Mission Success Starts With Safety 1 Probabilistic Risk Assessment: NASA Strategy for Capability Enhancement Dr. Michael G. Stamatelatos Manager, Risk.

Slides:



Advertisements
Similar presentations
Role of Senior Management
Advertisements

Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property Mission Success Starts With Safety “September 11th.
A Brief Overview of Emergency Management Office of Emergency Management April 2006 Prepared By: The Spartanburg County Office of Emergency Management.
THE NSF BUDGET Overview of Agency Funding Processes Presented by Beth Blue National Science Foundation Office of Budget, Finance, and Award Management.
Software Quality Assurance Plan
Moving Forward with Safety Management Systems December 9, 2014 Standing Committee on Public Transportation Winter Meeting American Association of State.
The Normalization of Deviance at NASA. Background January 28, 1986 Shuttle engineers were worried about launching at the predicted temperature of 31 degrees.
Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property Mission Success Starts With Safety The Future Role.
Lessons Learned in Initiating and Conducting Risk Assessments within a Risk Analysis Framework: A FDA/CFSAN Approach Robert Buchanan DHHS Food and Drug.
Risk Assessment & Risk Management at GSFC
Federal Aviation Administration Commercial Space Transportation Human Space Flight Occupant Safety Telecon Telecon 7 – Medical Guidance for Crew & Spaceflight.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
The Australian/New Zealand Standard on Risk Management
Fundamentals of Information Systems, Second Edition
Annex I: Methods & Tools prepared by some members of the ICH Q9 EWG for example only; not an official policy/guidance July 2006, slide 1 ICH Q9 QUALITY.
SPACECRAFT ACCIDENTS: EXAMINING THE PAST, IMPROVING THE FUTURE Overview and Challenger Case Study Bryan Palaszewski working with the Digital Learning Network.
Acquiring Information Systems and Applications
PMSS Final SOW May 22 nd, Statement of Work 2 GLENN RESEARCH CENTER PROJECT MANAGEMENT SUPPORT SERVICES (PMSS) The Contractor shall provide expert.
NACMPI November 15-16, 2005 Risk-Based Inspection Dr. Barbara Masters Administrator, Food Safety and Inspection Service Philip Derfler Assistant Administrator,
Visual 3. 1 Lesson 3 Risk Assessment and Risk Mitigation.
July 18, 2001 Mission Success Begins With Safety Quality Leadership Forum Software Quality Assurance at GSFC Dr. Linda H. Rosenberg Chief Scientist for.
VPPPA Mentoring Program. The VPPPA Mentoring Program is a formal process to assist companies and facilities interested in participating in the Voluntary.
A Proposed Risk Management Regulatory Framework Commissioner George Apostolakis Presented at the Organization of Agreement States 2012 Annual Meeting Milwaukee,
Risk Management - the process of identifying and controlling hazards to protect the force.  It’s five steps represent a logical thought process from.
1102 Contract Specialist as a Business Manager Debbie Bartlett Defense Acquisition University.
Chapter 13: Developing and Implementing Effective Accounting Information Systems
Emergency Planning Steps 5 steps in emergency planning Step 1: Establish a team Step 2: Analyze capabilities and hazards Step 3: Conduct vulnerability.
1 Introduction to Evaluating the Minnesota Demonstration Program Paint Product Stewardship Initiative September 19, 2007 Seattle, WA Matt Keene, Evaluation.
A Perspective on the NASA Space Power and Energy Storage Roadmap National Research Council Panel Power Workshop March 21, 2011 H. Sterling Bailey, Ph.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Surveillance Planning Team Initial Team Meeting January 9-10 NASA Headquarters Team Introduction Revision A Tom Whitmeyer - OSMA Jeff Cullen - Procurement.
Slide 1V&V 10/2002 Software Quality Assurance Dr. Linda H. Rosenberg Assistant Director For Information Sciences Goddard Space Flight Center, NASA
Federal Aviation Administration Presented to: By: Date: Oversight Throughout the Supply Chain: Is It Adequate? DOT OIG Audit: Assessment of FAA's Risk-Based.
National Aeronautics and Space Administration From Determinism to “Probabilism” Changing our mindsets, or why PTC isn’t an easy sell - yet.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
ENGINEERING LESSONS LEARNED AND SYSTEMS ENGINEERING APPLICATIONS Paul S. Gill and Danny Garcia, NASA Technical Standards Program Office William W. Vaughan,
LABORATORY MANAGEMENT The Administrative Process.
Training and Developing a Competitive Workforce 17/04/2013.
ISM Annual Review and Declaration Lessons Learned CH2M HILL Hanford Group John McDonald.
Fundamentals of Information Systems, Second Edition 1 Systems Development.
NOAA Cooperative Institutes John Cortinas, Ph.D. OAR Cooperative Institute Program, Program Manager NOAA Cooperative Institute Committee, Chairperson.
The Augustine Committee Review of Human Spaceflight Plans Committee Briefing to COMSTAC October 29, 2009 Review of US Human Space Flight Plans Committee.
Do Work Safely DOE Hanford Site Recovery Act Support to New Workers Ted Giltz Hanford Site Recovery Act Project Manager
Systems Accreditation Berkeley County School District School Facilitator Training October 7, 2014 Dr. Rodney Thompson Superintendent.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
SAFETY MANAGEMENT SYSTEM IN TURKISH STATE RAILWAYS (TCDD)
1 American Recovery and Reinvestment Act of 2009: Challenges Facing the Department of Transportation and the Office of Inspector General’s Strategy for.
1 NASA Office of Procurement NASA Procurement Tenets April 15, 2008 SMC Brief Bill McNally Assistant Administrator for Procurement.
Module 4: Systems Development Chapter 13: Investigation and Analysis.
Probabilistic Risk Assessment and Conceptual Design Bryan C Fuqua – SAIC Diana DeMott – SAIC
Continual Service Improvement Methods & Techniques.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
 NASA History A look through the years. Beginnings  NASA was created by congress on October 1, 1958 as a way of competing with the Soviet Union at the.
Subcommittee on Hydrology, ACWI New Extreme Storm Work Group Status and Plans.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Cmpe 589 Spring Fundamental Process and Process Management Concepts Process –the people, methods, and tools used to produce software products. –Improving.
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
 Overview of Project management. ◦ Management. ◦ Project Management. ◦ Software Project Management. ◦ Project(Dimensions, Characteristics, Complexity,
PRA: Validation versus Participation in Risk Analysis PRA as a Risk Informed Decision Making Tool Richard T. Banke– SAIC
Air Carrier Continuing Analysis and Surveillance System (CASS)
Health Resources and Services Administration (HRSA)
HSE Case: Risk Based Approach.
Agenda Purpose for Project Goals & Objectives Project Process & Status Common Themes Outcomes & Deliverables Next steps.
An Assessment of Space Shuttle Flight Software Development Processes
GSBPM AND ISO AS QUALITY MANAGEMENT SYSTEM TOOLS: AZERBAIJAN EXPERIENCE Yusif Yusifov, Deputy Chairman of the State Statistical Committee of the Republic.
System Safety Regulation
Jeff Dutton/NASA COR August 26, 2019
Presentation transcript:

Mission Success Starts With Safety 1 Probabilistic Risk Assessment: NASA Strategy for Capability Enhancement Dr. Michael G. Stamatelatos Manager, Risk Assessment NASA Headquarters Office of Safety and Mission Assurance (202)

Mission Success Starts With Safety 2 Outline Introduction PRA History at NASA NASA PRA Capability Improvement Strategy On-Going Efforts

Mission Success Starts With Safety 3 Introduction

Mission Success Starts With Safety 4 PRA Simply Described

Mission Success Starts With Safety 5 Types of Risk and Related Consequences Deaths, injuries, illness Contamination, loss of use Money lost Mission, schedule, etc.

Mission Success Starts With Safety 6 Risk Sources in Safety Risk Assessment Hardware Failures Hardware Failures Organizational Factors Organizational Factors External Events, Acts of Nature External Events, Acts of Nature Human Error Increasing degree of complexity in modeling

Mission Success Starts With Safety 7 Risk Assessment & Management Qualitative Risk Assessment FMEA FTA Qualitative Risk Assessment FMEA FTA Quantitative Risk Assessment Initiating Events Scenario Modeling (MLD, ESD, ETA, FTA) Risk Quantification Uncertainty Evaluation Quantitative Risk Assessment Initiating Events Scenario Modeling (MLD, ESD, ETA, FTA) Risk Quantification Uncertainty Evaluation Inputs Mission Success Criteria Technical Data Cost Schedule Management Procedures Other Improved Safety & PerformanceImproved Performance

Mission Success Starts With Safety 8 Benefits of PRA Probabilistic Risk Assessment (PRA) has proven to be a systematic, logical, and comprehensive tool to assess risk (likelihood of unwanted consequences) in modern technological applications (e.g., nuclear power, electric power generation, chemical processing industry), for:  Improving system performance & mission success  Increasing safety in design, operation & upgrade  Saving money in design, manufacturing, assembly and operation

