer Thought SC Cable Electrical Insulation Jaroslaw Polinski*, Maciej Chorowski*, Michal Strychalski*,
M. Gilchriese Glued Fittings October 26, M. Gilchriese 2 Samples and Prep Three samples using Hysol 9396 Seven samples using Hysol 9394 Surface.
Marc Anduze – 09/09/2008 News on moulds and structures CALICE meeting - Manchester.
M. Gilchriese Status Report Sectors, Rings, Frame December 2002.
Possible HTS wire implementation Amalia Ballarino Care HHH Working Meeting LHC beam-beam effects and beam-beam interaction CERN, 28 th August 2008.
ATLAS Pixel Detector Cooling Connections Testing and Development: Progress Report September 28, 2000 N. Hartman, E. Anderssen, M. Gilchriese, T. Weber,
Reforming and Fixation of Carbon Oxides in Atmospheric Pressure Non- thermal CO/CO 2 Plasmas Robert Geiger Advisor: Dr. David Staack Texas A&M Mechanical.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
ATLAS Pixel Detector July 2001 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report October 11, 2001 N. Hartman, E. Anderssen,
Melting Probe Progress Meeting: Summary of the experiments done and their influence on the new design E. Kaufmann, G. Kargl, N. Kömle Space.
T.Schneider/LHCb Muon EDR
ATLAS Pixel Detector Cooling Services Joining Techniques: Progress Report December 13, 2000 N. Hartman, E. Anderssen, M. Gilchriese, F. Goosen, T. Johnson,
M. Gilchriese Sector Status Module Loading Task Force Meeting November 18, 2004.
Low mass carbon based support structures for the HL-LHC ATLAS pixel forward disks R. Bates* a, C. Buttar a, I. Bonad a, F. McEwan a, L. Cunningham a, S.
M. Gilchriese - April 2001 Disk Sector Status. M. Gilchriese - April Technical Status Three prototypes to current dimensions(8-sector disks) except.
M. Gilchriese Sectors, Rings, Frame Assembly and Installation July 18.
Refurbished Booster RF John Reid October 24, 2012.
ATLAS Pixel Detector Cooling Connections Testing and Development: Progress Report April 26, 2001 N. Hartman, E. Anderssen, M. Gilchriese, F. Goozen, T.
SPD CFSS screening/Harness RB24-RB26 /ALICE Week A. Pepato – INFN PD 1 CFSS and ES electrical screening for SPD Harness RB24-RB26 Electrical.
Hybrid panel heated plate study Currently the curing of the ASIC glue for the hybrid panels are done at room temperature. This is a study to determine.
Production of Petal Mechanics. Petal plates (EUROCOMPOSITE) to be made with T300 skins (+45°/-45°) Second skins (FVT) are M40 (0°/90°) and are available.
Marcello Lunardon - ALICE Gluing Meeting 010/03/2003 Study of glues for the assembly of the ALICE Silicon Pixel Detectors Status at The PADOVA.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
M. Gilchriese Thermal Shock. M. Gilchriese 2 Thermal Shock - Sector 9 Use liquid nitrogen vapor to cool sector rapidly. Setup is just dewar, valve and.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 25, 2004.
1 Monophase Measurements on Prototype Pixel Structures D. Bintinger, M. Gilchriese, J. Taylor and J. Wirth and contributions from D. Cragg, E. Perrin and.
The Development of the Fabrication Process of Low Mass circuits Rui de Oliveira TS-DEM.
Stave Core Thermo-mechanical and Electrical Performance Requirements (Tim) 10/07/2013Liverpool WP4 Meeting (11/7/13)1.
NSTX TF Flag Joint Design Review SUMMARY C Neumeyer 8/7/3.
Experiment 4. The Triple Point A BC The vacuum manifold diagramed schematically in the ClassPak writeup is shown here in the same perspective, with stop-
K.W. Glitza University of Wuppertal IBL Stave (Lessons for Upgrade)
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
M. Gilchriese Towards Fabrication of a Mechanical Prototype Stave.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Conductive glue tests. J.Wickens 12/7/04 Used small pieces of HV kapton cut from redundant (old) stock, glued to silicon test structures from Karlsruhe.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
NSQP MEETING Valery AKHNAZAROV January 20th 2011 Corrugated Panel Bonding Procedure Assembly Name: ISP Corrugated Panel ASM Parts.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
Forms of Energy Openers Mrs. V Science Match each definition to the correct key term A. B. C. D.
Strip Stave Status & Plans at Yale Yale: Paul Tipton, Will Emmet, Tom Hurteau.
DEPFET Workshop, Kloster Seeon, May 2015 Mechanics & IBBelle 1 No news on PXD Mechanics in general Cooling blocks for thermal mock up are at DESY 2 more.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
SeaPerch Structural System
SeaPerch Structural System
Ti/SS transitions A.Basti INFN-PISA*
High Order correctors coil manufacturing
Tracker Outer Barrel COOLING Antti Onnela, CERN.
Testing and installation of prototype diode insulation system in MB2950 Florian Meuter, 3rd Meeting on Diode Consolidation during LS2,
Module Production and Testing at Duke
The Stave Thermo-Conductivity QC Procedure Idea
Gas Monitoring Chamber Production Status
Oasis Well Screens Wire Wrapped Water Well Strainer Screens are made by winding cold-rolled wire, approximately triangular in cross section, around a circular.
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
Energy “Picks” How much do you know?.
SeaPerch Structural System
Step-by-step assembly instructions
Step-by-Step Assembly Instructions – Cube Version
SeaPerch Structural System
28-Feb Feb-19 converted to Mechanical Energy DC Motor Describe how a d.c. motor works: A current-carrying coil in a magnetic field experiences.
Step-by-step assembly instructions
Step-by-step assembly instructions
Presentation transcript:

M. Gilchriese Glued Fittings October 5, 2005

M. Gilchriese 2 Samples and Prep Three samples using Hysol 9396 Seven samples using Hysol 9394 Surface prep tubes –Sandpaper(600) with alcohol –Wash with alcohol –Wash with acetone Surface prep fitting –Brass wire brush with alcohol –Wash with alcohol –Wash with acetone Irradiate to about 25 MRad (exact value TBD) He leak -> P to 15.5 bar -> He leak -> irradiate -> P to 15.5 bar -> He leak

M. Gilchriese 3 Samples After Irradiation Note that epoxy turns blue-like color. No evidence of epoxy running.

M. Gilchriese 4 Before/After Comparison Small weight gain Note that did not try to control electrical contact between fittings and pipe. Resistance after. Did not measure before. Change in leak rate not significant. Small change from setup on different days.

M. Gilchriese Pictures

M. Gilchriese Pictures

M. Gilchriese 7 Cross Section Tube in about Correct Longitudinal position

M. Gilchriese 8 Cross Section Tube not Fully Inserted Big void Glue film

M. Gilchriese 9 First Conclusion Promising but need more testing Thermal cycling about to start Will do pressure cycling also Mechanical strength tests to follow, need to define protocol Need more tests in C3F8 not irradiated and irradiated to understand penetration into epoxy. Bulk epoxy samples Assuming all is OK, better control of glue application and assembly. These samples were done in a hurry.