M. Gilchriese Glued Fittings October 26, 2005. M. Gilchriese 2 Samples and Prep Three samples using Hysol 9396 Seven samples using Hysol 9394 Surface.

Slides:



Advertisements
Similar presentations
Manufacturing. Frame I manufactured large portions of the frame at home as I felt this was easier done at home an I felt the lab times could be better.
Advertisements

Step-by-step assembly instructions
Joseph Epperson, Materials Group Chairman Metallurgical Findings.
Marcello Lunardon - ALICE SPD Meeting 04/02/2003 Problems to be studied Test protocol Thermal conductivity tests What next STATUS OF GLUING AT
SEACORK INSTALLATION ON A CATAMARAN The first step is to make templates of all corner pieces to be cut from sheet material, which will be used for border.
Tube to Foam Interface (Tim). Outline Discuss what’s known about the tube to foam interface – Describe problem – Issues – Theoretical Calculations – Anecdotal.
Outer Stave Prototype Update E. Anderssen, M. Cepeda, M. Garcia-Sciveres, M. Gilchriese, N. Hartman, J. Silber LBNL W. Miller, W. Shih Allcomp, Inc ATLAS.
GTK Cooling Summary of frame and cooling plate Shear tests Alessandro Mapelli Michel Morel Jerome Noel Georg Nüßle Paolo Petagna Giulia Romagnoli GigaTracKer.
Connectors 13/03/2013Collaboration meeting CERN - CSEM1.
PEEK Tube/Core Studies J. Fast, D. Olis, G. Lanfranco, H. Jostlein, B. Nitti, R. Duncan K. Schultz, T. Nebel, R. Davis.
WUT Experience in Measurements of the Heat Transfer Thought SC Cable Electrical Insulation Jaroslaw Polinski*, Maciej Chorowski*, Michal Strychalski*,
M. Gilchriese Glued Fittings October 5, M. Gilchriese 2 Samples and Prep Three samples using Hysol 9396 Seven samples using Hysol 9394 Surface prep.
Marc Anduze – 09/09/2008 News on moulds and structures CALICE meeting - Manchester.
M. Gilchriese Status Report Sectors, Rings, Frame December 2002.
Possible HTS wire implementation Amalia Ballarino Care HHH Working Meeting LHC beam-beam effects and beam-beam interaction CERN, 28 th August 2008.
ATLAS Pixel Detector Cooling Connections Testing and Development: Progress Report September 28, 2000 N. Hartman, E. Anderssen, M. Gilchriese, T. Weber,
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
ATLAS Pixel Detector July 2001 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report October 11, 2001 N. Hartman, E. Anderssen,
T.Schneider/LHCb Muon EDR
Process Planning is the Key to the design and Manufacturing of all Products.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
ATLAS Pixel Detector Cooling Services Joining Techniques: Progress Report December 13, 2000 N. Hartman, E. Anderssen, M. Gilchriese, F. Goosen, T. Johnson,
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
M. Gilchriese - April 2001 Disk Sector Status. M. Gilchriese - April Technical Status Three prototypes to current dimensions(8-sector disks) except.
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
Refurbished Booster RF John Reid October 24, 2012.
ATLAS Pixel Detector Cooling Connections Testing and Development: Progress Report April 26, 2001 N. Hartman, E. Anderssen, M. Gilchriese, F. Goozen, T.
Hybrid panel heated plate study Currently the curing of the ASIC glue for the hybrid panels are done at room temperature. This is a study to determine.
Production of Petal Mechanics. Petal plates (EUROCOMPOSITE) to be made with T300 skins (+45°/-45°) Second skins (FVT) are M40 (0°/90°) and are available.
Shear test with irradiated samples NA62 - DIPTEM Genova – UCL
M. Gilchriese Thermal Shock. M. Gilchriese 2 Thermal Shock - Sector 9 Use liquid nitrogen vapor to cool sector rapidly. Setup is just dewar, valve and.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 25, 2004.
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
Experiment 4. The Triple Point A BC The vacuum manifold diagramed schematically in the ClassPak writeup is shown here in the same perspective, with stop-
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
M. Gilchriese Towards Fabrication of a Mechanical Prototype Stave.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
Cooling Loop Update ATLAS W4 Sheffield Richard French The University of Sheffield + all UK contributors.
Conductive glue tests. J.Wickens 12/7/04 Used small pieces of HV kapton cut from redundant (old) stock, glued to silicon test structures from Karlsruhe.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
NSQP MEETING Valery AKHNAZAROV January 20th 2011 Corrugated Panel Bonding Procedure Assembly Name: ISP Corrugated Panel ASM Parts.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
Strip Stave Status & Plans at Yale Yale: Paul Tipton, Will Emmet, Tom Hurteau.
DEPFET Workshop, Kloster Seeon, May 2015 Mechanics & IBBelle 1 No news on PXD Mechanics in general Cooling blocks for thermal mock up are at DESY 2 more.
1 TRACK CHAMBERS BASED ON PRECISION DRIFT TUBES HOUSED INSIDE 30 mm MYLAR PIPE A.Borisov, N.Bozhko, R.Fakhrutdinov, A.Kozhin, B.Leontiev, A.Levin.
NA 62 – straw detector Content Detector Specifications Chamber design Straw design and specifications Calculations and measurements Prototyping Plans Straw.
Thoughts about PS module assembly Ulrich Heintz, Meenakshi Narain, Bill Patterson, Eric Spencer, Juan Trenado Brown University, Providence 4/16/2015Heintz,
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
Update on Pavia MM mechanical prototype
Ti/SS transitions A.Basti INFN-PISA*
High Order correctors coil manufacturing
Status of straw production straw module assembling
? ENDCAP: Mechanics IFIC-Valencia.
Tracker Outer Barrel COOLING Antti Onnela, CERN.
Testing and installation of prototype diode insulation system in MB2950 Florian Meuter, 3rd Meeting on Diode Consolidation during LS2,
Step-by-step assembly instructions
The Stave Thermo-Conductivity QC Procedure Idea
Materials R. Bates et al..
Gas Monitoring Chamber Production Status
Step-by-step assembly instructions
10-Nov Nov-18 converted to Mechanical Energy DC Motor Describe how a d.c. motor works: A current-carrying coil in a magnetic field experiences.
Step-by-step assembly instructions
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-Step Assembly Instructions – Cube Version
28-Feb Feb-19 converted to Mechanical Energy DC Motor Describe how a d.c. motor works: A current-carrying coil in a magnetic field experiences.
Step-by-step assembly instructions
Step-by-step assembly instructions
SC1R Cold Box PDR Assembly Sequence
Presentation transcript:

