Dr. Godfried Williams1 Project Management – Topic 6 Lecture Content Planning Tools/Techniques Optimization Techniques Resource Planning & Allocation Linear.

Slides:



Advertisements
Similar presentations
Chapter 17 Project Management McGraw-Hill/Irwin
Advertisements

Estimating, scheduling and budgeting
ES=32 EF=34 LS=33 LF=35 ES=10 EF=16 LS=10 LF=16 ES=4+6=10 EF=10 LS=4
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
Project Management and scheduling Objectives of project scheduling Network analysis Scheduling techniques.
Operations Management Session 27: Project Management.
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
1 Topics to cover in 2 nd part ( to p2). 2 Chapter 8 - Project Management Chapter Topics ( to p3)
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
Chapter 4: Schedule, cost, and situation analysis (pt. 1) ISE 443 / ETM 543 Fall 2013.
MGMT 483 Week 8 Scheduling.
CHAPTER 4 MANAGING PROJECT PROCESSES. THE CONCEPT A project is an interrelated set of activities that has a definite starting and ending point and that.
Chapter 10 Project Scheduling: PERT/CPM
BA 333 Operations Management
Project Management An interrelated set of activities with definite starting and ending points, which results in a unique outcome for a specific allocation.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Project Management OPIM 310-Lecture.
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 6 Project Management To Accompany.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
Operations Management Contemporary Concepts and Cases Chapter Fourteen Project Planning and Scheduling Copyright © 2011 by The McGraw-Hill Companies,
MANA 705 DL © Sistema Universitario Ana G. Méndez, All rights reserved. W6 6.2 Operation Management Operation Management Managing Projects Techniques.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
1 Project Management Chapter Lecture outline Project planning Project scheduling Project control CPM/PERT Project crashing and time-cost trade-off.
Objectives 4 Understand the basic concepts of project planning and control 4 Explain PERT and Timeline (Gantt) charts.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 17 Project Management Part.
1 Project Planning, Scheduling and Control Project – a set of partially ordered, interrelated activities that must be completed to achieve a goal.
McGraw-Hill/Irwin© 2008 The McGraw-Hill Companies, All Rights Reserved Developing a Project Plan Chapter 6.
Project Management (專案管理)
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
Advanced Project Management Project Time Management Ghazala Amin.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 6 Project Management To Accompany.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
CPM – Critical Path Method Can normal task times be reduced? Is there an increase in direct costs? Additional manpower Additional machines Overtime, etc…
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
TK3333 Software Management Topic 6: Scheduling. Contents  Estimate the duration for each activity  Establish the estimated start time and required completion.
Project Planning & Scheduling What is a “project”? Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time Networks.
Chapter 4 MIS Project Management Lecturer Sihem Smida Sihem Smida Developing a project plan.
Activity Planning. Effort estimation – For whole project – For individual activity Detailed plan – Starting of each activity – End of each activity –
Scheduling Scheduling : is the process of converting a project action plan into an operating time table. Why scheduling ? To answer the following questions:
Chapter 16 – Project Management
PERT CPM assumes duration of activity is known with certainty.
PROJECT MANAGEMENT.
Project Management (專案管理)
Project Management Chapter Topics
Project Management: PERT/CPM
Chapter 17 Project Management McGraw-Hill/Irwin
Project Planning & Scheduling
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
PERT and CPM.
Project Planning & Scheduling
Project Management and scheduling
Project Planning and Budgeting
Probabilistic Time Estimates
Project Scheduling: networks, duration estimation, and critical path
SE Tasks for a Concept Development Project
Chapter 16 – Project Management
Managing Service Projects
Project Time Management
Importance of Project Schedules
Project Time Management
Presentation transcript:

Dr. Godfried Williams1 Project Management – Topic 6 Lecture Content Planning Tools/Techniques Optimization Techniques Resource Planning & Allocation Linear Programming

Dr. Godfried Williams2 Planning Tools Tools/Techniques List of activities Diaries Bar charts Gantt charts Networking PERT (Programme Evaluation Review Technique) CPM (Critical Path Method) Optimization & Resource Allocation

Dr. Godfried Williams3 Overview of Project Management Resources that a planning engineer has to co-ordinate. People/Skill/Manpower money Materials/Logistics Machines ) eg. Computers time

Dr. Godfried Williams4 Steps to achieve project objective. establish the objective/strategy define the scope of work/activities arrange the activities into a plan estimate the cost, time and resources(CTR) for each activity analyze the network optimize the network to form a base plan monitor progress against the plan measure variances and forecast/trends re-plan against objectives