Mission Success Starts With Safety 9 When Should PRA Be Performed?  When important decisions must be made about complex systems under uncertainty  When information is not sufficient to comprehensively assess strengths and weaknesses of complex systems by other means  When important complex jobs must be performed successfully for the first time  In all life cycle phases of a complex system

Mission Success Starts With Safety 10 Brief History of PRA at NASA

Mission Success Starts With Safety 11 Beginning with the Challenge of Apollo... “I believe that this nation should commit itself to achieving the goal, before this decade is out, of landing a man on the moon and returning him safely to the earth.” -- President John F. Kennedy, May 25, 1961  Early Apollo program estimate of mission success probability was approximately not what people wanted to hear.  On July 20, 1969, the human race accomplished its single greatest technological achievement of all time when a human first set foot on another celestial body.  5 additional successful Moon missions (out of 6 attempts) occurred between 1969 and 1972 = 6 out of 7 = 0.86 demonstrated mission success.  So much for PRA in NASA for a long time to come!  Instead NASA would rely on FMEAs

Mission Success Starts With Safety 12 …Then Challenger  January 28, 1986, after 25 successful flights, the Space Shuttle Challenger explodes.  October 29, 1986, “Investigation of the Challenger Accident,” by the Committee on Science and Technology, House of Representatives:  “Without some means of estimating the probability of failure of the various [Shuttle] elements it is not clear how NASA can focus its attention and resources as effectively as possible on the most critical systems.”  January 1988, “Post-Challenger Evaluation of Space Shuttle Risk Assessment and Management,” by the Slay Committee:  “The Committee recommends that probabilistic risk assessment approaches be applied to the Shuttle risk management program at the earliest possible date. Data bases derived from STS failures, anomalies, and flight and test results, and the associated analysis techniques, should be systematically expanded to support probabilistic risk assessment, trend analysis, and other quantitative analyses relating to reliability and safety.”

Mission Success Starts With Safety 13 The Return to PRA  Dec. ‘87 -- Space Shuttle Proof-of-Concept Study  Feb. ‘88 -- Space Shuttle Main Propulsion Pressurization System PRA  Nov. ‘88 -- Enhanced Hazard Analysis for Space Systems  Apr. ‘89 -- Independent Assessment of Shuttle Accident Scenario Probabilities for the Galileo Mission  Jul. ‘90 -- Space Station Freedom -- External Maintenance Task Team -- Final Report -- the “Fisher-Price Study”  Dec. ‘90 -- Safety of the Thermal Protection System of the Space Shuttle Orbiter -- Quantitative Analysis and Organizational Factors  Jun. ‘ ’ High Temperature Tunnel LaRC)  ‘92 -- Advanced Solid Rocket Motor Field Joint Case Sealing System Leak Check vs. No Leak Check

Mission Success Starts With Safety 14 The Return to PRA (cont’d)  Jul. ‘92 -- Risk Assessment of the ASRM Propellant Manufacturing Facility  Jul. ‘93 -- Reliability and Requirements Analysis for Space Exploration Initiative Vehicles: Comparative Risk Assessment -- the Space Shuttle and an All Rocket Single Stage to Orbit Vehicle  Sep. ‘93 -- An Analysis of Selected Risk Factors and Uncertainties for Space Station Assembly Up to Human Tended Condition for Space Station Transition Options A1 and A2  Jan. ‘94 -- An Investigation of the Risk Implications of Space Shuttle Solid Rocket Booster Chamber Pressure Excursions  Feb. ‘95 -- PRA of the Space Shuttle -- A Study of the Potential of Losing the Vehicle During Normal Operations  And others including PRA work done in support of Ulysses and Cassini missions.

Mission Success Starts With Safety 15 The NASA Administrator Steps In...  July 29, 1996, the NASA Administrator, Dan Goldin:  “Since I came to NASA [1992], we’ve spent billions of dollars on Shuttle upgrades without knowing how much they improve safety. I want a tool to help base upgrade decisions on risk.”  Earlier “paper PRAs” prepared by NASA contractors would not serve the purpose.  October 1997, an early version of the NASA Quantitative Risk Assessment System (QRAS) is demonstrated to the Administrator.  February 1998, Version 1.0 of QRAS is baselined.  Two other intermediate version have been tested  March 2001, Version 1.6 of QRAS will be delivered. It will have full PRA capabilities.

Mission Success Starts With Safety 16 Space Shuttle » Johnson Space Center and Marshal Space Flight Center have been modeling their Shuttle elements. » Space Shuttle Program has begun to factor risk into their Upgrades Program.