M. Gilchriese Glued Fittings October 26, 2005

M. Gilchriese 2 Samples and Prep Three samples using Hysol 9396 Seven samples using Hysol 9394 Surface prep tubes –Sandpaper(600) with alcohol –Wash with alcohol –Wash with acetone Surface prep fitting –Brass wire brush with alcohol –Wash with alcohol –Wash with acetone Irradiate to about 25 MRad He leak -> P to 15.5 bar -> He leak -> irradiate -> P to 15.5 bar -> He leak. Vacuum inside part.

M. Gilchriese 3 Samples After Irradiation Note that epoxy turns blue-like color. No evidence of epoxy running.

M. Gilchriese 4 Before/After Comparison Small weight gain. Note that did not try to control electrical contact between fittings and pipe. Resistance after. Did not measure before. Change in leak rate not significant. Small change from setup on different days. Fine after about 100 thermal cycles. Next step is high pressure He test. Making setup.

M. Gilchriese Pictures

M. Gilchriese Pictures

M. Gilchriese 7 Cross Section Tube in about Correct Longitudinal position

M. Gilchriese 8 Cross Section Tube not Fully Inserted Big void Glue film

M. Gilchriese 9 First Conclusion Promising but need more testing. Simple mechanical test completed(9394B) by constraining tube and applying torque to fitting. Tube deformed first, glue joint did not break. Stopped and leak checked OK. In process of setting up shear tests that will compare irradiated to non-irradiated. And 9394 to Need more tests in C3F8 not irradiated and irradiated to understand penetration into epoxy. Bulk epoxy samples. Assuming all is OK, better control of glue application and assembly. These samples were done in a hurry. Need to understand importance of guaranteed electrical contact. Believe can make contact (by tube contact with fitting at end), which could be checked during assembly. Long term?

M. Gilchriese 10 Capillaries Six samples made with Hysol 9394 All pass He leak -> P to 20 bar -> He leak, Vacuum in part. Setting up to irradiate 4 in C3F8. Will keep other two at 20 bar in the meantime.

M. Gilchriese 11 Capillary Samples