Dr. Godfried Williams5 THE OBJECTIVE To exploit the reserves of block x and y at an acceptable profitability to the company. Optimise or maximise resources x and y to achieve objective z. (Linear Programming technique to allocate resources)

Dr. Godfried Williams6 Scope of work Translate the objectives into the scope of work. Feasibility stage Analysis stage Conceptual design stage Detailed design Construction or Implementation(coding) conversion Changeover Production (going online or live)

Dr. Godfried Williams7 Planning the project Create a list of high level management activities. Convert high level activities to low level tactical & operational activities. Construct the network by identifying ES,EF,LS,LF.

Dr. Godfried Williams8 PERT (Programme Evaluation Review Technique) Addresses Uncertainty in the duration of the project using 3 time estimates Optimistic Most likely Pessimistic (These estimates are used in calculating the “expected time” of the project)

Dr. Godfried Williams9 3 Time Estimates Optimistic Time The minimum time, a, an activity will take. Most likely time The most likely time, m, is the normal time to complete the Job. Pessimistic time The pessimistic time, b, is the maximum time an activity could take

Dr. Godfried Williams10 How to derive the time estimates ? The time estimates are obtained from the most knowledgeable experts about difficulties likely to be encountered and the variability in time during the project Expert Estimators or those who will manage the project

Dr. Godfried Williams11 Time Estimates based on Beta Distribution Time estimates related in the form of a Beta Distribution because it is unimodal (finite end points and not necessarily symmetrical). A property that is desirable for a distribution of activity times

Dr. Godfried Williams12 Calculating the “Expected Time” Based on this distribution, the mean or expected time, t e, and the variance, V, of each activity are calculated with time estimates a, m, b using the formulas: t e = a + 4m + b 6 V = b – a 2 6 The variance, V is a measure of variability in the activity completion time

Dr. Godfried Williams13 Example – Figure 1 (See calculation on slide 14) 035 Start of Activity Most likely, m 13 Optimistic, a Average, t e Prob. Of t Activity duration time t (days) Pessimistic b 6

Dr. Godfried Williams14 Calculation for Figure 1 t e = 3 + 4(5) + 13 = 6 days 6 V = 13 – 3 2 = (1.67 days) 2 = The larger V, the less reliable t e. and the higher the likelihood that the activity will be completed much earlier or later than t e,. In a standard project estimates a and b are close to each other, V is small and t e is more reliable.

Dr. Godfried Williams15 Expected Duration of Project T e =  t e CP Where t e are expected times of the activities on the critical path

Dr. Godfried Williams16 Variance in the project duration V P =  V CP Variance of project duration distribution is calculated as the sum of the variances of the activity durations along the CP

Dr. Godfried Williams17 Guidelines to forming a network. Start time Earliest start time Latest start time Finish time Earliest finish time Latest finish time Float Total Float = LS - ES or LF - EF Free Float = float on the critical path Activity Dummy activity Events as Nodes - Milestones

Dr. Godfried Williams18 Estimating Rules to be observed estimating time. Duration should be estimated after the logic has been defined. Duration should be based on scope of work and resources required. Time estimate is based on assumptions. Very few estimates are 100% certain or unalterable.

Dr. Godfried Williams19 Time Analysis Activity Number Description Duration(weeks) Earliest Start Earliest Finish(ES + Duration - 1) Latest Start Latest Finish Float Total Float Free Float Critical Path & Activities

Dr. Godfried Williams20 Determining Critical Path & Activities Rule 1 - The early start (ES) time for a particular activity is the same as the late start(LS) time. Rule 2 - The early finish (EF) time for a particular activity is the same as the late finish (LF) time. Rule 3 - The ES or LS added to the duration of the activity results in the EF or LF.

Dr. Godfried Williams21 Resource allocation & Scheduling(optimization) Allocating the right resource to the right activity. eg money time labour equipment materials Logistics (support)

Dr. Godfried Williams22 PRINCE Structured Project Management Method Programme plan Project plan Stage plan Team plan PRINCE Plans Exception plan

Dr. Godfried Williams23 PRINCE Project Management Method (Contents & stage plans) Product breakdown structure Product flow diagram Activity network Financial budget Resource requirements Risk assessment Quality plan Gantt charts Product descriptions for major products

Dr. Godfried Williams24 Example Network diagrams