Mission Success Starts With Safety 17 International Space Station  The NASA Advisory Council recommended, the NASA Administrator concurred, and the ISS Program has begun a PRA. » First portion of PRA (through Flight 7A) delivered in Dec. ‘99; 2nd portion (through Flight 10A) expected in Dec. ‘00. » Using the SAPHIRE software application for conducting PRA.  Objectives of ISS PRA: » Provide a quantitative look at ISS operations risk » Provide a model for future ISS safety decision-support activities » Provide a model for safety related operations planning » Provide a model for trading marginal safety enhancements versus cost

Mission Success Starts With Safety 18 Mars Sample Return Mission  Mission must meet a Planetary Protection Program criterion of <10 -6 probability of Earth contamination upon return of sample  Use of PRA is being seriously considered as a means to evaluate mission compliance with the PPP criterion

Mission Success Starts With Safety 19 The Risk Management Picture at NASA NASA Procedures and Guidelines A, “NASA Program and Project Management Processes and Requirements,” April 3, 1998 – Requires NASA Program & Project Managers to manage risk formally – We are seeing evidence of real risk management in numerous NASA projects – Risk management is a factor in high-level program/project decision- making “Continuous Risk Management” training course developed and pilot- tested on numerous NASA project teams – To be picked up by NASA’s APPL in FY 01 Risk-Based Acquisition Management (R-BAM) – Interim rule entitled “Risk Management,” -- published in Federal Register June 14, 2000; effective July 14, 2000 – Changes NASA Supplement to the Federal Acquisition Regulations (FAR) to emphasize considerations of risk management in the acquisition process

Mission Success Starts With Safety 20 Strategy for PRA Capability Enhancement

Mission Success Starts With Safety 21 Current PRA Status at NASA Good News:  Strong management interest and support for PRA  In-house experience with traditional FMEA and some FTA Bad News:  Scarce and scattered PRA resources (people, tools, data)  No corporate memory on PRA past work and data  Inadequate communication and cooperation on PRA among Centers and with HQ

Mission Success Starts With Safety 22 NASA Objective For PRA Develop a world-class in-house capability to perform, manage, and use Probabilistic Risk Assessment (PRA) methods at NASA

Mission Success Starts With Safety 23 Ingredients for Success from Experience  In-house expertise to perform, manage and use PRAs to make sound decisions  In-house ownership and corporate memory of PRA methods, tools, databases and results  Lowest dependence on outside help to manage, perform, understand, and use PRA methods and results to make management decisions

Mission Success Starts With Safety 24 NASA PRA Capability Growth Model Total Dependence on External Consultants NASA is Only a Customer of Its PRA Projects NASA on a PRA Learning Curve; Takes Leadership in PRA Consultants Provide Transfer of Technology and Support in PRA NASA With PRA Experts; Manages/Performs PRA Projects Outside PRA Consultants Just Provide Support Today Near-TermLong-Term 1-2 years 2-5 years Time frame RoleShiftRoleShift PRA RenaissanceAge of PRA Enlightenment

Mission Success Starts With Safety 25 Essential Elements for PRA Strategy  Develop NASA personnel skilled in PRA to transfer the state-of-the-art PRA technology to  Develop/adopt NASA-wide PRA policy, procedures, computer tools  Develop, coordinate & maintain PRA databases (reliability, maintenance, initiating events, etc.)  Foster communication and cooperation of efforts throughout NASA  Integrate and coordinate PRA efforts throughout NASA

Mission Success Starts With Safety 26 Strategy Implementation Roles NASA HQ  Organize, coordinate and conduct awareness and practitioner PRA training  Develop PRA policy and procedures  Mentor and provide specialized PRA assistance  Coordinate use of PRA computer tools and consultants  Manage the PRA process and oversee PRA quality NASA Centers  Work with HQ to implement PRA strategy  Manage and perform PRA projects  Provide local PRA expertise and support in training, consulting and mentoring PRA projects  Become local custodians of PRA data and software

Mission Success Starts With Safety 27 We are Up and Running...  Initiated work on PRA policy and PRA awareness and practitioner training  Started effort on PRA Procedures Guide for aerospace applications  Began cooperation with NRC, USG agency most experience in PRA  Acquired SAPHIRE PRA computer program and conducted training at HQ and Centers; Trained 50 people to date.  Organized PRA information exchange workshop (this workshop) and the development of NASA-wide PRA working group  Started cooperation with ESA on PRA policy and procedures  Planning additional workshops on PRA and on risk-based decision making for management applications

Mission Success Starts With Safety 28 Conclusion NASA needs your help, support and cooperation to reach our PRA objective for the benefit of NASA and its Centers